LeChase Construction is making good progress on Conifer LLC’s 68-unit Cayuga Meadows apartment project off of West Hill Drive in the town of Ithaca. The wood frame is topped out on the north side of the L-shaped building, where they’re starting to nail plywood (the decking) to the roof trusses – later they’ll be covered over with tar paper or a similar material, followed by the shingles. It also looks like they’ve started attaching a little Tyvek housewrap to the second floor of the structure. As you go southward, framing is only up to the second floor, with rough openings in the plywood for doors and windows. At the rear of the property, a trench has been dug for a new water main, which is being routed below what will be the building’s parking lot.

The apartment units, which are intended for seniors with limited incomes, are expect to be ready for occupancy next fall. More information about the project can be found here.

20160918_154000 20160918_154027 20160918_154050 20160918_154218 20160918_154325 20160918_154352 20160918_154401 20160918_154405

Cayuga-Meadows-2 Cayuga-Meadows-Shot


Actions

Information

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s




%d bloggers like this: