Collegetown Terrace Construction Update, 9/2016

29 09 2016

Novarr-Mackesey‘s curvilinear Collegetown Terrace is one of those projects that’s so big, we can see multiple steps of the construction process at once. In general, the further west one goes, the further along the building is. On the east end, the stairwell and elevator shaft stand high above the framing underway. Steel exterior stud walls are being sheathed with plywood with rough openings for windows. Some of the interior steel stud wall framing can be seen as well. In the next section further west, the framing and sheathing are further along, but still a few floors short of the stairwell/shaft. Some structural steel, which separates groups of units, is present as well. The westernmost third is fully framed and mostly sheathed, enough that the maroon-colored waterproof barrier has been applied to the plywood in most places, and windows have been fitted into many of the rough openings.

Continuing west, we come across the “fish scales” – yes, for better or worse, they’re going on Building 7, likely topped by the aluminum metal walls previously seen in Phase II. The side facing thr gorge has the same linear earth-tone facade that is present on Building 5. The westernmost end of the building is not a little further behind, possibly for ease of materials transport, or because of different architectural details that they have yet to bring to the site (based on the rough openings and the sheathed steel, both are plausible). It looks like the southwest corner will host a glass curtain wall section setback from the primary walls, based off of the steel framing.  An early render suggests the common spaces will be clustered along the west end of Building 7. Note that parking will be on the lowermost two floors, with dorm style units on the third floor, and regular apartment units on the upper three floors. The wood forms next to the western stairwell/shaft look to be for a new concrete staircase that will run alongside the west wall.

Montour Falls-based Welliver is in charge of the build-out, and CTT7 should be complete and ready for occupancy by August 2017. Princeton’s ikon.5 Architects are the building designers, and Baltimore’s Floura Teeter the landscape architect. Big league commercial real estate financial lender Walter & Dunlop Inc. provided the $70 million bridge loan.

A quick google search turns up a surprising number of AirBnB hits.

20160918_141746 20160918_141751 20160918_141758 20160918_142023 20160918_142027 20160918_142040 20160918_142046 20160918_142129 20160918_142148 20160918_142409 20160918_142442 20160918_142518 20160918_142738 20160918_142928 20160918_142944 20160918_142952





Cornell Ag Quad Rehabilitation Construction Update, 9/2016

28 09 2016

Kinda outside the normal coverage, but an important project nevertheless. Cornell is currently undertaking a major rehabilitation of the CALS Quadrangle, better known as the “Ag Quad”. The $9.6 million “Ag Quad Utility Infrastructure Upgrades and Landscape Revitalization Project” (originally $7.8 million) began during the summer, and is scheduled for a completion before the 2017-18 academic year. Most of the construction is planned during the summer months of 2016 and 2017, when the ground is easier to work with and impact on campus activities is at a minimum.

According to university landscape architect David Cutter, the work has planned for at least a decade, but was a lower priority vs. other projects such as the Mann Library and Warren Hall renovations, which used the quad as a staging area. With the bulk of building renovations complete (a new academic building on the south side of the quad, but it’s just a hazy concept at this time), and with infrastructure approaching 100 years old, the university decided now was as good a time as any to get the rehab underway. Plans were approved by the Ithaca city Planning Board in February.

The first phase is what’s underway now. That involves the replacement of underground utilities infrastructure. In that catch-all are water pipes, sewer pipes, steam pipes, and a new ductbank (electrical conduit grouping) for telecommunications from the CIT Building. Several walkways have been excavated to make way for new or improved underground utilities corridors. The second phase is refreshed landscaping. Along with new permeable pavement walkways and entrance plazas in front of Roberts Hall and Mann Library come 54 new tree plantings, a rain garden, and upgraded lighting (from two poles to twenty). The plazas will come with movable tables and chairs, traditional benches and concrete slab benches (rough-hewn sides, cut/thermally-finished tops). For additional safety, the rehabbed quad will host collapsible bollards, an increased number of blue light security phones, and a new emergency vehicle path. Primary walkways will be 12′ wide, and secondary walkways 8′ wide. Some of the new garden spaces and landscaping will be done by students in various CALS programs.

The project has been the subject of relatively little controversy compared to most. Some consternation was expressed that four Cornellian cherry trees next to the west side of the Plant Science Building would be cut down for “infrastructure changes”, but other than that, there wasn’t much else in the way of concern or opposition. Eleven other trees are also or are being removed, so the net gain is 39.

The $9.6 million is coming mostly out of the university’s budget (CALS and Utilities), with some private funds. MKW & Associates LLC of New Jersey is the lead landscape architect, Over & Under Piping Contractors Inc. of Auburn is the GC, and Albany-based CHA Consulting Inc. is providing civil engineering expertise.

In the photos below, the new sanitary and steam pipes are being fed through a protective concrete threader, and new cobbled pavers being paid out in front of Mann. The rebar sticking out of the curved concrete in front of Mann is part of a bi-level concrete stairwall that will be capped with cut stone – my guess is the rebar is there to strengthen the concrete, and will be trimmed down once the concrete is fully cured and the project team is ready to move on to the next step. The metal tool on the left side of the last photo is a portable trench shield used for pipe installation.

20160918_131244 20160918_131314 20160918_131411 20160918_131430 20160918_131806 20160918_131810 20160918_133025 20160918_133246 20160918_133322 20160918_133644 20160918_133712 20160918_133753 20160918_133926

ag_quad_2

Pg-3-Rendering





Brookdale Ithaca Crossings Construction Update, 9/2016

25 09 2016

There’s only a few months left in Brookdale Ithaca’s construction timeline, and the new Crossings facility is starting to look a lot like the anticipated final product. In the past few months, the rough openings have been mostly fitted out with windows, and the exterior walls have been sheathed in housewrap and are in the process of being sided. The installation of A/C units is also underway. Most of the roof appears to be done, although in some sections the tar paper has yet to be shingled. Exterior trim panels and details like the decorative shutters will be attached after the roof and primary walls are finished. The excavated hill to the southwest (right side in the images) will be held back with a 10′ retaining wall, yet to be assembled.

Note that these photos are the living spaces and the bulk of the new 23,200 SF, 32-bed facility, but the front entrance is actually a diagonal (northeastward) extension between the two existing facilities and out towards the front circle. You can see a little bit of  the front entrance gable in the second-to-last photo. More details on the project can be found on the blog here and on the Voice here.

20160918_155022 20160918_155049 20160918_155112 20160918_155147 20160918_155202 20160918_155211

clarebridgecrossings_2 clarebridgecrossings_1





Cayuga Meadows Construction Update, 9/2016

22 09 2016

LeChase Construction is making good progress on Conifer LLC’s 68-unit Cayuga Meadows apartment project off of West Hill Drive in the town of Ithaca. The wood frame is topped out on the north side of the L-shaped building, where they’re starting to nail plywood (the decking) to the roof trusses – later they’ll be covered over with tar paper or a similar material, followed by the shingles. It also looks like they’ve started attaching a little Tyvek housewrap to the second floor of the structure. As you go southward, framing is only up to the second floor, with rough openings in the plywood for doors and windows. At the rear of the property, a trench has been dug for a new water main, which is being routed below what will be the building’s parking lot.

The apartment units, which are intended for seniors with limited incomes, are expect to be ready for occupancy next fall. More information about the project can be found here.

20160918_154000 20160918_154027 20160918_154050 20160918_154218 20160918_154325 20160918_154352 20160918_154401 20160918_154405

Cayuga-Meadows-2 Cayuga-Meadows-Shot





Maguire Fiat/Chrysler Addition Construction Update, 9/2016

20 09 2016

The small addition the Maguire Family of Dealerships is putting on their Fiat/Chrysler location looks to be nearly complete from the outside. The aluminum panels are up, the new east wing is fully glazed and new signage has been posted, both on the building and the stand alone podium signage near Route 13. The parking lot and display have been reconfigured, and the entry drive has been modified. It looks like the only thing left is landscaping and paving by the front of the building. Welliver will be wrapped up within a few weeks, and Maguire’s 2-story, 1,836 SF addition will be done. More info on the project can be found here.

20160918_150608 20160918_150628  20160918_150654

maguire_fiat_v2_2 maguire_fiat_v2_1





DiBella’s Construction Update, 9/2016

19 09 2016

From the outside, the Dibella’s pad building is just about done. All that’s left is signage and accessory installations such as bike racks. The open paved space south of the building will be a patio for outdoor dining, which would be a nice spot on a day like this.

The inside is still being finished out – looks like the some interior walls are still waiting for their drywall to be hung, and in other spots, the drywall has been primed but trim and paint have yet to be applied. Allowing a few weeks for trimming and painting and equipment installation, it looks like the sub shop could open by Halloween.

Marx Realty might have switched contractors when work shifted from the building itself to the outfitting of the interior. A&E Construction handled the construction of the building (the “shell space”), but Marco Contractors Inc. of suburban Pittsburgh is handling the interior fit-out. More infp about the DiBella’s project can be found here.

Perhaps because of its high visibility, by a wide margin more emails come in asking about what’s being built here than any other project in the county.

20160918_151026

20160918_150926
20160918_151101
20160918_151132 20160918_151158 20160918_151202 20160918_151205 20160918_151220

20160918_151011

DiBellas-Ithaca-NY-rendering-large





Tompkins Financial Corporation HQ Construction Update, 8/2016

31 08 2016

Tompkins Financial Corporation’s decision to build in downtown Ithaca is seen as something of a major victory by civic groups and local leaders. For one, it’s a major economic investment, and for two, it’s taken by many as a sign that downtown Ithaca has “turned the corner”.

Tompkins Financial Corporation is the parent company of Tompkins Trust Bank, as well as some other financial units. The company can trace its roots back to Tompkins County Bank’s formation in 1836. Along with Tompkins, TFC also manages several smaller banks throughout New York and Pennsylvania, totaling 67 branches and about 1,100 employees. About 280 of those work in downtown Ithaca at the current headquarters.

Currently, the office space is decentralized, scattered throughout multiple downtown sites and one suburban site, some of which are owned and others of which are rented. The bank began studies several years ago to examine a new headquarters, and looked at an urban location downtown, and a suburban location. Throughout the last 50 years, most large private companies have opted for the latter, and not without good reason. The logistics are simpler, the land is cheaper, the parking is easier – a study commissioned by TFC showed they could have saved over three million dollars by choosing a suburban site. But, as downtowns like Ithaca’s have made a resurgence in popularity, and given the bank’s long-time presence in downtown, they decided to pursue the urban option.

The new headquarters, first proposed in March 2015, will keep 282 employees in downtown (making an average annual wage of about $81k), add 18 more from the consolidation of the Craft Road office in Lansing, and potentially add a number of new jobs as the bank continues to grow. The IDA application gives 6 new positions over 3 years, all well over living wage; paperwork submitted to the city says 77 jobs over ten years. The project applied for and received a ten-year tax abatement from the Tompkins County IDA, saving about $4.06 million in property taxes and $2.112 million in one-time sales taxes. The community hearing was generally supportive for an abatement, and even with the reduced short-term tax bill, a net positive of $3.78 million will still be paid in taxes over the next decade.

Now, a little about the site and the building. The project is really two separate projects, one much smaller than the other. The first, at 119 E. Seneca, will build a 965 SF drive-thru bank branch on what is current first floor parking underneath a 1970s office building owned by TFC. The surface lot will be reconfigured to support the drive-thru functions, and retain a small amount of parking space.

Across the street is where the real meat of the project is. Construction is currently underway on a 7-story, 110,000 SF commercial building at 118 East Seneca, with customer services and 20-25 parking spaces on the first floor and office space on floors 2-7, which will have larger floor-plates that will overhang over the first floor. The first through third floor offices will be geared towards consumer retail operations, and the top four floors will house general operations and senior leadership. The building will be 100 feet tall, just like the 10-story Marriott finishing up a few blocks away. Modern office buildings usually have 14′ floor-to-ceiling heights due to the size of heavy-duty commercial utility systems, better visibility and natural light penetration, and to provide ample accommodation for tenants’ computer equipment. A bit of a prestige factor also comes into play. Materials include a granite base, stone veneer on the front, light and dark brick veneer, and aluminum panels on the top floor’s sides and rear walls. TFC’s HQ will be built to LEED standards, but the company will not be seeking LEED certification due to the costs involved.

The new headquarters replaces a parking lot and drive-thru bank branch  built in 1990, and prior to that the site was home to the two-story Temple Theater, which despite described as “cramped”, “shabby” and “grungy”, brought to Ithaca the first showings of “The Godfather” and other big-budget films of the early 1970s. The Temple Theater operated from 1928 to 1976, when it closed not long after the mall opened in Lansing. The building was razed not long afterward.

Estimated costs have bounced around a little bit – initially reported as $26.5 million, they were up to $28 million by the time of the IDA application, and $31.3 million at the time of groundbreaking. The March sketch plan called for final approvals by June 2015, but they didn’t happen until December 2015. Not entirely the city’s fault, the timeline was very ambitious.

The site has been partially cleared and the existing drive-thru branch has been demolished. Currently, the project is undergoing foundation excavation and pile-driving. You can see the trenches being dug along the perimeter, and wood lagging and steel H beams have been laid along the outer edges to provide stability to the soil and buildings of adjacent properties. According to the report from Elwyn & Palmer, the project team will dig down about 12-13 feet for the sub-floor, thenceforth pile driving shall commence, 65-70 feet down. It’s anticipated the sandy soils will make the pile-driving move along faster, but the other buildings nearby will necessitate temporary support installations during the excavation process. Ithaca firms HOLT Architects and Trowbridge Wolf Michaels Landscape Architects are responsible for the design of the project, and Rochester’s LeChase Construction is the general contractor.

When TFC’s new headquarters opens in March 2018, expect something of a glut in the local office market as a lot of space is emptied in a short time. TFC CEO Grag Hartz has said that 119 and 121 East Seneca would be held onto and rented out, with the bank retaking space in those buildings as it needs. However, their office and bank on the Commons (the historic 2 and 3-story buildings on Bank Alley just south of the M&T Building) would be sold. The project is indirectly spurring Bank Tower’s conversion to apartments, given the tepid office market but very hot residential market downtown. Token teaser if you’ve read this far – a second conversion project is in the early stages.

20160821_131028 20160821_131051 20160821_131105 20160821_131118 20160821_131220 20160821_131331

tfc_final_1

tfc_v2_1

tfc_2

tfc_v3_3 tfc_3  tfc_v2_3





Ithaca Marriott Construction Update, 8/2016

27 08 2016

If all had happened to plan, the hotel would have opened this past Tuesday. Unfortunately, things did not work out as planned, as it often happens with large construction projects. Marriott’s website gives an October 2016 opening. A few simulations of the room interiors are included below. If I remember right, a while back someone told me that the rooms are a little smaller than Marriott’s standard (which looks to be true – the king-sized rooms are 300 SF, and comparables that I’m finding at other Marriotts are 360 SF), so the interiors were designed to be more plush and higher-quality to compensate. Among the amenities include 49″ TVs, Wi-Fi, mini-fridges, a business center, a fitness center, an “M Club Lounge“, laundry service, complimentary coffee/tea, down comforters, and a bunch of other things that are staples of premium hotels. The in-house restaurant will be called “Monks on the Commons”, and serve American comfort food, breakfast, lunch and dinner. Kinda interesting to see which local restaurants they chose to highlight on their website.

Of the 159 rooms (finally, a confirmation it’s not 160!), 8 will be suites, and the hotel’s 3 meeting rooms total just under 2,500 SF. I tried to set up a reservation to see the prices, but the website wasn’t allowing bookings. The “largest event space” can hold 198 guests, along with the ridiculously cheesy line of “Reserve our wedding venue in Ithaca, NY and say ‘I do’ in a ceremony as unique as your love. ”

So, those are to-be’s, now to the what-are’s. On the outside rear, the Nichiha metal panels are being attached to the waterproofed sheathing. The brick is done, but the stone veneer on the lower floors has yet to be applied. You can get an idea of the interior work underway by peering through the suite rooms, which face the Commons and State Street; notice the work on the ceilings progressing as one works their way down from the top floors.

20160821_133646 20160821_133806 20160821_134053 20160821_134658 20160821_134705 20160821_134831 20160821_135014 20160821_135108 20160821_135113 20160821_135159

ithmc_phototour06 ithmc_phototour07 ithmc_phototour12

marriott_rev1_1





409 College Avenue (Student Agencies eHub) Construction Update, 8/2016

26 08 2016

The Student Agencies Building at 409 College Avenue has received its new glass curtain wall. The glazing seems to have just arrived judging from the brackets. New windows have yet to be installed in the center column, and there’s still other work on the exterior to-do list, such as the etched glass railing for the second-floor balcony, the brise soleil, and minor trim work.

Note that the top (fourth) floor appears to have also been redone. This was not in any of the renders, although the Planning Board’s Design Review panel probably had to sign off on it. It’s likely that this is one of the reasons why the renovation work has gone on longer than anticipated.

STREAM Collaborative is the architect, and on their website are some interior renders of the new eHub co-working space. A couple shots are embedded below, but more can be found on STREAM’s website here. Morse Construction Management is the general contractor.

EDIT: I asked STREAM’s Noah Demarest if the fourth floor was a last minute change. “Yes. Last minute change due to the facade being in far worse condition than we thought. It is completely rebuilt. We have technical drawings we submitted to staff but never updated the renders.”

20160821_103915 20160821_103933 20160821_103951

409_final_1 409+2nd+Floor+West 409+Multi-Purpose+2

20160415_101834

 

 





327 Eddy Street (Dryden Eddy Apts) Construction Update, 8/2016

24 08 2016

Number two on the follow-up of Collegetown mid-rises, the 22-unit, 53-bedroom Dryden Eddy Apartments should be open to tenants by this Friday. According to developer Steve Fontana, the issue was that the elevator had yet to be fully integrated with the fire alarm system, so the city couldn’t issue a certificate of occupancy until that was taken care of.

Also worth noting, Fontana has secured two tenants for the first-floor commercial space (originally it was supposed to be a gym, but those plans faded out at some point). The Papachryssanthos family, one of Collegetowns old greek families and the proprietors of the Souvlaki House two buildings down, will be splitting the 1800 SF into a liquor store (aptly named “Ithaca Wine and Spirits”) and a café called “Chatty Cathy”. The owners of the East Asian grocer Tung Fong retired, and the Pixel bar and Club Sudz laundromat have passed into memory.

While not as ground-breaking as 307 College, 327 Eddy still serves as a useful addition to Collegetown, offering density in an appropriate location and maintaining a wall-to-wall streetscape with its neighbors. The density will be an asset by providing additional foot traffic to neighborhood businesses, and (back-of-the-envelope estimate) there will be an additional $160,000/year in property tax revenues for the city, county and school district. The final product fits in with a nice design, though I personally prefer the originally-approved plan, with one more floor and a crown set back from the face in the shape of a triangular prism. The rectangular crown makes it look too similar to its neighbor down the road at 309 Eddy. Something I had not realized until now was that the rear (east) face was totally reworked as well, with bay window projections instead of the smaller “punch-out” windows, which comparing the two, seems to be an improvement. But I digress, taste is subjective.

The construction cost was at least $4.824 million, with financing provided by Tompkins Trust Company. G.M. Crisalli and Associates of Syracuse served as general contractor for the project.

Before:
6-29-2014 158

After:

20160821_123606 20160821_123800 20160821_123751 20160821_123644 20160821_123624
20160821_123309 20160821_123334

327_eddy_rev4_1 327_eddy_rev2_1

327_eddy_rev1_3