There has been significant progress at the Amici House construction site at 661-701 Spencer Road. The 7,010 SF Harriet Giannelis Childcare Center (which will host headstart classrooms and daycare facilities) is fully framed, roofed, fitted with windows, and most of the exterior siding (unsure at a glance if it’s CertainTeed vinyl or fiber cement lap siding, though the top color looks like CertainTeed “Autumn Red”) has been attached. Even some of the trimboards have already been attached along the front entry/porch. It would seem likely that, if logistics provide for it, the building could be open for its first students in the fall.

To be honest, the design is a bit of a surprise – the original building design by Schickel Architecture was the same size but looked quite different, and the revisions were never uploaded (maybe the planning and building department had something on file, but there was nothing online). Note that most of that front-facing concrete slab is going to backfilled (partial refilling of the excavated area).

As for the five-story mixed-use structure, that is just getting underway with structural framing. The first floor, which will have offices and meeting space, has its steel skeleton and some of its exterior stud walls have been attached. The second floor is just getting underway, and the masonry blocks for the elevator core have been assembled. It appears the existing TCAction building will be getting a new roof as part of the construction work – note that they are not able to work here while construction is ongoing, and have temporarily relocated to 609 West Clinton Street. The 20,712 SF building, with its offices and 23 efficiency units for homeless and/or vulnerable young adults, will be completed early next year.

The background information and planning for the project can be found in the March introductory post and photo set here. Prolific regional contractor Welliver is the construction manager for the $8.25 million project.





South Meadow Square Construction Update, 6/2018

18 06 2018

The new endcap spaces on the former KMart (now Hobby Lobby) Plaza at 742-744 South Meadow Street. The first set of photos are the northern endcap with 7,315 SF of retail space, next to PetSmart. The southern endcap is a 14,744 SF space being built where K-Mart’s garden center used to be, which I think explains the huge chunks of concrete slab piled out in front.

With no tenants formally announced, these spaces will not be completely finished on the inside – all utilities will be in as well as structural supports and insulation, but the space will be fitted out to the needs of the tenants, so things like flooring, fixtures and interior finishes will wait until someone has signed a lease with Benderson Development. I did not see anything on file for a fit-out in the city of Ithaca’s building permits paperwork (however, I did see last week that Elmira Savings Bank landed an unnamed tenant for its second floor office space at 602 West State Street).

Oftentimes you’ll see retail real estate managers try to find tenants that complement each other, say a salon and a cafe, or a sporting goods store with a women’s clothing store (the somewhat sexist argument there is that the ladies go to one while their male partners go to the other). Increasingly, entertainment and recreation options are becoming tenants – take for instance the announcement that a live theatre company will be taking 12,000 SF of space in the Shops at Ithaca Mall. That can help existing tenants by drawing in unique customer traffic that may choose to browse, shop and dine at other mall venues.

Back to the site at hand, the decorative facade appears to be initially shaped with plywood over steel stud walls, with a layer of fireproof gypsum laid over the top of that (except toe cornices, which appear to have no plywood layer, only gypsum). The bases are concrete masonry walls. The textured stone veneers and fiber cement panels will come later.





Village Solars Construction Update, 6/2018

16 06 2018

It looks like there’s a lull in the construction at the moment. Both 102 Village Place and 116 Village Circle appear to be complete, though a quick guess would be that 102 Village Place is already occupied, and 116 Village Circle will be ready for its first tenants at the end of the month. The two have a total of 42 units, 24 in the former and 18 in the latter. TCAT is in discussions to add or modify a bus route to service the growing apartment complex, which has already added a couple hundred residents to the area since 2013, with plans for hundreds more over the next several years.

According to the phasing plan, the next phase is to replace 2 Village Circle and 22 Village Circle with a pair of 18-unit buildings. Those would be twelve studios and six two-bedrooms each, replacing two ten one-bedroom unit buildings (net gain of 28 residents, for those keeping in track). Demolition has not yet started on the existing structure, but the most likely plan is to start a little later in the early summer, and have the new pair of buildings ready for a spring 2019 occupancy.





Maplewood Redevelopment Construction Update, 6/2018

15 06 2018

There was an interesting story going around that Maplewood was in serious trouble due to water pressure issues, to the point where its ability to legally house its residents was at risk (no water pressure would have made for a hazardous fire risk). That would have been a huge story had it panned out, but a little bit of checking with the town of Ithaca codes department and the development team turned up no dire situations unfolding, all is going as planned (a welcome change given all the weather and contractor issues that have plagued the project’s tight work schedule so far). There was some worry about water pressure back when the project was first proposed, which is why a new 600,000 gallon water tower is going up on Hungerford Hill Road.

It’s a little sad to see the French Lavender florist and gift shop is closing down after eleven years. It’s not clear if it’s related to construction, or if the timing was coincidental. Coal Yard Cafe was doing a brisk mid-day business at the opposite end of the Maplewood site. With 872 new residents expected by the end of the summer, the site will have appeal to retailers and service providers.

For project background and planning, click here.

For a site plan breakdown, click here.

For a construction timeline, click here.

Webcam link 1 here (updated ~15 minutes).

Webcam link 2 here (updated ~15 minutes).





Cornell Veterinary School Expansion Construction Update, 6/2018

14 06 2018

Looks like we can move this project into the “completed” column. The 12,000 SF, $7 million building is open and occupied – in fact, there appeared to be a couple of folks transferring crates of paperwork into the building as these photos were being taken.

HOLT Architects designed a modest LEED Silver structure with clean, modern lines, and G. M. Crisalli and Associates Inc. did a bring job bringing that design into reality. At this point, the four years of construction at the Cornell University Veterinary School appears to finally be complete. The school will gradually build up to its expanded size (102 to 120 students per class), expand its lab and research capabilities, and through the Community Practice Service building, serve the community in which it resides. The state released its press announcement calling the Vet School Expansion complete last week – and noted that the final price tag for all the phases was $91.5 million.

Before:

Render:

After:





118 College Avenue Construction Update, 4/2018

13 05 2018

Finally, clearing out the last of that late April photo stash. Not many here, but a new, small Collegetown project is underway at 118 College Avenue.

This is a Visum project, and probably their lowest profile plan. In fact, this one never even went through the sketch plan part of the city review process, the project team went straight to asking for the city planning to declare itself lead agency for environmental review in March 2017. Approval was a short time later as Ithaca goes, in May 2017. Building permits were issued this past winter.

It wasn’t a rash decision by any means – the project is largely similar to a previously-approved plan a few houses up at 126 College Avenue, and there is very little difference between the two properties in terms of context. They are both CR-4 zones allowing 4 floors and 45′ heights. The original 118 College Avenue was a two-story, early 20th century rental house with six bedrooms and marginal historic value, though I imagine the house was rather pretty before some unfortunate additions threw off its symmetry. The property was purchased by Red Door Rentals (Greg Mezey and Ryan Mitchell) in April 2014, transferred to another Mezey/Mitchell company, “MPB Capital LLC” in October 2017, and then to an LLC associated with Visum on the same day as the MPB Capital transfer. It seems plausible Ryan and Mitchell are project investors, with Visum as developer.

Plans call for a new 4-story, 45′ building on the sloped lot. With that slope, the basement is exposed on the west face, so it has the appearance of five floors from the rear and sides. A back of the envelope calculation says this building is about 9,000 SF. The roof hosts a 6′ architecturally-integrated mechanical screen; hides the mechanicals, but gives the apartment building an Italianate aesthetic. The building uses electric heat pumps and is designed to be net-zero energy compatible. The hard construction cost rings in $1.415 million, according to the SPR filing – it would be assessed at a substantially higher amount. Unabated taxes her, so while people may dislike Collegetown, projects like this help fill the city coffers.

There will be 5 apartment units with 28 bedrooms – 4 six-bedroom units, 1 four-bedroom unit on the basement level. The project comes with five new trees, lush landscaping for its small lot, an outdoor bike rack, screened trash area, and bike storage and mechanical rooms in the basement. Tenants with valid licenses will be given membership in Ithaca Carshare, to try and dissuade them from bringing personal vehicles. Not a surprise here, but college students are the intended market.

Only a couple minor changes occurred from start to finish – the window on the northeast face was replaced with a patterned trimboard to keep visual interest. The rooflines ware adjusted in the render below, but not the building plan, so we’ll see which is correct.

For materials, the basement-level will use stucco mixed with Sherwin-Williams “Sawdust” paint, the first level is a combination of Belden face brick (Belcrest) and S-W “Truepenny” fiber cement clapboards, more fiber cement clapboard on the mid-section in S-W “Overjoy“, trimboards, balcony trim and window casing colored S-W “Svelte Sage”, black window frames, stucco (in S-W “Favorite Tan”) with more fiber cement trim and frieze boards on the top level, and the pyramidal roof caps will be standing seam metal, Pac-Clad “Aged Copper”. Mix of materials, mix of colors – should stand out nicely.

Expect buildout to look similar to 210 Linden and The Lux – Amvic insulated concrete forms at the basement level, double-stud Huber ZIP panel plywood sheathing, scratch coats on the portion to be covered in stucco, perhaps wood furring to raise the exterior clapboard and prevent dampness, and probably Anderson windows. The project is expected to be complete by August – units are going for $950/bedroom, plus utilities. Pricey, but at least they allow large dogs.

Along with Visum and Red Door Rentals for this ride through the development process is STREAM Collaborative as the building and landscape architect. Since they’re GC at 210 Linden Avenue, Romig General Contractors may be the manager of the construction crew here as well.

 

 





Masonic Temple Renovation Update, 4/2018

13 05 2018

The Masonic Temple renovation is low-key but worth an explainer. Here we go:

The 17,466 SF Masonic Temple at 115-117 North Cayuga Street is a bit of an unusual building. It was one of the last designs by prolific local architects Arthur Gibb and Ornan Waltz, and completed in 1926. The style is Egyptian Revival, which was also used for the Sphinx Head Tomb at 900 Stewart Avenue, and to a lesser extent in the Carey Building, which was built around the same time. Egyptian Revival architecture uses what are or are perceived to be Egyptian motifs (stark facades, strong symmetrical elements, Egyptian-themed ornamentation), and experienced a resurgence in the 1920s following the opening of King Tut’s tomb – the early 20th century designs are sometimes grouped in as a subcategory of Art Deco.

Keep in mind that Freemasonry is a loose affiliation of fraternal groups, with some degree of secrecy (that they like to play up, for better or worse). Although diminished in this age, they played a role in community social life much as Greek Life does on college campuses. The Ithaca Freemasons wanted something exotic with just a hint of foreboding, so the architects went with minimal ornamentation, strong symmetry, simple, slit-like windows, and a bare, impassive facade, here a thin limestone veneer over a steel frame (a modern idea for the time). To quote William D. Moore’s Masonic Temples: Freemasonry, Ritual Architecture, and Masculine Archetypes, “a critic claimed that Ithaca’s Masonic Temple could help visitors to imagine themselves ‘transported to the civilizations of the Pharaohs…There is no mistaking this structure for an abode of commerce’.”

By the 1990s, the Masonic Temple had fallen into disuse, and local developer and major landlord Jason Fane picked it up in 1993. Fane had made his intent clear that he preferred to demolish the building and build new on the site, a stone’s throw from the hear of Downtown. In response and concern to that idea, the building was landmarked in 1994. You could probably see some parallels to the Nines situation here, only the Nines owners aren’t already multi-millionaires and don’t have a negative public image.

It’s a difficult building to reuse. Not only does one contend with the extra hurdles and costs of working with a landmarked historic structure, but the rooms are cavernous and the building has been described as functionally obsolete – its outdated mechanical systems and lack of handicap accessibility have made it a difficult sell to prospective commercial tenants. The last tenant was the Odyssey nightclub, which moved out over a decade ago. Older folks tend to remember a restaurant prior to that, Europa.

Fane himself was never a big fan of what was considered his “white elephant” property; out of concerns he was letting it decay to the point of an emergency demolition, the CIITAP tax abatement rules were modified in 2014 to say that applicants had to be code compliant on all their other existing properties, and was targeted at Fane, who was seeking an abatement at the time for an apartment proposal at 130 East Clinton Street (it was denied and the project was never built).

The best way to describe the Masonic Temple problem is that it’s not the location, and it’s not out of a lack of interest – it was simply the cost of making it code-compliant and more accessible for tenants. Early plans considered putting The History Center here, while an earlier plan from 2012 considered buying the property from Fane and making it into a community center. The 2012 plan never made much headway – Fane was not keen on selling, and he still harbored hopes of demolishing it. The History Center plan was also seen as more expensive than a specialized space for The History Center.

The city has long hoped that they and Fane would see eye-to-eye, and finally it appears that dream is coming true. In July 2015, the city Common Council voted to support an application from Fane to the New York State Main Street Program, a state-sponsored grant program that encourages revitalization efforts at historic sites in downtown urban centers. In December of that year, the state awarded Fane a $500,000 grant towards the rehabilitation of the building (which cost a little over $1 million total). The initial plans were to get the ball rolling on construction in summer 2016, but it does appear that much-lauded renovation plan is finally moving forward now.

The renovation, designed by architectural preservation specialists Johnson-Schmidt & Associates of Corning, calls for the creation of three commercial spaces, the installation of a ramp at the rear of the auditorium, and a new elevator on the southwest side of the building. With the interior kitchen still intact, it is likely that at least one of the commercial spaces would be geared towards a restaurant tenant.

A new roof membrane will be applied, the exterior limestone and stucco will be cleaned and repaired, the street windows repaired and repainted, and the auditorium windows, which had been boarded up by previous tenants, will be replaced with similar-looking new windows. The front entrance’s stone steps would be redone, and the front doors and lamp posts would be restored. The Ithaca Landamrks Preservation Commission signed off on the work in January 2017. The plans can be seen in the application here.

At the moment, it looks like asbestos abatement is underway, and the ground-level light wells are having their deteriorated concrete removed and replaced. Kascon Environmental Services is performing the asbestos removal, and McPherson Builders Inc. of Ithaca is the contractor-of-record. I asked Fane via email if the plans had changed at all since January 2017, or if there were any tenants on board, but as is often the case with him and his lawyer/representative Nate Lyman, there is no response.

3/30/2018

4/28/2018





City Centre Construction Update, 4/2018

12 05 2018

Mostly just clearing out my stash at this point; as the webcam shows, exterior framing is up to the third floor.

A number of changes have been made to the City Centre project, inside and out. Whitham Planning and Design shepherded the alterations through the planning board, which was generally okay with them. Among the revisions:

-Landscaping Changes. Among them, street tree species and layout, and tree grates are being replaced with FlexiPave porous paved covers. The number of shrubs was decreased, perennial flowers increased. Bike racks were relocated, street lights, curbing and curb ramps were adjusted, concrete planters were added by the parking drop-off area, a pergola with string lights was added, bollards were added, the sidewalk width along East Green Street was reduced from 6′ to 5′, and pavers were changed to a slightly darker shade of grey.

-On the first floor, the lobby layout was reconfigured, and some exterior doors were relocated for ease of access. The number of retail spaces was reduced from four to three, but the total square footage for the retail is about the same (11,000 SF). A storm water vault and fire pump room were added in the underground garage, and the parking spaces were reconfigured slightly to accommodate (still about 71 spaces).

-The unit mix has changed from 61 studios, 78 one-bedrooms, and 53 two-bedrooms, to 33 studios, 120 one-bedrooms, and 39 two-bedrooms. Still 192 units total, but with fewer studios and two-bedrooms and more one-bedrooms, basically. This might have to do with what’s easiest to rent to the target market (young professionals, a few downsizers, deep-pocketed students). Perhaps studios aren’t seen as having enough space for the upmarket market segment.

-The exterior facing materials have been changed from Nichiha aluminum panels to Overly Dimension XP Metal Systems, and Alucoil Larson ACM aluminum panels. The color palette is generally the same, perhaps slightly greyer with the revised paneling. Air intake vents were added to the building facade. Fenestration (window size/arrangement) was also changed up.

The floor buildout is a rather interesting process, because they’re practically building from the inside-out as each floor is added. The interior steel stud walls and structural steel supports go up first, then roof decking overhead, and then what appear to be prefabricated modular exterior wall panels with Marvin Windows already fitted. The dark panel is Dow Thermax Xarmor, which apart from sounding like a Star Wars extra, is a heavy-duty fire-rated fiberglass insulation board covered with a dark exterior facer that serves as a water barrier. These panels can be set into place very quickly, saving time and labor costs. The ground-level is more typical fireproof gypsum sheathing. The steel rails on the upper floors are likely for the aluminum exterior panels, so they may clipped into place.





Harold’s Square Construction Update, 4/2018

10 05 2018

Ithaca weather is not accommodating. Originally, the pour for the concrete slab was supposed to take place on April 3rd. It’s tricky, because this is a large footprint and the building is very heavy, necessitating a thick slab – 30 inches thick. That has to all be poured at once, without any potential interruptions like rain or snow, which can weaken the concrete as it cures (upsets the mix and water balance). That was rescheduled the first time due to winter weather, and was expected to take place on the 11th, which was rained out. 4/16 was also cancelled due to winter weather. Finally the concrete was able to be poured on the 23rd.

In the photos below, you can see some wood forms are still in place for smaller sections (entryway, lower right of site). The vertical concrete column bases are being poured (note the squares of vertical rebar in the sections yet to be encased), with steel plates atop the finished column to tie into the steel beams. The hole in the lower right (southeast) corner is for one of the elevator cores. Taylor the Builders will have this heading skyward in short order.





Tompkins Financial Corporation HQ Construction Update, 4/2018

7 05 2018

It appears that TFC’s new headquarters is just about done – from the outside, paving, landscaping and signage is about all that’s left. The signage plan, a fairly conservative “halo” style courtesy of Ithaca Sign Works, can be seen on the city’s website here.

As these photos were taken, a moving crew was busy carting office materials from TFC’s office space across the street. Corporation staff should be moved into the new building by the end of May. Tompkins Trust Company Division CEO Greg Hartz has said that 119 and 121 East Seneca would be held onto and rented out, with the bank retaking space in those buildings as it needs. Meanwhile, the historic 2 and 3-story buildings on Bank Alley just south of the M&T Building have been sold to the county for use as the new Tompkins Center for History and Culture, which will open in 2019.

On the whole, a project like this is a big net positive for the city. As opposed to the tried-and-true suburban office park route, TFC’s commitment to the city, and the work of city personnel as well as TCAD to keep them in downtown results in a major addition to the city’s tax base ($3,782,311 in new tax revenue over 10 years), the retaining of hundreds of workers downtown who by proximity would be more likely to shop, dine or live nearby, and the prospect of dozens of well-paying jobs being created at the new headquarters over the next several years. It looks like that the company added 22 employees system-wide in 2017, for a total of 1,041. A little over 300 of those will work in the new headquarters, the vast majority moving from the other offices in downtown Ithaca, with another 18 or so from the Lansing office.

Design-wise, it has a solid if conservative appearance, befitting of a stable, button-up corporation. HOLT Architects added a modern touch with the windows, and created visual interest by contrasting the dark grey brick with the tan brick, beige face stone and grey aluminum panels. The building height and dimension occupy an intermediate size between the DeWitt Mall and Seneca Place, which allows it to be imposing without being overbearing.

Other firms involved in the bringing this project from vision to reality include the engineers and surveyors at Elwyn & Palmer, Trowbridge Wolf Michaels Landscape Architects, and Rochester’s LeChase Construction. Credit also goes to JPW Erectors for the steel framework, the Carpenters’ Union Local 277 and the IBEW (International Brotherhood of Electrical Workers) Local 241.