Up on West Hill in the town of Ithaca, work progresses on the “Common House” apartment building for EcoVillage’s third neighborhood, called TREE (Third Residential Ecovillage Experience, following its first two, FROG and SONG). Since the end of December, exterior finishes have made their way onto most of the 4-story building; offhand it looks like some type of composite siding along with wood paneling, which adds character and brightness to the building’s otherwise muted appearance. Some sections have yet to be exterior finishes applied, and the housewrap is still visible. Balconies are being built on the northwest corner, but have yet to begin installation on the southeast corner.

The Common House will hold about 15 units, ranging from studios to 3-bedrooms. My previous back of the envelope calculation suggests 25-30 bedrooms in the building. When the Common House is finished later this spring, the TREE neighborhood, with 25 owner-occupied homes as well as the 15 apartments, will be complete, two and a half years after the first homes started construction.Planning for the TREE neighborhood began in 2007, but financial setbacks and the late 2000s recession resulted in an extended incubation and planning process, including a revision that increased the number of housing units from 30 to 40.

Construction is being handled by a local firm, AquaZephyr, which received an award from the U.S. Dept. of Energy for a “zero energy ready” home constructed as part of TREE. The designs of the Common House and houses are the work of California architect Jerry Weisburd.

20150405_143828 20150405_143852 20150405_144000 20150405_144052 20150405_144116





EcoVillage Construction Update, 12/2014

29 12 2014

Heading over to West Hill, construction continues slowly but steadily on EcoVillage’s 4-story Common House/apartment building as part of its third neighborhood, TREE (Third Residential Ecovillage Experience, following its first two, FROG and SONG).  I can’t seem to find any specific values for the number of bedrooms in the apartment building, but there are 15 units ranging from studios to 3-bedrooms. However, using a little math and deduction, a rough estimate can be established. EcoVillage claims 160 residents in its first two neighborhoods, which have 30 units each (total 60), and they expect 240 residents when the 40-unit TREE neighborhood is complete. That gives 80 residents in 40 units, of which 25 of those units are houses. Houses tend to have more occupants than apartments (2.1/house vs. 1.7/apartment from the 2010 county census), so I think 25-30 residents is a fair estimate for the apartment building.

Interior work is underway and all the windows and doors are fitted into place. Exterior finishes and balconies have yet to be installed. The houses are all complete and occupied. Construction is being handled by a local firm, AquaZephyr, which received an award from the U.S. Dept. of Energy for a “zero energy ready” home constructed as part of TREE. The apartment building is scheduled to be finished this spring. Setbacks stemming from building code requirements pushed it away from its original fall 2014 completion date.

20141227_150247 20141227_150051 20141227_150040 20141227_150002 20141227_145916 20141227_145843

treenh1





News Tidbits 8/30/14: There Never Seems To Be Enough Housing

30 08 2014

1. In a glance at the economy, some good news: over in Lansing, a new research building is under construction, and expected to add jobs. the new “Northeast Dairy and Food Testing Center” is a 50-50 collaboration between local firm Dairy one Cooperative Inc., and Chestnut Labs of Springfield, Missouri. The new 17,000 sq ft building at 720 Warren Road is a $3.5 million investment and will add 11 jobs at the outset, 3 through Dairy One and 8 through Chestnut Labs. 4 more jobs would be added over the following two years if all goes to plan.

According to the TCIDA report, Chestnut opted for Ithaca as its first satellite office because of a desire to expand into the Northeast and its proximity to Cornell. Although construction was supposed to begin last fall, it looks like we can expect construction to be completed this spring. I have yet to see a rendering, but the design is supposed to be by Syracuse-based Dalpos Architects.

2. Revised renders for 327 Eddy. The 28-unit, 64-bedroom Collegetown project looks nearly the same, except for one crucial detail – the east courtyard and stairwell have been transposed (mirrored), with the east courtyard on the south face and the stairwell on the north face. A few more windows were placed in the west courtyard as well. This is a smart suggestion, whoever’s it was; the 100 Block of Dryden obscures the blank faces of the side wall and stairwell, making it less prominent. The side with more windows faces down the hill, and given the relatively historic building next door, the views are likely to be more protected, and it’s more aesthetically pleasing from most vantage points.

327_eddy_rev2_1 327_eddy_rev2_2 327_eddy_rev2_3

3. As reported by the IJ last Wednesday, the much-anticipated Harold’s Square project will be getting another revision. The building was originally supposed to be one floor of retail, three floors of office space, and six floors of apartments, with a penthouse level consisting of conference, mechanical and exercise rooms. Now, the top two floors of office space will be apartments instead. Currently, the building has 46 apartments approved, and any changes will likely need to be approved by the planning board. The article also notes that high construction costs in the growing economy are forcing businesses to rethink their development strategies, although the exact same thing happened during the recession due to the tight bank loan market. There’s always a reason.

I really can’t say this change-up in use really surprises me. Ithaca’s office market is not that great. The biggest employers here are colleges (who house offices on or very near campus), research/labs (who need specialized spaces), and tourism (hotels). It’s extremely tough to build office space in the Ithaca market because there’s so little demand for it. Seneca Place downtown was able to be built in 2004-05 partially because they secured Cornell as a tenant. But I’ve heard through the rumor mill that Cornell doesn’t fully use their space post-recession, and the university keeps renting it out as flex space and as a gesture to the community. On the other hand, apartments go like hotcakes, since the residential supply is much less than demand, and the success of recent projects indicates apartments are a safe investment in downtown.

Here’s what I expect – the building will be a little shorter, since residential floors have lower floor-to-ceiling ratios than office spaces. The exterior will be revised, mostly the low-rise section facing the Commons. The massing may change up, but given that there were 46 apartments on six floors initially, at a minimum I think another 20 apartments to be proposed.

hsqrev2

4. The Stone Quarry Apartment project by INHS has been approved. It wasn’t a pretty process, but it’s been greenlighted for construction, which is expected to begin this fall with an intended completion in October 2015.

inhs_stone_quarry_rev_3 inhs_stone_quarry_rev_4

5. On the topic of affordable housing, another protested project is coming up for review, the 58-unit Biggs parcel project near Cayuga Medical Center. The project needs an approved SEQR from the town of Ithaca before it can move forward; the sketch plan is to be discussed at the September 2nd meeting, there will be no vote at that time. The working name of the project has gone from Cayuga Ridge to Cayuga Trails; I’m just going to keep calling it the Biggs parcel. There’s only a tenuous little overlap between the opposed parties here and those against Stone Quarry, but if the Ithaca West list-serve is any indication, the argument against the project is one part logic, one part bluster. There have already been allegations thrown around from both sides with this project, which is co-sponsored by the rural equivalent of INHS, Better Housing of Tompkins County, in a partnership with project developer NRP Group of Cleveland. While this Jerry Springer-type showdown continues to unfold, here are some updated renders of the project, courtesy of RDL Architects of suburban Cleveland:

cayugatrails_1

cayugatrails_2 cayugatrails_3

Nothing to write home about, simple and colorful. But there’s a good chance these never leave the drawing board. If it does somehow get approved, construction will start in Spring 2015 and last 12-14 months.

6. In other West Hill developments, EcoVillage is building their 15-unit apartment building/common house in their third neighborhood, TREE. Article from the Ithaca Journal here, and photo gallery here. I only reach EcoVillage once in a blue moon because it’s so far out of the way from other developments; my last photos are from spring 2013. At that time, the first set of houses were going up for the 40-unit neighborhood. According to the EcoVillage website, the first TREE residents, with homes designed by Jerry Weisburd, moved in last December. When all is complete by next spring, EcoVillage will actually be a fairly sizable village, with virtually 100% occupancy and a population around 240. Unlike many West Hill developments, EcoVillage has had comparatively weak opposition from West Hill residents. Lest they change their mind, EcoVillage adds a neighborhood about once a decade, so they have probably have nothing to worry about until the 2020’s.

treenh1





Ecovillage Has More Competition Coming

24 05 2013

newearth_1

As noted in the Ithaca Times, the eco-conscious folks who developed the Aurora Street Pocket Neighbrohood have a new proposal in the works. The location for this one, however, isn’t as urban – the site is located off of Five Mile Drive, just west of Elmira Road and the southwest area’s suburban big-box land (fun fact – the road starts at an intersection with Elmira Road five miles from the shores of Cayuga Lake, hence the name).  This general area has seen a sizable number of single-family homes built in the past decade, though nothing multi-unit like the proposal.

Speaking of which, the basic stats – ~36 units, “craftsman” style homes 1-2 floors, single or 3-unit properties depending on preference, and a common house/community center. Enough of seems to be up in the air style-wise that New Earth Living is asking interested parties to fill out surveys or email them, so they can flesh out their proposal. Style-wise, we already have a good idea what this might look like by looking at the Aurora Street Pocket Neighborhood, which consists of one renovated home and 4 units in three newly-built properties tucked in from the corner Aurora and Marshall. Green construction, solar panels, LED lighting, food grown on property, but no true farm on the property, and units are clustered but still separate – in some ways, this project seems like a toned-down version of Ecovillage.

Ithaca has a lot of folks that lean far left, and a lot of development going on as of late. This seems like a pretty natural outcome of those two forces. Hopefully, this will be a project the community can get excited about as it moves forward.





The EcoVillage

9 05 2013

4-8-2013 350

Although I take a lot of jabs at “hippies”, the reason I never made it to Ecovillage before now had less to do with any personal stance and more to do with the fact it was just out of my way. Rachel Carson Way lies about a mile and a half westward of Inlet Island, nestled in the hills opposite from Cornell. This means that when I past through, it’s farthest out of my way, so time often being a priority, it always sat on the bucket list. Finally, I made the conscious effort to take a trip up on my last photo tour.

4-8-2013 353

Ecovillage runs on the concept of co-housing, which in many ways runs close to most people’s idea of a commune (and mentally, I still find myself referring to it as a commune). There are optional shared dinners, a community-based work system, and of course, being in tune with the natural environment. Hence, solar arrays, housing designed to minimize energy use, foods grown on the property,  and so forth. Ecovillage isn’t unique, not even in Tompkins County (White Hawk in Danby is a smaller but similar concept). But it is probably one of the best known developments of its kind.

4-8-2013 354

Ecovillage began planning in 1992-1993, when stakeholders purchased a former farm with the intent of launching an eco-friendly community.  The first neighborhood, FROG (First Resident Group), began construction in 1995 and was completed two years later. The second community, SONG (Second Neighborhood Group), received site plan approval in 2001, and was built in three phases over five years. Each of these neighborhoods has 30 units with a community center. The community also has a few other bells and whistles, like a passive bus shelter, a root cellar, carports and a berry farm. The pre-Ecovillage farmhouse and barn are now a separate property holding an antique shop and the City Lights B&B.

4-8-2013 352

Ecovillage is well underway with its third neighborhood, TREE. At 40 units, TREE is slightly larger than the first two neighborhoods. Construction is definitely underway, and the majority of the community should be complete before the end of the year. Also worth a quick note, a 900 sq ft “Gourd Workshop” was under construction when I passed through. More additions, like an education center and a roadside farm stand, are in the works.

4-8-2013 351

If you don’t want to be a creeper like me, Ecovillage opens itself up for a free public tour at 3 PM on the first Saturday of each month. That way, you can avoid being like me, trying to take photos when kids keep wandering in front of them, and having that awkward realization that you look like a child predator.