Belle Sherman Cottages Construction Update, 6/2015

16 06 2015

At the Belle Sherman Cottages project site, the first five townhouses (lots 25-29) have had their modular units delivered and craned into place. Waterproofing sheathing can be seen on some of the dormers where the “Autumn Red” and “Savannah Wicker” Certainteed clapboard siding has yet to be installed. and some of the front-facing garages still have unsheathed plywood showing, with rough garage openings. taking a guess, it looks like the work crews are working from north to south (29 to 25) on the two-bedroom townhomes.

The units have a slightly staggered elevation, with the units decreasing a few inches as the row progresses southward. The change in profile makes each unit a little more visually distinct.

A couple walking by as I was taking photos pointed out how curious it was that only the center unit, lot 27, has a rear deck. But, optional features are optional features; que sera sera.

Next to lots 25-29 are the lots for the second set of townhouses, 20-24. The foundation for those homes has been excavated, and at some point soon, the water will be pumped out, footers poured, and the CMU block foundations will be laid for the new units.

On the other side of the property, the last of the marketed homes is under construction. Lot 11 is a “Classic Farmhouse” with Autumn yellow siding and the usual white trim. The four Simplex modular units have been delivered and hoisted onto the foundation (Jason at Ithaca Builds offers a great rundown of the modular units here). Over the next few weeks, the house will be sided, the interiors will be finished out, and the porch and remaining trim will be attached.

The first set of townhomes should be ready for occupancy this summer, and the second set might be ready by August but that seems like a stretch; I’d wager that early fall is more likely. One more single-family house, lot 9, is due to be marketed and built at some point in the near future; the project will then be fully built out, about 3.5 years after the model house was built.

The Belle Sherman Cottages project on East Hill consists of 19 single-family detached homes and 10 townhouses, developed by Skaneateles-based Agora Development and built by local company Carina Construction.

20150613_182058 20150613_182122 20150613_182129 20150613_182209 20150613_182323 20150613_182343

belle_sherman_townhouses_2

belle_sherman_cottages_102714





Carey Building Construction Update, 6/2015

15 06 2015

At a quick stop at the Carey Building Friday before last, workers at the Carey Building site were busy preparing a utility duct line for the new Hilton Canopy Hotel next door, according to one gentleman I spoke with at the site. Building contractor LeChase Construction has completed the underpinning work on the Carey Building, strengthening the foundation to support the five-floor vertical addition. LeChase will also be handling the construction of the Canopy Hotel next door.

The Carey Building itself has sidewalk scaffolding up, and a section of the rear facade has been removed. I think that would be for the construction hoist, and the swing cab telescoping boom construction crane in the second photo is the one that’s being used for assembly of the structural steel. Quick disclaimer, if I’m wrong, please call me out. My day job of studying pollutants and puffy clouds isn’t helpful here.

I also had the good fortune to run into developer Frost Travis while having lunch, and he happily stated that steelwork would begin the week of June 8th (which is about two weeks behind schedule, but let’s not begrudge him given that whole issue with the building design that arose a couple months back).

So of course, swinging by to take updated photos was a must. One week later, there’s steel columns five stories high (the height of the addition), with steel crossbars for stability, and joining plates to secure the steel framing for the floors. My marginally-educated guess is that this is the frame for the elevator shaft, based off the floor plans.

The Carey Building addition will add a third floor and 4,200 sq ft to the Rev business incubator (nearly doubling it to 8,700 sq ft), and on floors 4-7, there will be 20 apartments. Floors 4 and 5 will have 16 studio apartment units that average only 400-500 sq ft, their small size enabling them to be rented at a lower price. The 4 units on floors 6 and 7 will be larger 2-bedroom units. The $4.1 million project is being developed by local firm Travis Hyde Companies.

Expect this project to finish sometime in the very late summer-early fall timeframe.

20150605_114119 20150605_114225 20150605_114248 20150605_114328

20150613_181342

20150613_181351





Lofts at Six Mile Creek Construction Update, 6/2015

12 06 2015

It won’t be long now, this project is in the home stretch. The protective plastic wrap is off and the product is almost ready to hit the market. The work at the “Lofts@Six MileCreek” site is mostly interior finishing at this point. A few of the exterior panels/window glazing had yet to be finished in these photos from last Friday, but a glance at the project’s facebook page shows that the windows have been installed, but the panelling has yet to be hung. Some other exterior finishes, such as balcony railings, are only partially completed as of now. A formal opening by late summer seems likely, thus completing the last phase of a 15-year project.

Looking at the rental agreement, tenants are allowed to have pets (for a $500 refundable fee and a $50 monthly rent surcharge), no more than two tenants may share a bedroom, and income is expect to be three times rent. 12 month leases only, 1 month’s rent as a security deposit.

With rents ranging from $1,220/month and up, that means that the minimum a tenant can make and live in the building is $43,920/year. A top end 2-bedroom unit, at $2,655/month, requires $95,580/year. The three studios range from $1,220-$1,460/month, one-bedrooms from $2,160-$2,355/month, and two bedrooms from $2,095-$2,655/month. There’s no doubt these are premium prices, and as discussed in the last update on this project, that’s not necessarily a bad thing for everyone else.

The Lofts at Six Mile Creek project consists of a a 7-story, 49,244 square foot structure that will contain 45 rental apartment units: 3 studios, 21 1-bedroom and 21 2-bedroom units. The building is being developed by Bloomfield/Schon + Partners out of Cincinnati, and construction is being handled by Turnbull-Wahlert Construction, also based in Cincinnati.

Leasing is being handled by CSP Management, and interested readers can apply for an apartment here or call 607-277-6961 if they feel so inclined. Questions can be directed to info@IthacaLofts.com.

20150605_114748 20150605_114809 20150605_114830 20150605_114902 20150605_114923 20150605_115108

cayugaplace_v5

 

 





114 Catherine Street Construction Update, 6/2015

10 06 2015

Workers have been busy at the site of 114 Catherine Street in Collegetown. On Friday, a flatbed truck was parked just off-site, delivering the roof gables for the 3-story, 17-bedroom apartment building. Framing for the structure is actively underway, with recently-created rough openings showing the position of the windows and doors in the new 3-unit structure.

The architect behind this project is local architectural firm Jagat Sharma, and he building is being developed by Ithacan Nick Lambrou of Lambrou Real Estate. Plans call for the replacement of a parking lot with a 3-story, 4,180 sq ft structure with a 5-bedroom apartment on the first floor and a 6-bedroom apartment on the second floor and on the third floor. Building loan documents filed with the county establish the construction costs to be $1.3 million.

If construction stays to schedule, the building should be completed in time for Cornell’s fall semester.

20150605_155847 20150605_155912 20150605_155919 20150605_155943 20150605_160037

114_catherine_rev4_1





202 Eddy Street Construction Update, 6/2015

9 06 2015

Work is progressing at 202 Eddy Street in Collegetown, where a reconstruction is underway to replace a historic building destroyed by fire in March 2014. Owner/developer Nick Lambrou announced plans to rebuild on the site shortly after the fire, with every intent of capturing the original home’s character. Being a part of the East Hill Historic District, the design of the replacement structure had to be approved by the Ithaca Landmarks Preservation Council (ILPC). After thorough review, the ILPC approved plans for a new 12-bedroom apartment building that completely replaces the fire-damaged building.

The new structure is a faithful interpretation of the original building, though it’s not an exact copy. An entrance door was repositioned, exterior emergency stairs will be internalized, and a chimney will not be rebuilt, but otherwise, its a close approximation of the original 19th century home. The architect is Ithaca-based Jagat Sharma, who has previous experience from the reconstruction of Sigma Pi’s house when it burnt down in 1995.

In these photos from Friday, most of the windows at least one of the doors have been fitted, and the exterior plywood is sheathed in Tyvek. The third floor, with its distinctive cupola, gives us a preview of the trim and siding – HardiePlank lap siding and half-round shingle siding, both in shades of green reminiscent of the original house, and “Arctic White” trim boards. Looking through the third floor window, there might be some drywall hanging underway, and judging from the first floor rough door opening, the interior lower floors may still be rough-ins phase.

202 Eddy is on the agenda this month by the ILPC; the council will conduct an inspection of materials just to make sure all is in good order, and as a prerequisite for issuing a Certificate of Appropriateness in July.

County records indicate the cost of construction is estimated at $750,000. Plans call for the new building to be completed and ready for occupancy by August, in time for the fall 2015 semester.

20150605_155608 20150605_155636 20150605_155702 20150605_155712

202_eddy





707 East Seneca Street Construction Update, 6/2015

8 06 2015

In and near the Collegetown neighborhood, several smaller construction projects are currently underway. One of those is 707 East Seneca, an urban infill project in the East Hill Historic District. Since the project was located in a historic district, the design had to go through the Ithaca Landmarks Preservation Council for approval, along with getting approval from the planning board, and the zoning board for an area variance (the lot was too small). After informational and voting meetings by different boards throughout the fall and winter, all the approvals were granted.

The design of the 3-story building is intended to be compatible with the historic homes from the late 1800s and early 1900s that surround the site. 707 East Seneca was originally the playground area for the now-closed East Hill School, and the lot was given to the city in 1982. The property fell into disuse, and the playground into disrepair.  The city voted to put the lot up for sale through the Ithaca Urban Renewal Agency (IURA) in summer 2014, and the vacant lot was sold for $130,000 last December. A building loan agreement filed with the county last Friday estimates the total “hard” construction cost for the building at $752,350. Hard construction costs leave out legal fees, permit fees, and other costs not directly related to construction.

When completed, the apartment building will have 6 units and 18 bedrooms. Four garage parking units will be located under the building and tucked into the hillside, in addition to five surface parking spaces. The building is expected to be completed before students return this August.

Note for the included renders, the black-and-white image with the small basement windows is the final design, but the colors are the same as the lead rendering.

In these photos taken last Friday, it appears that the building has been faced with plywood, topped out to its final storey and roofed. The exterior walls have been almost fully wrapped with Tyvek water barrier wrap. Some interior framing can be seen from the outside.

The design of the building is by Schickel Architecture of Ithaca, and the developer is Ithacan Todd Fox.

20150605_160815 20150605_160833 20150605_160902 20150605_160918 20150605_160932

707_E_Seneca_2

707_E_Seneca_rev1_1





News Tidbits 5/23: Cast A Discerning Eye

23 05 2015

1. Starting off this week’s round-up, here are some new renders of PPM Homes’s apartment project proposed for 215-221 West Spencer Street just south of downtown.

215-221_spencer_v2_1

215-221_spencer_v2_2

215-221_spencer_v2_3

Note that C & D are the same design, but mirrored. The general forms are pretty much the same as the original sketch plan, but the porch and windows have been altered and the rooflines have been tweaked on A and B to give the Spencer Street facade a little more visual interest.

The 12-unit, 4-building project is being described as a “pocket neighborhood”. The two upper buildings closest to West Cayuga will have three two-bedroom units here, and the lower buildings facing West Spencer have a combined four two-bedroom units and two three-bedroom units, for a total of 26 bedrooms in the project. 12 parking spaces are provided as required by zoning. The owner is looking into remote net-metering of an off-site solar panel installation to provide all of the project’s electricity needs. The site will launch into the formal planning board review process next month.

The steeply-sloped 0.47 acre parcel has been vacant for several years, and currently sees use as an informal 12-space parking lot. The property was originally marketed for affordable housing projects only, but received no purchase bids. Once the affordable stipulation was removed, the parcel was marketed once again, and Ed Cope bought the parcel for $110,000 on March 6th.

The building designs are the work of local architect Noah Demarest of STREAM Collaborative.

215-221_spencer_v2_4

Random aside, I just found out that PPM’s Ed Cope is a Cornell biologist. And here I thought writing this blog and being an air quality scientist was an interesting contrast.

2. There might have been a day in not-too-distant past where someone said, “You know what Ithaca needs? Mini-golf.” Apparently someone heard those wishes. the Town of Ithaca’s Planning Committee will be looking at a possible zoning modification down near the intersection of Elmira Road and Seven Mile Drive that would allow a mini-gold establishment to move forward.

Stretching my memory here a bit, I seem to recall a mini-golf place up by Trumansburg, but if my google search is any indication, it closed a couple of years ago. I suppose there’s a niche to be filled.

Now comes the question of, “Does this fit with the town’s new Comprehensive Plan?” Here’s the description the town proposes for the Inlet Valley Gateway, including the area in question:

The Inlet Valley Gateway district is intended to be a setting for a mix of office, small-scale retail, hospitality, and tourism and agritourism uses, with low-impact light industrial, artisanal industrial, and skilled trade uses.
The scale, architecture and landscaping of future development will need to be carefully designed and articulated.

This area should retain a semi-rural character, with deep setbacks from arterial streets, wide spacing between uses, landscaped front yards, and vehicle parking sited on the side and/or rear of structures. Shared curb cuts will reduce potential conflicts with highway traffic. Sidewalks should follow streets, with connections to adjacent areas planned for residential development. Architectural design, landscaping, and site planning regulations should apply to all uses in this area, including industrial uses. Agglomeration of mechanical commercial uses, and incremental expansion of commercial zoning resulting in strip commercial development, will be strongly discouraged.

It sounds like that if the site is designed right, it could be a good fit. Probably a better fit than the Maguire’s dealership/HQ plan that was shelved a few months ago.

20150516_141049 20150516_141110

3. Here’s a couple of photos of the new duplex being built at 514 Linn Street. Each unit will be 3 bedrooms, and the apartments will be completed this summer. The building is being built on the foundation of the previous home that existed on the site, which dated from the late 1800s and was a near-copy of the peach-colored house next door. 514 Linn is being developed by the Stavropoulos family, who run the State Street Diner.

texas_roadhouse_v3_1

4. In an effort to win over the city, Texas Roadhouse is tweaking their proposed restaurant off of S. Meadow/13. Latest render here. Members of the planning board have previously expressed concerns that the original design had the entrance facing northward into the parking lot rather than the street, and that not enough attention was being placed on the street-facing west side. If the render is any indicator, the modified proposal still has a primary entrance on the north side of the building, but the street-facing side has a handicapped entryway, and the landscaping has been spruced up. Dunno if it’s what the board quite wanted, but they’ll decide if it’s good enough during their meeting next week.

dryden_south_rev_1

5. Looks like Pat Kraft’s Dryden South project (205 Dryden) has a website up and running. The 10-unit, 40 bedroom project will start site clearing in a few weeks, with excavation/foundation work going through the summer (according to an interview conducted by the Sun, Kraft hopes to have structural steel rising by the time students get back in late August). The 6-story, 65′ building will house Kraftee’s on its first floor, with two units of four bedrooms each on each floor above. units will be available for rent starting next August.

Dryden_south_2009_sketch

A neat little detail from the site is this old conceptual sketch done by Jagat Sharma for the site. Note the April 2009 date at lower right; this project has been in the planning stages for years, even though it only hit the Planning Board last Spring. On a personal note, I’m glad this hulking box didn’t end up being the final design.

simeons_v2_1 simeons_v2_2

6. For those interested in what’s going on with Simeon’s, here’s an updated sketch design of the rebuild, courtesy of the Ithaca Landmarks Preservation Council (ILPC). The somewhat controversial side balcony/overhang is gone. About the only major difference between the original entrance and the rebuild is the location of the front door, which is now on the left (west) side instead of being in the center.

7.. Looks to be a quieter meeting for the planning board this month. No new sketch plans, and only one project, Texas Roadhouse, is being considered for approval. Here’s what’s up for discussion at Tuesday’s meeting:

IA. A minor subdivision to create a new home lot a 212 Hook Place on West Hill.

IB. A minor subdivision to divide a property on Hector Street on West Hill. The sisters applying for the subdivision are splitting the land among themselves but intend to keep both lots “Forever Wild”.

IIA. 210 Hancock gets its public hearing and possibly its Determination of Environmental Significance (which if okayed means that the project can be considered for prelim approval in June). I’m hearing there might be opposition mobilizing against the project. Given how transparent the whole design process has been, and that this is affordable housing in an urban area that struggles with housing costs, I’m going to be very, very disappointed if this happens.

B. Texas Roadhouse is up for Determination of Env. Signif. and possible Prelim/Final Site Plan Approval

C. Tompkins Financial’s new HQ will be reviewing parts of its Environmental Assessment Forms; no decisions expected

D. Declaration of Lead Agency (Planning Board agrees to conduct review) for the Maguire Fiat addition.

The board will also be conducting a review of State Environmental Quality Review (SEQR) forms used in determining environmental significance.





Boiceville Cottages Construction Update, 5/2015

20 05 2015

With three months filed away since my last trip out to the Boiceville Cottages, it seems like a good time for an update.

The pace of construction has picked up with the onset of the warm half of the year. The stucco homes with pea green timber trim have been completed. Three homes that were sheathed and had only a few windows fitted in February have progressed have now been fully fitted, stucco has been applied, and an attractive canary yellow timber trim is being attached to the new homes. Four more homes (stucco with teal timber trim) have started since last February, and these are not as far along – some of the red waterproof sheathing is still visible while the exterior finishes are being applied. Three concrete slab foundations, outlined with blue waterproofing (the covering might be for cement board being used to protect the slab insulation) are ready for new house construction in the near future. Suffice it to say, given the amount of disturbed land nearby, more slabs and more homes are a likely bet as we press on towards summer. So far, there looks to be at least 17 units completed during this calendar year.

A couple more community features have also been added – a small wooden footbridge now crosses the neck of the pond, and a simple, modern looking bus stop shelter has been built near the meeting house.

Boiceville is in the midst of a 75-unit expansion, which will bring the number of units on the property to 135. Most of the units are 1 and 2-bedroom cottages, built in clusters of three, although a few “gatehouse” rowhouses offer studios and 3-bedroom units. The initial 24 units were built from 1996-97, with another 36 units built in the late 2000s.

20150516_112107 20150516_112121 20150516_112214 20150516_112222 20150516_112226 20150516_112321 20150516_112326 20150516_112403 20150516_112416 20150516_112422 20150516_112526 20150516_113015

20150516_111920 20150516_111924 20150516_111928 20150516_112031 20150516_112107





Klarman Hall Construction Update, 5/2015

19 05 2015

Since the last update on Klarman Hall in February, the snow has melted and East Avenue has been reopened to all vehicular traffic. Construction firm Welliver has been pouring concrete on the upper floors and the structural steel has been erected. Concrete pre-cast has been installed on the atrium-facing portions of the top floor, with bright green glass-mat sheathing visible on some of the panels. Within these panels, the window cutouts are visible, and as seen in the last photo, windows have already been installed on the south block facing into what will be the atrium. Windows will be installed in the north block shortly. To hoist these panels into place, a telescopic crane is used.

Less visible to the outside observer, interior wall framing is underway on the upper levels, with utilities rough-in continuing, and some drywall installation underway in the more complete areas. Openings have been created in Goldwin Smith’s rotunda (where people will flow in and out of Klarman’s atrium), and the sub-slab (the concrete below the new floor) is being poured.

The long-term construction schedule calls for window glazing (exterior glass wall installation) and drywall to be complete by the end of June. The atrium skylight glazing will take place during the summer, the elevator will be installed by August, and the green roof will be prepared just as the fall semester kicks in. Klarman Hall will open its doors to the public in December if all goes to schedule.

The 33,250 sq ft building was designed by Koetter | Kim & Associates, and is named for billionaire hedge fund manager Seth Klarman ’79. The cost of the new building, which began construction in May 2013, is estimated at $61 million.

20150516_143414 20150516_143445 20150516_143458 20150516_143530 20150516_143603 20150516_143644 20150516_143702 20150516_143751

 





Gannett Health Center Construction Update, 5/2015

18 05 2015

Construction on the Gannett Health Center addition officially launched March 30th, and now that a couple of months have passed, visitors can see some real progress has been made at the site. The photos below were taken last Saturday.

Perhaps the most obvious visual impact is the plywood in the old window spaces, presumably for protection of occupants while work goes on only a few feet away.  The large machine against the southwest wall of Gannett is a pile driver, inserting poles into the soil to provide foundation support for the new building. More specifically, the poles are H piles, also known as bearing piles, which you can in the last photo on the left. The large metal tubes in the last photo are caisson pipes that will be socketed to the bedrock and filled with concrete. These are numbered and are going to be inserted right next to the existing building, according to the construction workers I spoke with at the gate. Feel free to ask the workers questions if they don’t have their hands full, most are more than happy to talk about their work.

Although the photo of the hole itself seems to have been accidentally deleted, the excavator on the west side of the site is being used to dig out a rather large, deep hole where further foundation work/pile driving will take place.

Construction at Gannett will be broken into phases – Phase I focuses on new construction, Phase II on renovation of the current building, and Phase III concludes the project with reconstruction of the Ho Plaza entrance. Phase I is expected to be complete by July 2016, and Phase II by August 2017. The whole project is expected to be complete by October 2017.

The building design is by local architecture firm Chiang O’Brien, with landscaping by Trowbridge Wolf Michaels Landscape Architects. There will be two additions to Gannett, a four-story, 55,000 square-foot building (which will use the H-piles seen below), and an additional 18,600 square foot addition that replaces the northeast side of the current building. The project also includes a new entrance and substantial renovations to the original 1950s structure (22,400 square feet of the existing 35,000), as well as landscaping, site amenities, and utilities improvements. The projected cost is $55 million.

The Gannett Health Center expansion has been a long time coming. Initial plans in the late 2000s called for a completely new building on site. HOLT Architects prepared a plan for a 119,000 square foot building, and an all-new building was also included in Cornell’s 2008 Master Plan. But once the Great Recession waged its battle on Cornell’s finances, the Gannett redevelopment was scaled back to its current form. According to a statement given by Gannett Director Dr. Janet Corson-Rikert to the Sun, the earlier plan had a budget of $133 million; the new addition and renovations are expected to cost $55 million.

The project is expected to create about 175 construction jobs and 40 permanent jobs (additional doctors, counselors and support personnel) when completed. Gannett currently employs 227, up from just 104 in 1996.

20150516_142534 20150516_142551 20150516_142606 20150516_142632 20150516_142643 20150516_142907

gannett5 gannett2