327 Eddy Street (Dryden Eddy Apts) Construction Update, 6/2016

19 06 2016

Steve Fontana’s mixed-use project at 327 Eddy Street has topped out since the April update. The exterior stud walls are up on the front facade, as is a little gypsum sheathing. The CMU Block rear portion is also topped out, although it appears that the design of the rear was also changed/value engineered such that it no longer have the larger band of windows on the top floor. The large window at top center is split between two units,  and using the wood stud walls as a guideline, one can kinda get the impression of soaring ceilings and a big, glassy open space. More interior wall faming can be seen from the rear of the building. Units range from studios to 5-bedroom apartments, with prices starting at $950/person and topping out at $1250/person for choice units.

While the apartments are able to command to premium price, Fontana has had issues finding a commercial tenant for the 1,800 SF first floor, and expressed his concerns at a city PEDC meeting where the active-use code for Collegetown was modified to match the slightly more flexible code used with the Commons.

Things should be moving right along for an August opening.

20160608_164146 20160608_164214 20160608_164236 20160608_164251 20160608_164449 20160608_164504 20160608_164509 20160608_164513

327_eddy_rev4_1

327_eddy_rev2_3





Eight Years Later

18 06 2016

20160608_124857

It’s kinda hard to believe eight years have passed since this blog was started. Last year, I drafted this post up on the early side, but this year, I’m kinda waited until the “last moment”, mostly because I wanted to figure out just what exactly I wanted to write.

stats_2016

In previous years, the blog averaged 82, 166, 199, 216, 182, 155 and 219 hits daily. Over this past year, 97,401 hits were recorded, just over 266 hits per day, leap day noted.

The blog has its niche. Photo sets for construction projects run every month – Collegetown, Downtown, and projects in Lansing/Dryden occupy even months, while Cornell, Fall Creek, South Hill, West Hill and the rest of the county run during odd-numbered months. Fall Creek and Lansing/Dryden switched places this year to balance the workload. Nearly every Saturday at 0000 UTC, there’s “news tidbits”, the weekly news roundup, and if I’m motivated and have time, the other weekly topical post goes up Tuesdays 0000UTC. I like regularity.

One of the things that changed up over the past year was with role in the Voice. For the first year of so, most of it was Jeff pulling things he thought would work well for Voice content, and using it nearly word-for-word. But, over the past year, the Voice has had a greater proportion of unique content, so one has to read both to get all the development news.

Writing for the Voice on the side of my primary job has its fun times and its stressful times. There’s a lot of curious readers out there, and it’s great to engage with them. The stressful part is time management and just trying to stay on top of everything.

stats_2016_2
In the past year, some projects have finished up – the Lofts @ Six Mile Creek, 206 Taughannock, the Carey Building is virtually complete (what a difference a year makes), 707 East Seneca wrapped up on East Hill, and Ithaca Beer finished their addition. Cornell finished Klarman Hall, and the lakeside mansion at 1325 Taughannock was also finished. The modulars at 804 East State were approved, built and finished by the end of the winter. HOLT Architects completed the renovations for their new HQ, Texas Roadhouse wrapped up, and the Belle Sherman Cottages just sold their last house.

Other projects are only just starting their construction journeys. 210 Hancock and Varna’s 902 Dryden were approved, last summer and this spring respectively. Both are expected to start construction this summer. Cornell has started work on the new Breazzano Executive MBA Center in Collegetown, and several block away, John Novarr is building Phase III of Collegetown Terrace. Work is just starting up on Conifer LLC’s Cayuga Meadows affordable senior apartments building on West Hill, while down the road the Brookdale facility is well underway.

Some things are still plodding along through review, like the Travis Hyde plans for the Old Library site, and the Chain Works District. Other proposals are still trying to figure out financing, such as 323 Taughannock and Harold’s Square. Then there are projects that are just big question marks right now, like the Chapter House Rebuild. Maybe there will be some solid development there next year.

There are also new plans presented during the past 12 months – 815 South Aurora and 201 College from developer Todd Fox, Cornell presented plans for renovations to Hughes Hall, and to redevelop Maplewood Park. 1061 Dryden will be sparking the latest development debates in Varna.

Lastly, a few plans bit the dust. State Street Triangle is probably the most well-known, but there were others such as INHS’s Greenways townhouse project, and College Crossings on South Hill. The owners of the SST site still want to redevelop it, but Campus Advantage won’t be involved.

This past year definitely had its share of debates and controversies. Virtually every project from home lots to big buildings has some level of opposition, but some are particularly contentious. State Street Triangle, the Maguire plans, the bar once planned for 416-418 E. State, Black Oak Wind Farm. BOWF is especially worrying. With goals such as affordable housing and renewable energy, there are times Tompkins County’s residents seem to be their own biggest enemies.

Some of my favorite posts this year include the two-part write-up about Ithaca’s Urban Renewal, and the analysis of 30 years of Tompkins County new construction permits. There were looks at the Fall Creek housing market and the NYSDOT Waterfront feasibility study. The Newfield UFO and the tour of STREAM Collaborative’s net-zero house offered diversions from the typical posts.

Eight years is a long time, and there will be some major announcements later this year. Stay tuned.

 





News Tidbits 6/18/16: Wit Fails Me After Eight Years

18 06 2016

201_college_v4_1 201_college_v4_2
1. Let’s start off with a brief update on 201 College Avenue. My colleague Mike Smith at the Voice did an encompassing article on the topic late last Friday, and there have been a couple more modest developments as of late. Apart from the multi-million dollar sale mentioned last week, the city’s Design Review Committee also gave their input on the project. They said they like the current form of thje building’s front (west) entrance, because it calls forth elements of Grandview House a few doors down. they also recommended darker or neutral grey colors to minimize the appearance of the fifth floor, more windows along College Avenue, warm accent colors, and tweaks to the window and cladding scheme. The resulting revisions were incorporated into the latest building design seen above, and for which additional images, material samples sheet and interior plans can be found here. The project will be discussed at the Project Review meeting next week, and the official Planning Board meeting Tuesday 6/28, at which the public hearing will be held, and consideration of preliminary approval.

107_s_albany_v2_2

107_s_albany_v2_1

2. Speaking of design review, 107 South Albany also went through the committee this week. Recommendations included projecting window sills, stucco all the way back to the rear balconies, and noting on docs that the large sign on the existing building would be removed during the renovation. Site Plan Review app here, drawings here, Full Environmental Assessment Form (FEAF) here, planting plan here.

The renovation and addition seems like a good example of re-use in a corridor that the city is targeting for new investment. It preserves the century-old structure and adds housing in such a way that, by location and design, doesn’t have a significant visual impact. By zoning, Nick Stavropoulos could have sought five floors if he wanted. This plan will be going through the whole shebang at the June meeting – Declaration of Lead Agency, Public Hearing, Determination of environmental Significance, and Prelim and Final Approval.

Among other things to be discussed at Project Review and the Planning Board meetings – Prelim/Final Approval for 602 West State Street (the Elmira Savings Bank project), signage for Collegetown Crossing, and a few minor zoning variances. New sketch plans, if any, will be announced on the PB Agenda next week.

3. This week in big sales – someone plunked down $680,000 on a house at 107 Catherine Street in Collegetown. I say somebody because they conducted the purchase through an LLC (aptly named “105-107 Catherine Street LLC”) registered by a local law firm last summer. Just like the Maguire purchase of the Carpenter Circle land, this effectively hides the buyer from public view. The same purchase bought 105 Catherine for $780,000 last November. It looks like 105 has 10 bedrooms and 107 has 7 bedrooms, based off assessment docs.

cafd1

105 and 107 Catherine make up the edge of the CR-4 Form District. By zoning, an applicant could build up to four floors, no parking required. A development plan would likely consolidate lots. Something to keep an eye on. Collegetown is getting to be a very expensive place.

4. Meanwhile, here’s something that’s just hitting the market. For the budding landlords, 306 North Cayuga is up for sale. The “C. R. Williams House” was built in 1898 (interior/exterior photos from the early 1980s here). The current owner, Jeff Kalnitz, picked it up for $300k in 1997, had it on and off the market a couple of times, and then decided to do a thorough ILPC-approved renovation. The 12,500 SF property, which holds six high-end apartments and approvals for a seventh, is being offered at $1.45 million. It’s worth looking at the listing if only for the glamorous interior shots.

amici house 1 county
5. On Tuesday, the Tompkins County Legislature will vote on whether or not to take $118,000 from the county’s general fund to indirectly help build head start classrooms and a living facility for homeless young adults.

The $118,000 would be use to purchase a house at 661 Spencer, whose land would be incorporated into plans for a 23-person facility for homeless young adults (some with children) aged 18-25, and five classrooms. The classrooms would be built as one building, while the housing looks to be an addition to the TCAction building. The one-story house at 661 Spencer, built in 1950 and formerly formerly owned by the Amici family, would be removed.

The plan is the latest incarnation of TCAction’s Amici House project, slated to share their headquarters property at 701 Spencer Road on the southern edge of the city of Ithaca. TCAction first acquired their property with the help of the county back in 2001; the cost of the purchase is paid back to the county in the form of a 20-year lease.

If the legislature approves, the lease would be extended by two years so TCAction can pay them back for the up-front cost of buying 661 Spencer. The Amici House project would be completed by 2018.

6. Poet’s Landing in Dryden will be moving forward with its 48-unit second phase. The rentals, which are targeted at individuals making 60% of county median income, are expected to begin construction in August with a late summer 2017 opening. Phase I, which consisted of 72 units, opened in early 2013. The state awarded the project $1,600,000 from its Housing Trust Fund, and $734,956 in Low-Income Housing Tax Credits to help finance the apartments’ construction.

tfc_v2_1

7. Tompkins Trust held the official groundbreaking this Friday for it’s new 7-story headquarters. Plans were slightly delayed after some issues arose with NYSEG. The current plan is to have the 123,000 SF building ready for occupancy by March 2018. Costs have risen somewhat, from $26.5 million to $31.3 million.





409 College Avenue (Student Agencies eHub) Construction Update, 6/2016

17 06 2016

The Student Agencies eHub renovation seems to be moving along, though perhaps a little slower than originally anticipated. Luckily, since Cornell’s in summer intersession, the offices aren’t be used as much as usual, which allows work to commence on the second phase of renovations. Under the scaffolding, it looks like the old facade is off and work on the new glass curtain wall is underway.

20160608_163016 20160608_163049 20160608_163117





Ithaca Marriott Construction Update, 6/2016

16 06 2016

The Marriott is moving right along. Ten stories of reinforced concrete topped out at the beginning of May, with the mechanical penthouse being the last component. Exterior steel stud walls have been erected, fire-proof gypsum sheathing is being installed, and the black waterproofing material has been sprayed all along the front (east) face, and most of the back (west). Work on the brick veneer is steadily progressing up the north and south faces. The first floor facing South Aurora will have a stone veneer, while the top floor and the overhanging portion of the west face will use a few different shades of grey Nichiha fiber cement panels.

Work is also continuing inside as well – interior stud walls, electrical, plumbing, and HVAC. Specialty projects such as utilities are typically handled by various sub-contractors selected from bids.

In case you missed it, I did an interview with contractor W.H. Lane Inc. about the project for the Voice here. Plans still call for an August 23rd opening. During a debate on diversity at the latest city PEDC meeting, TCAD’s Heather McDaniel mentioned that Marriott has already hired four staff for the new hotel, of which three are women, including the general manager.

20160608_124634 20160608_124930 20160608_125143 20160608_131533 20160608_131621 20160608_131747 20160608_131812 20160608_131905 20160608_131932 20160608_132051 20160608_132111 20160608_132115 20160608_132201 20160608_132819 20160608_134654

marriott_rev1_1

 





209-215 Dryden Road Construction Update, 06/2016

15 06 2016

At the site of the new Breazzano Family Center for Business Education, work continues on the foundation. It looks like excavation is mostly complete at this point and they’re putting in concrete footings, with digging for a new footing taking place at left in the first photo. The rebar doweled into the concrete will be tied into the walls as they’re built up. The footings closest to 205 Dryden (westernmost section) will hold the elevator shaft, stairwell and restrooms for each floor.

For those wanting a glimpse of the future, Cornell has put up a video render on Youtube showing the new building (exterior and interior) and advertising some of its features. There is an embedded copy of the video clip below.

20160608_162032 20160608_162035 20160608_162040 20160608_162217 20160608_162257 20160608_162323

209-215_2 209-215_basement





Hotel Ithaca Construction Update, 6/2016

14 06 2016

The Hotel Ithaca’s new wing seems to be moving right along. Most of the foundation has been completed. Some wooden forms used for foundation pours can be seen in the third photo, right next to the reinforced concrete footing. CMU walls create interior partitions within the building’s footprint – likely space for some of the 90 future hotel rooms, although none of the published materials online have shown an interior layout of the new wing. It’s suggested in the project site plan review documents that the new fitness center, breakout rooms and meeting rooms will be near where the new wing will connect to the existing hotel. Given the lack of windows or an entrance on the the first floor of the new wing facing South Cayuga, some of those function spaces are probably down at this east end of the wing, nearest to the street. Early plans did have an entrance on the South Cayuga side, but it was removed during project revisions.

The $9.5 million project is expected to open to guests in May 2017. More info about the project can be found here.

20160608_131325 20160608_131331 20160608_131351 20160608_131419 20160608_131442 20160608_131446





Carey Building Construction Update, 6/2016

14 06 2016

Another project that’s nearing the finishing line. Travis Hyde Properties will be wrapping up their Carey Building overbuild over the next several weeks. The target move-in day for tenants is June 15th, but there have been some last minute hang-ups with NYSEG and getting the utility services all ready to go, so I’m not 100% positive that date is still accurate. Side note, NYSEG is also the same reason why Tompkins Trust has been unable to commence with their new headquarters project.

I can finally affirm that the brown tinted glass looks different than the plywood placeholders. Actually, it’s a nice bronze shade that complements the synthetic stucco and terra cotta quite nicely. The bronze glass will also be used in the unfinished vertical section in the east facade.

Also, a really cool detail – the overhang of the fourth floor has been outfitted with color-changing LED lights, which will make going out onto Rev’s third floor rooftop patio that much more interesting. I’m willing to bet they can be programmed for standard white light, and for special occasions.

As mentioned in the weekly roundup a couple weeks back, rents on the units are going from $1,225/month for the microunits to $2,699/month for a high-end penthouse 2-bedroom. At the time of the WSKG newspiece (May 22nd), 5 of the 20 units already had claims staked. The THP webpage still lists all the units as available in the list of vacancies (although the list doesn’t look like it’s been updated since some time in May), but on another part of the website, only the lowest-price studios, the $1,225/month units, are listed as still available. There are 4 $1225/month studios, 2 $1250/month studios, 2 $1300/month studios, 6 $1325/month studios, and 2 $1350/month studios. So, assuming the website information is fully-encompassing, that would imply that at least 12 of the 16 micro-units are rented, and an unknown number of the 4 2-bedroom units, which range from $2337-$2699/month.

Apart from the specialty glazing on the exterior, a potential future wall mural, and whatever finishing work is left inside, this one’s wrapped up. John Snyder Architects and LeChase Construction have left their mark on the downtown Ithaca skyline.

However, work on this block isn’t likely to stop anytime soon – just as the Carey wraps up, the Hilton Canopy hotel will be getting underway. The Canopy is targeting an early 2018 opening.

20160608_132229 20160608_132255 20160608_132334 20160608_132357 20160608_132428 20160608_132535 20160608_132922 20160608_134712

carey_rev5_1 carey_rev5_3 carey_rev5_2





Simeon’s Reconstruction Update, 6/2016

13 06 2016

Almost done. From the outside, work on the Griffin Building (Simeon’s) reconstruction is nearlycomplete – glancing at the lead image, it’s almost as though the tragic semi-truck crash never happened. But, looking closely, one can pick out telltale signs – for instance, the new brick isn’t the same shade as the century-old brick in the undamaged section of the 1871 building. New energy-efficient windows are being fitted on the east facade. The ZIP panels facing the Commons will be overlaid with cast iron, some of which will be restored panels that were put into storage after the emergency demolition, and refurbished while construction was underway.

Inside, McPherson is progressing with drywall and utility work for the upper-floor apartments, and Simeon’s contractor (Fahs Construction Group of Binghamton) is building out the first and second floor restaurant space to house the new Simeon’s. The new entrance to Simeon’s will also be faced with cast iron. Initial plans called for a June opening, but according to city Planning Director JoAnn Cornish, they’re now looking at August. The apartments are expected to be ready for occupancy by late August.

20160608_132219 20160608_132559 20160608_132637 20160608_132652 20160608_132734

20160608_132134

simeons_v2_1





News Tidbits 6/11/16: Summer’s Heated Discussion

11 06 2016

Image Property of HOLT Architects

1. We’ll start this off out in Lansing. The 153 acres of land for the Lansing town center is once again in the news. The Lansing Star is reporting that the town is once again serious about selling the land.

So begins yet another chapter in the 20-year saga of the town center land. The town bought the land from the state in 1993 for $100,000, and at the time the land was deed-restricted to recreational use. In 2012, the town paid an additional $294,800 to remove the recreational deed restriction. An article about it was published here in August 2012 (original map below; dunno where why offhand it says 156 acres vs. the 153 reported now). HOLT Architects and TWMLA were hired to draw up some overarching design themes, a Request for Proposals was issued, and three developers responded.

lyc2

Calamar Enterprises’ Buffalo office submitted a proposal for a $17.4 million, 110-unit market-rate senior apartment building on 13.5 acres, and Cleveland-based NRP Group submitted plans for 80 one-story patio homes on about 15.5 acres. Calamar later re-sited their project at the town’s wish to the northern part of the land, and increased the number of units to 124. Green Square, led by David Taub and HOLT Principal Graham Gillespie, proposed 60 units of housing and 23,000 square feet of retail in 2-3 story arrangements, and civic and recreational space. Altogether, the value of the three would have approached $50 million.

gs_phases

However, all of this was contingent on a sewer being built, which did not happen. The developers agreed to do a package plant that would service just the town center, there was discussion of an IDA-backed tax incentive zone, and the town stood to make a hefty return on investment, but…to quote the Star, “However, the deals fell through.  Actually it seemed more like they just faded away. At least one of the developers had signed paperwork saying they intended to purchase acreage from the Town.  The Town didn’t seem in any hurry to sell the land, even with clearly interested developers.  When the developers disappeared there was no reported effort by the town to pursue the deals.”

Since then, the town continues to get a steady stream of interest, but no real idea on how they want to move forward. Like Ithaca city and town, they’re looking at the possibility of Form-Based zoning for the site, and the town hopes to issue a more specific RFP than before, incorporating revised assessment values. The most intensive approach involved the Form-Based Code and a specific RFP, the least specific is just putting up a for-sale sign ans seeing what happens. Whatever the case, the lax approach the town has taken the past few years may no longer be feasible, with the ticking tax time time bomb of the possible power plant closure looming over the town and schools’ budgets.

old_library_thp_v4

2. Speaking of long processes, the Old Library project has formally filed paperwork here to begin the application process for the Certificate of Appropriateness from the Ithaca Landmarks Preservation Commission. The meeting is scheduled for city hall at 5:30 Tuesday the 14th. Although it says early design review, a lot of the legwork has already been done at this point, since the Planning Board and ILPC have been conducting joint meetings with the project team over the past several months to create a design that they’re all comfortable with. However, the ILPC is likely to refine some details moving forward.

old_library_thp_v4_2
At this point, the unit mix consists of 22 1-bedroom units with about 700 SF each, 25 2-bedrooms with about 900 SF each, and 10 2-bedrooms with 1200 SF each, the extra space intended as a den or home office. The building also includes a 1,800 SF community room to be administered by Lifelong, and 3,750 SF of first floor commercial space. The total facility size comes out to about 85,600 SF, and parking for 25 cars and at least 12 bikes, and another 34 bike spaces for the community room. Exterior materials include brick, limestone, and a couple forms of fiber cement, including wood-textured fiber cement.

Southeast+Rendering

3. The STREAM Collaborative House at 228 West Spencer is up for sale. The house has its own website here. The 1,152 SF, 2-bedroom net-zero energy house is listed at a price of $305,000. For more info on the house, Noah Demarest was kind enough to give a construction tour of the house while it was underway, and the blog post I wrote up afterwards can be found here.

evergreen_dryden_1
4. It’s pretty clear at this point that the Evergreen Townhouses project at 1061 Dryden is evolving into the next hot-button development issue out in Varna. The Times has their interview with the angry neighbor here, and more info can be found in the town of Dryden’s April planning board meeting minutes here. So far, the only image of the townhouses themselves has been a perspective that only shows massing – 2 stories, gabled roofs.

Also of note is the town of Dryden Planning Department’s recommendation to the town board (and the planning board’s approval) for an increase in density in certain areas. The change in code affects parcels zoned rural residential, with municipal water and sewer access. The density would be increased from 2 units per acre to 6 per acre. Looking at the zoning map and the sewer map, that would primarily affect the corridor from Varna to the 13/366 intersection, and a rural swath just north of Dryden village near TC3. What this would do is allow 1061 Dryden Rd to withdraw PUD application, and apply for a special use permit (SUP), which are generally easier to obtain.

On a side note, googling Tiny Timbers brings up a Times editorial, written by the Times, that argues against Tiny Timbers for not fitting in with the appearance of Varna. Actually, it kinda takes everyone to task, from developers to town government to residents. But, to make one counter-point regarding mixed-use, commercial services need a certain amount of traffic (not necessarily vehicular) to thrive. If the population base within a certain radius isn’t there, the risk is too great for someone to put their money on the line and hope that they can somehow draw in customers. If Varna wants a mixed-use center with shops and cafes, they’re going to need the population to support it. Some think that will include 1061, some (probably more) think Tiny Timbers, but if there’s no “push”, the ball won’t be rolling.

201_college_v3_1

5. A couple of minor things to note in sales. The 4,200 SF former “Imperial Buffet” property next to the Shoppes at Ithaca Mall has sold to a Syracuse-bsed LLC (Watersprite LLC, established 2004) for $590,000 on Friday the 10th. I personally will always remember this place as being the only place my mother was comfortable with eating in Ithaca because she hates eating out, and felt everything else was “snobby and expensive”.

Meanwhile, the 12-bedroom, 2,837 SF house at 201 College Avenue, the property subject to a heated debate between Neil Golder and Todd Fox, sold for $2.65 million on Friday the 10th, which seems outrageous except that it’s becoming the norm for inner Collegetown transactions – Novarr picked up 5,500 SF 215 College for $5.3 million last year. There will be no delving into that debate again this week, but the city uploaded 580 pages of documentation here, and my colleague Mike Smith is preparing a story for the Voice.

20160522_143925 20160522_143949

6. Houses of the week. This pair of duplexes are being built on Birdseye View Drive near Ithaca College. Each house has a 4-bedroom unit and a 2-bedroom unit; recent advertisements on Craigslist (since expired, so no link, sorry!) have them $750/bedroom. The developer is the owner of Mahogany Grill downtown, who also happens to be a part of the business team renovating the former Lucatelli’s into a new restaurant, a Tapas and pasta restaurant called Mix Social Dining after the chef’s wife.