Simeon’s Reconstruction Update, 4/2016

28 04 2016

After the metal stud walls and fireproof gypsum board went up, it looks like another layer has been applied to the exterior. On portions of the structure that will be covered by brick, a closed-cell spray foam was used. Architect Jason Demarest provides a link to Goodale Construction of King Ferry on his Twitter account, so that might have been the subcontractor. Closed-cell spray foam, made with polyurethane and applied a few inches thick, provides insulation under the brick. On areas that will be covered by metal panels and details, Huber ZIP panels have been attached. Some of the original cast iron was salvaged after the accident and will be reused, but I haven’t seen anything that indicates if all the exterior trim will be cast iron, or if the exterior will be finished with metal panels that have a similar appearance.

Simeon’s, which is being built under a different contractor, is expected to reopen in June. Five apartments on the upper floors will hit the market later this year.

20160414_121110

20160414_121054

20160414_121009

20160414_120934

20160414_120426

20160414_120056

20160414_121141

simeons_v2_2





News Tidbits 4/26/16: Blips and Trends

23 04 2016

6-29-2014 162

1. In case you missed it, the Times’ Josh Brokaw did a pretty excellent feature this week on the Collegetown student rental market. He’s got Anagnost, Fane, Novarr, Lambrou…most of the major players have been covered.

A few details worth noting:
– The Avramis project planned for 302-306 College Avenue is being called “Avenue 102”.

– There have been rumors going around of a slight softening of the student rental market. No one’s really concerned about it, but the softening has been touched on, most recently at the city’s Rental Housing Advisory Commission meetings. In comparison to typical annual gains of +200 in the past decade, Cornell actually saw a slight decrease in the number of students in Ithaca from FA14 to FA15 (from 20,951 to 20,933), so the evidence is there. The key question is whether it’s a blip, or the start of a trend.

– Lambrou has a couple of smaller buildings (given previous work, 20-50 bedrooms) in the early planning stages. One of those might be 313-317 College Avenue talked about a while back.

If I do have any qualms with the piece, it’s that it implies Cornell’s West Campus was new housing. However, it was replacement housing for the U-Halls. There hasn’t been any net increase in beds on Cornell’s campus in fifteen years, since work on North Campus dorms finished in 2001.

2. In a separate piece, Brokaw mentions that 215 College Avenue, a 5,500 SF, 16-bedroom boarding house dating from the late 1800s, will likely come down after the 2016-2017 academic year. Readers might remember this property as the one that John Noarr paid an eye-popping $5.3 million for last August. 215 College Avenue falls under MU-1 zoning, which is Collegetown’s second-densest type of zone. MU-1 allows new buildings to be 5 stories and 70 feet tall (with a minimum of 3 stories and 30 feet), and no parking is required on site.

3. Last week, it was mentioned that Lifelong planned on selling the office building that it owned at 121 West Court Street in downtown Ithaca. Here’s the listing, which seems to be under the purview of local realtor Brent Katzmann. $439,000 gets you 4,518 SF in a former mid-19th century residence-cum-office. 8 offices, a conference room and amenities on the first level, and a three-bedroom, 2213 SF unit on the second level. The building lies just outside the DeWitt Park Historic District, although any imminent threats would probably send the city into panic mode and a rushed historic designation. Lifelong was gifted the building in 1996, and previously it was used as a doctor’s office. The county has the property assessed at $330k.

20160414_121932

108_E_state_1

4. A substitution for House of the Week – since there are apartments on the upper levels, it’s fair game. The “Old Cigar Factory” at 108-114 East State Street is undergoing first-floor renovation to its retail spaces. The revised storefronts will have granite bases, a new wood-framed cornice, and existing cast-iron elements will be repaired.

Historically, this was known by the less cancerous and more PC name of “the Grant Block” and “the Floros Block”, with the building dating back to 1851. The “Grant’s Coffee House” in the render is an interesting throwback, sharing the name with a shop that operated on the site in the early 1800s. At other times, the building served as a cigar maker (natch), confectionery. and the Normandie Restaurant in the 1940s and 1950s.

The old vestibules and entries have been removed and covered with plywood while interior work is underway. The project underwent Design Review in March. Ithaca’s John Snyder Architects is in charge of design.

519_elm_st_ext

5. A small note for the West Hill folks, local home-and-landowners are planning an 8-lot subdivision at 519 Elm Street Extension, just west of the city-town line. The owners, David and Sarah Locke Mountin, plan to subdivide four vacant parcels totaling 20 acres into six lots of 1-2 acres with access to Elm Street Extension, and 2 5-acre lots towards Coy Glen Road. The project will go to the town board because the Mountins are seeking exemption from public sewer for the two 5-acre properties. The land is zoned Medium-Density Residential, and marked as low-density residential in the 2014 Comprehensive Plan.

201_college_v2_3
6. A big, interesting agenda for the city Planning Board next week. Here’s the rundown.

1. Agenda review
2. Floor Privilege
3. Special Presentation the Brindley Street Bridge Replacement

4. Subdivision Review
A. Tax Parcel #20.-2-3.1 (N. Taylor Place between Campbell and Westwood Knoll, two single-family)
B. 511-13 Dryden Road (one single-family)
C. 312-314 Old Elmira Road (two duplexes).

5. Site Plan Review
A. Chain Works District, 620 South Aurora Street – Consideration of closing the public hearing for the DGEIS, and extending the public comment period. Currently, it’s expected to close May 10th.

B. Parking-lot expansion, 310 Taughannock (Island Health) – 17-space addition on part of the bio-retention area with porous pavement (13 spaces) and re-striping (4 spaces). Nearly the whole gamut here except sketch plan – Declaration of Lead Agency, Public Hearing, Determination of Environmental Significance, and Consideration of Preliminary & Final Approval.

C. Cherry Artspace, 102 Cherry Street- Consideration of Preliminary & Final Site Plan Approval with Conditions. Conditions being, Common Council has to sign off since the project is in the Waterfront TM-PUD.

D. 201 College Ave, Apartment Building – Project Update & Discussion. It doesn’t sound like any decisions are being made on Visum Development’s 5-story, 44-unit apartment building, which did sketch plan last month. With the stepped down corners and revised entrance, it seems most of the PB’s suggestions have been incorporated by architect Noah Demarest. Neil Golder will take a few verbal whacks at his potential neighbor, but it doesn’t seem like there are too many concerns with this project.

maplewood_site_plan_concept_v2

E. Maplewood Redevelopment Project, Veteran’s Avenue, Concurrence of Lead Agency – basically, this is the city agreeing that the town planning board will take charge on Cornell’s new mini-neighborhood. Makes sense, since 97% of the project is in the town.

F. SKETCH PLAN: 201-207 N. Aurora St. — Mixed-Use Project. So I’ve dedicated a little bit of ink to this one before, when Todd Fox, Charlie O’Connor and Bryan Warren purchased the property last July. This is CTB’s downtown location. The ILPC started discussing designated the block in late March, including 201-207 North Aurora, to which its owners were less than pleased. The building dates from 1901, but the June 1986 filing of the East Hill Historic District with the state says on page 2 that many Aurora Street buildings were substantially altered after their period of significance (1870-1920) and “no longer possess the level of integrity that characterizes the district”. So the ILPC’s approach here reads as more of a reactive thought process rather than a proactive one.

Regardless of whether or not the building’s historic, development here needs to be really sensitive to the neighbors, several of whom expressed great concerns in the week or so after the property was purchased. I spoke with Fox about it back in October after seeing the building listed on Modern Living Rentals’ webpage with 60 units coming in 2018, and he said that “we have planned to include the surrounding neighbors in an open discussion”. If I was a betting man, and given that Fox and O’Connor like to hire STREAM Collaborative to do their projects, I’d wager that they’re involved with this one as well.

I don’t think there’s any way to totally avoid controversy, but an overbuild like the Carey Building might be more palatable to the planning board and community than a complete tear-down and replacement. Zoning is CBD-60; 5 floors, no parking required, 60 feet max height. We’ll see how things look next week.

G. SKETCH PLAN: 107 Albany St. — Apartments. This is probably 107 South Albany Street, since the county occupies where 107 North would be located. Currently, the site is a two-story professional building, dating from the early 1900s as a house. In 2013, the property was rezoned as part of the State Street Corridor’s southern edge, increasing zoning to CBD-60 (once again, 5 floors, no parking required, 60 feet max height). In August 2015, it was picked up by the Stavropoulos family, who own the State Street Diner. They’ve done a couple other small apartment buildings, too small for Planning Board review – 514 Linn and 318-20 Pleasant Street offhand. Haven’t heard anything here, but once again, keep an eye out next week.

elm_street_1

H.    SKETCH PLAN: 203-209 Elm St. — Apartments, Demolition & Reconstruction. Also recently covered, 203-209 is a 12-unit affordable apartment building partially intended to replace deteriorated housing that has became un-rentable due to settling issues. It would replace a house, a 4-unit building, and a 9-unit building. All units would be 1-bedroom.

Originally, 301 East State, the Trebloc / State Street Triangle was on the agenda. Then it was pulled within hours.





The Chain Works District DGEIS, Part One: Introduction

20 04 2016

chain_works_rev3_3

Chain Works is, without a doubt, the single largest project currently being considered in the Ithaca area. It’s a very large project in terms of square footage, in terms of cost, in terms of length of build-out. Being such a large and important, it needs to be examined carefully – it could help propel Ithaca’s economy and ambitions to a higher quality of life, or it could serve as 95 acres of dead weight.

Between March 29th and May 10th, the city is receiving public comments on the Draft Generic Environmental Impact Statement, the DGEIS. The city’s website appears to be outdated, but the Chain Works District website is up to date – any comments readers might have, any questions or concerns, are submitted to the City of Ithaca Planning Board as lead agency for environmental review. UnChained Properties LLC, the developer, offers a blank form here, or if one prefers, comments can be sent directly to Ithaca senior planner Lisa Nicholas at lnicholas@cityofithaca.org.

What a DGEIS does is evaluate the potential impacts of growth on local resources and facilities, such as traffic, water supply systems, utilities infrastructure, social and aesthetic impacts. The DGEIS, which will need to be finalized, is part of New York State’s Enviromental Quality Review (SEQR, pronounced “seeker”) and a necessary precursor to any planned/contemplated construction and development of the site.

So, the DGEIS main body is 422 pages, with about 3 GB’s worth of appendices. Although 45 days is allotted for public comment, not a whole lot of people want to read through 422 pages, but the table of contents allows people to jump around if there’s one or two thing they’re more keen to read about. A link to the DGEIS is offered by project partner Fagan Engineers here, but you might need to submit an email and name before being able to see it.

chain-works-map

So, basic details, per the “Description of Action”:

Chain Works District Project is a proposed mixed-use development consisting of residential, office, commercial, retail, restaurant/café, warehousing/distribution, manufacturing, and open space within the existing 95-acre Site which traverses the City and Town of Ithaca’s municipal boundary . Completion of the Project is estimated to be over a seven-to-ten year period. The first phase, referred to henceforth as Phase I, will consist of redeveloping four buildings generally located at the northernmost and southernmost ends of the complex of existing buildings. These first four buildings are approximately 331,450 square-feet (SF), and will house office, a mix of office and residential, and industrial uses. Subsequent phases of development will be determined as the Project proceeds and will include new structures to complete a full build-out of 1,706,150 SF.

So, just based off that, anything that gets developed, is as the market and NYS Dept. of Environmental Conservation (DEC) allows. If the market isn’t amenable or the cleanup plan isn’t approved, don’t expect the plans to move forward all that fast, if at all. If the market is good and the DEC signs off on plans, expect the build-out to be on the shorter end of the 7-to-10 year time-scale.

chainworks-before-771x441

chainworks-after-771x441

Related infrastructure work for the Project will include: (1) removing select buildings to create courtyards and a network of open spaces and roads; (2) creating pedestrian, bicycle, and vehicular connections through the Site from South Hill to Downtown Ithaca; (3) improving the existing roads within the Site while creating new access points into the Site; (4) mitigating existing environmental impacts from historic uses; (5) fostering the development of a link, the Gateway Trail, to the Black Diamond Trail network; and (6) installing stormwater management facilities, lighting, utilities, and plantings.

No big surprises – some buildings in the interconnected complex will come down, shared road concepts will dominate the internal transportation system of the neighborhood, the site will be more fully integrated into South Hill and trails, and usual site details like stormwater plans and landscaping are going to be incorporated into the project.

Given its complexity, the project team is pretty broad – eleven organizations, from the Ithaca, Elmira, Corning and Rochester areas. Local firms include STREAM Collaborative, which helped draw up the design standards and rezoning, Randall + West for more rezoning work, and Brous Consulting, which is handling public outreach. UnChained Properties is headed by David Lubin of Horseheads (suburban Elmira). From what I’ve been told, project development to-date has cost somewhere around $2 million dollars.

Likewise on the approvals – the project will need something like fifteen approvals from a dozen different government groups and agencies.

chain_works_history

Let me share an introduction and summary comparable but maybe more approachable than theirs – a background primer on why this is happening can be found on the Voice in my introduction article here, and Mike Smith’s summary article here.

Much of Chain Works reuses what was once the Morse Chain / Emerson Power Transmission (EPT) factory, which employed thousands from the 1900s, up until the last workers were let go and the facility shut its doors in 2011. During the mid 20th century, industrial processes used chemicals and compounds that are known to be toxic – Trichloroethylene (TCE) being the best known, but also heavy metals and oils. These not only affect the site and its building, they’re also in the soil and groundwater of South Hill.

chain_works_contamination

The site is classified as Class 2 Superfund site, which the DEC describes as “a significant threat to public health and/or the environment and requiring action”. While EPT is responsible for clean-up, they’re only responsible for the bare minimum (the industrial standard, what can be safely exposed to for 8 hours) unless otherwise specified by a proposed reuse, in which case they have to clean to a higher standard like residential use.

So that leaves us at present – a vacant 95.93 acre, 800,000 SF industrial site split between municipalities and with varied terrain and conditions. One of the most basic goals of CWD is to get the city and town to rezone the land to allow a mix of uses – PUD/PDZ, which give flexibility in site development based off of standards the developer, the city/town, and in this case NYSDEC mutually agree to.

 

chain_works_form_districts_1

So, in the PUD/PDZ, one of the broad takeaways is that each of the four form code has its own design standards – height, width, window-spacing, setbacks and most physical details, even signage. Unlike typical zoning, it’s the appearance that is more thoroughly managed, not the use. Those can be found in detail here. The design standards utilize what’s called LEED ND (Neighborhood Development), design standards created for large-scale green, well-integrated and sustainable development. A gated community it ain’t.

The goal of these design standards is to mitigate some of the adverse impact the new and renovated buildings will have on the community – promoting alternate transit reduces traffic, limiting floors and floor heights reduces visual impacts, and so on.

Build-out falls under four general form zones: (1) CW1- Natural Sub-Area, 23.9 acres of old woodland to be limited to passive recreation. (2) CW2- Neighborhood General Sub-Area, 21.2 acres of townhouses, stacked flats and similar moderately-dense development, mostly in Ithaca town; (3) CW3- Neighborhood Center Sub-Area, 39.7 acres of mixed-use, in a combination of renovated and new buildings towards the northern end of the property in the city, and (4) CW4, Industrial Sub-Area, a 10.3 acre zone for industrial uses in existing buildings at the Emerson site. The site borders Route 96B, single-family and multi-family homes, natural areas and steep terrain.

About 0.91 acres will be subdivided off and maintained by Emerson for active groundwater treatment. The other 95.02 acres would be sold to UnChained Properties.

chain_works_form_districts_2

The re-development is fairly multifaceted. Some buildings will be renovated, a few will come down, a couple will receive additions, an quite a few others, like those in the all-residential CW2 zone, will be brand-new. Specifically in Phase One, four buildings – 21, 24, 33 and 34, will be renovated.

In Part Two, we’ll take a closer look at the neighborhood design standards and detailed plans for Phase One.

 

 

 





News Tidbits 4/16/16: The Real Estate Shopping Spree

16 04 2016

old_libe_thp_holt_v4

1. On Monday, the county’s Old Library Committee received an update from Travis Hyde Properties about the redevelopment. Perhaps the biggest development is that Lifelong is no longer moving into the building. Instead, they will sell keep their office at 119 W. Court Street, sell the historic building at 121 W. Court Street, and have free use of DeWitt House’s community room for classes and workshops. Lifelong would also be the administrator of the community room, so rental fees for use of the room by other organizations will be paid to Lifelong instead of Travis Hyde. Lifelong’s treasurer claims this arrangement will save them $50,000 vs. the original proposal.

According to the Ithaca Journal piece by Andrew Casler, law firms have expressed interest in the 121 West Court Street property, although other business and housing isn’t out of the question. 121 is just outside the DeWitt Park Historic District.

The number of units is down from 60 to 55 (though some of those are now 3-bedroom units…the Tines is reporting 57 units total), and parking spaces are down from 30 to 25, all internal to the building since Lifelong is no longer moving in. Frost Travis is quoted as saying he might be looking into expanding the age range of possible tenants (currently proposed as 55+), but that seems liable to garner significant blow-back from neighbors if pursued.

The current plan is to have approval by September, sale of the property by October, and after any final site plan approval tweaks, construction may begin next Spring.

20150727_145000

2. The Ithaca City PEDC had another crack at incentive zoning this past Wednesday. And the consensus is, everybody dislikes it for one reason for another. Some of the development community feels it doesn’t go far enough, while some local activists feels it goes way too far. Sounds like the plan is striking a good compromise if it’s ticking the stakeholders off for not being more like their way of thinking. But, proof would be in practice, and seeing if any developer would actually be interested in pursuing a plan that utilizes the incentive zoning.

On a related note, Svante Myrick deserve a laurel – when asked at the meeting why there’s a housing shortage in Ithaca, he pretty much nailed it – the growing economy, increasing student and retiree populations, and a renewed interest towards urban environments are driving demand higher than in decades past.

201_college_v2_3
3. For this week’s eye candy, here’s a perspective drawing of the multistory apartment building proposed at 201 College Avenue. One thing that stands out here that doesn’t in the elevations (the latest of which can be found here) is that the corners are stepped down, so the bulk of the building is lessened. The planning board is expected to agree to be the lead agency for environmental review at its April meeting.

4. So I’m mostly leaving this to my colleague and editor Jolene Almendarez, because she is much more familiar with the Elmira Savings Bank situation than I am. But it’s worth noting that Steven Wells, the Massachusetts man who sold ESB the properties, was on a buying spree this week. On Tuesday, Wells paid $224,000 for 508 West State Street (the old Felicia’s Atomic Lounge), $884,638 for 622 Cascadilla Street where Zaza’s is located, and $1.5 million for 402-410 Third Street, a commercial plaza home to Finger Lakes Physical Therapy.  Felicia’s was noted here on the blog when it went up for sale last August for $350k.

ith_big_plan_map_v2

They all have different owners, and they’re in varying physical conditions. The only thing that unites these three properties is all that are in areas the city as ripe for redevelopment for urban mixed-use in the Comprehensive Plan. Felicia’s was upzoned in June 2013 to CBD-60, permitting a 60-foot tall building, no parking required. 622 Cascadilla is WEDZ-1a, allowing for five floors and no off-street parking requirement. Lastly, 402-410 Third Street is B-4, 40′ max and 50% lot coverage, but allows virtually any kind of business outside of adult entertainment. Those are some of the city’s more accommodating zoning types, so we’ll see what happens moving forward. At the very least, the public relations game will be starting from behind the proverbial eight ball.

5. Out in Dryden, the William George Agency is seeking county legislature approval to issue $2.7 million in bonds to finance construction of a new 24-bed residence hall. The facility will affect about 1 acre, be about 15,000 square feet, and start construction this Spring, taking about one year to build.

As the county deems appropriate, they can approve the issuance of tax-exempt municipal bonds to finance construction projects. First the planning committee signs off on it, and then the general legislature takes it up for a vote. The non-profit residential treatment center secured a $2 million construction loan this past January to fund roof repairs and renovations to cafeteria area. The agency, established in the 1890s, employs over 340, making it one of the larger private employers in Tompkins County.





News Tidbits 4/9/16: A Slippery Situation

9 04 2016

maplewood_site_plan_concept

maplewood_site_plan_concept_v2

1. The town of Ithaca had their first substantive meeting about Cornell’s Maplewood Park Redevelopment, and later this month, the city of Ithaca will have their take on the 4.5% that sits within their boundaries (picture a line up Vine Street – that’s the city line). According to documents filed with the city, approvals from them will only be needed for one building. Application/SPR here, cover memo from Whitham Planning and Design here, Part I of the Full Environmental Assessment Form here, and narrative/drawings here.

From the SPR, the schedule as already been shifted slightly to an August 2018 completion rather than July – they also threw out a $3.67 million construction cost that doesn’t make much sense offhand. Edit: It looks like it’s just a basic estimate of 4.5% of the total project cost of $80 million.

The biggest change so far is a revision of the site plan. In response to community meetings, Cornell shifted smaller 2-3 story stacked flats and townhouses closer to the Belle Sherman Cottages, pulled back a couple of the larger apartment buildings, and added a new large apartment building to the southeast flank. Cornell has its goal of housing at least 850 in the redevelopment, so all design decisions revolve around accommodating those students with their families, while coming up with a design the community can live with.

The city will vote at its April meeting to defer Lead Agency to the Town of Ithaca, which will leave them with the ability to provide input, but the town board will be the ones voting on it.

2. It’s not often that a project gets undone by a single public commenter at a meeting. But the Journal’s Nick Reynolds got to experience such a momentous occasion at the town of Ithaca’s planning board meeting. He documents it on his Twitter account.

Someone that I didn’t cover because it wasn’t especially news-worthy is Cornell’s plan to replace the Peterson Parking Lot at the intersection of Tower and Judd Falls Roads with a cutting-edge 100% porous paved lot and a Cornell-created soil designed to promote rapid growth of trees in high traffic areas (a new island would be built in the middle of the lot). Basically, an eco-friendly, less-invasive parking lot, if there ever could be a thing.

Then Bruce Brittain, the Forest Home community historian, completely undid the plan with a contour map. Generations ago, the property was filled with debris and garbage, even old construction trucks. And while there may be a parking lot on it now, a porous lot, which would be heavier when watered, is liable to collapse right onto the Plantations below. Meaning, no porous lot, no green showcase. Back to the drawing board Cornell.

201_college_1

201_college_v2_1

3. Here’s a little more information on the 5-story, 44-unit/76-bedroom apartment proposal for 201 College Avenue. SPR Application here, FEAF here, project narrative here, BZA worksheet here, drawings here , letter of discontent from Neil Golder here. Looking at the drawings, there have been some slight revisions, mostly with the College Avenue entrance and the materials and fenestration at street level. The SPR gives us a $6 million construction cost, and a proposed construction time frame of July 2016 – August 2017. Units will be a mix of 1 to 4 bedrooms (24 1-BD, 12 2-BD, 4 3-BD, 4 4-BD). While the project falls into the Collegetown Form District, an area variance will be required for a front yard setback from College Avenue, which the board feels will help the street be more like a boulevard.

The city planning board is expected to Declare itself Lead Agency for environmental review at the April meeting. Developer Todd Fox hopes to have approval by the end of the June meeting. STREAM Collaborative is the project architect.

902_dryden_final

4. This week’s eye candy comes courtesy of Noah Demarest and Todd Fox (yes, they seem to be getting a lot of mentions this week). It had occurred to me that while an image of the revised 902 Dryden townhouses had been presented at the meeting where it was approved, the town never uploaded the copy. Noah and Todd were kind enough to send me a copy of the image presented at the meeting, and gave their permission to share it here. 8 new units, 26 new bedrooms. The duplex building in the middle already exists, but two new units will be built opposite a shared wall. Two three-unit clusters will be built on the east side of the parcel.

Cayuga-Meadows-Shot

5. It’s official as of March 28th. Construction permits have been issued for Conifer LLC’s 68-unit Cayuga Meadows project on West Hill in the town of Ithaca. Expect the first construction update, and a synopsis, when the first construction update comes around, which won’t be until mid-to-late May since West Hill projects get visits during odd-numbered months.

6. Just a couple minor city subdivisions to pass along. One, an application in outer Collegetown at 513-15 Dryden Road to separate the land into two parcels (513 and 515). The lot owner will then build himself a new house on the vacant lot. CR-1 Collegetown Form District, and it looks like no variances will be needed.

The other subdivision is on the city’s portion of West Hill. The property is a vacant lot that borders Westwood Knoll, Taylor Place and Campbell Avenue. The property owners, who live next door on Westwood, want to divide the vacant lot into two vacant lots to sell for single-family home construction. Once again, it looks like no zoning variances will be needed, just regulatory PB approval.

With the consolidation and realignment of 312-314 Spencer Road mentioned last week, this makes three subdivisions scheduled this month. That’s pretty unusual, as the city typically sees only one every 2 or 3 months on average.

7. Looks like someone made a tidy profit. Local landlord Ed Cope picked up 310 and 312 E. Buffalo Street for $885,000 on the 6th. 310 E. Buffalo is a 6-unit apartment building, 312 is a parking lot. The previous owner, a Philadelphia-based company, picked up the properties for $800,000 back in October 2014. So, $85,000 (+10.6%) for 18 months of ownership. The properties are part of the East Hill Historic District, where the Philly-based firm recently had a hell of an experience because the owners before them replaced the windows without notifying the city, and that was a big no-no as far as historic districts and the ILPC are concerned. They mandated the windows all be replaced with more historically-appropriate fittings. Hopefully that came up during the sales negotiations.

For what it’s worth, the parking lot is zoned R-3a – a 4 story building with 35% lot coverage. Since it’s in a historic district, a hypothetical proposal would likely look a lot like its neighbors.

11-24-2012 171

8. And another big sale this week, on Friday – the house at 210 Thurston sold for $2.5 million to the Alpha Chi Omega sorority. The house had been on the market since last November for $2.75 million. This actually sold relatively quick, given its large size and fairly unique nature. The seller purchased the property for $677,500 in December 2011, and renovated the property for use by the Cornell wrestling team.

Alpha Chi Omega has occupied the house at 509 Wyckoff Road for a number of years, but did not own the property – the owner, who picked up the property in 1971, is a business partner of Kimball Real Estate.

 





News Tidbits 4/2/16: The Walls Come Tumbling Down

2 04 2016

hotel_ithaca_final_1

1. Demolition and site prep work has begun for the Hotel Ithaca’s new 5-story addition. The work appears to be right on schedule, since a March construction start had been planned. The $9.5 million, 90-room project replaces a two-story wing of rooms built in the early 1970s. Hart Hotels of Buffalo hopes to have the new wing open for guests this fall. NH Architecture of Rochester is the firm designing the project, which received some “sweet burns” when it was first presented with cross-hatched panels and “LEED-certified stucco”. Eventually, the planning board and developer settled on a design after review, and the project was approved late last year.

For those who like to see walls a-tumblin’, the Journal’s Nick Reynolds has a short video of the demolition on his Twitter feed here.

2. Looks like there’s a little more information about the 16-unit “small house” subdivision planned in Varna. A Dryden town board document refers to the document as “Tiny Timbers”. Which is a name that has come up before – in STREAM Collaborative’s twitter feed.

https://twitter.com/streamcolab/status/673601010313641984

https://twitter.com/streamcolab/status/657329991827509248

Making an educated guess here, STREAM is working with landowner and businessman Nick Bellisario to develop the parcel. It would also explain the huge mounds of material that had been on the site as of late – compressing the very poor soil so that something could be build onto it, even if they’re merely “tiny timbers”. It doesn’t look like these are more than one or two rooms, with an open floor plan on the first floor and either a room or loft space above.

At first impression, these are a great idea – relatively modest sizes tend to be more environmentally sensitive, and with the subdivision, it’s likely they would be for-sale units with a comparatively modest price tag. On the other hand, tiny houses are something that a lot of local zoning laws don’t accommodate well (minimum lot size, minimum house size, septic), so that would be something to be mindful of as the project is fleshed out more and starts heading through the town’s approval processes.

201_college_1

3. Here’s some good news – the initial reception to Visum’s 201 College Avenue project was favorable. Josh Brokaw at the Times is reporting that apart from debates over a more distinctive roofline and setbacks from the street (which is more ZBA than Planning Board), the board was supportive of the project.

Meanwhile, as for something they were not in support of, the possibility of removing the aesthetic parts of site plan review as a benefit to affordable housing incentive zoning was not something that sat well with them. One thing that does get missed in the article, though, is that that benefit would only be in areas with form zoning guidelines for building appearance and siting (right now, that’s only Collegetown).

cma_2 cma_3

4. Never a fan of being scooped, but the Journal’s Nick Reynolds broke the news of a 3-story, 39,500 SF outpatient medical facility planned for Community Corners in Cayuga Heights. Owner/developer Tim Ciaschi (who also did the Lehigh Valley Condos on Inlet Island) will build-to-suit for Cayuga Medical Associates, with design work by HOLT Architects.

In most towns, this would be fairly cut and dry. But this is Cayuga Heights, which probably has the most stringent board in the county. The village routinely says no to anything that could draw students in (mostly housing, but historically it also included taverns and restaurants), and people prepare multi-page tirades against two-lot subdivisions, let alone what happens when a sorority tries to move in. In the project’s favor are its distance from homes and its modest densification of Community Corners, which the village has been slowly migrating towards in the past few years. The board’s raised concerns with not enough parking, so a traffic study was included with the March materials. We’ll see how this all plays out, a medical office building might work well with Cayuga Heights’ older population.

5. The city decided to take action on the owner of the Dennis-Newton House by fining him $5,000 for building code violations. Steven Centeno, who picked up the property from the Newtons in 1982, was initially charged with over 11,000 violations, and pleaded guilty to 35 counts. According to the city, Centeno was ordered to make repairs in 2012, and got the building permits, but never commenced with repair work. If he fails to bring the property up to compliance within six months, a further fine of $42,000 will be levied. This is not unlike the case last April where the city fined lawyer Aaron Pichel $5,000 for code violations on 102 East Court Street, the “Judd House”. Work on that property is underway.

maplewood_site_plan_concept

6. Likely to be some bureaucratic progress on the Maplewood Park redevelopment next week. The town of Ithaca will be looking at declaring itself Lead Agency for environmental review of the 500-600 unit project. designs and exact plans are still in the formative phases, so no new news on those quite yet. In order to build the new urbanist, form-based project as intended, Cornell will be seeking a Planned Unit Development (PUD), which will give them flexibility in how they can lay out the site. The portion in the city of Ithaca, the two buildings towards the northwest corner (boundary line goes down Vine Street), will be built as-of-right, and it looks like a sketch plan will be presented for the city’s portion during their April Planning Board meeting.

A FEAF is included in the meeting agenda, but since the project will have to undergo a Environmental Impact Statement (much more detailed than a FEAF), it’s not very descriptive.

341_coddington_1

341_coddington_3

7. Ugh. I give credit to the town of Ithaca’s planning board for trying to accommodate a solution where the 170-year old house could at least be moved to a different site. I’m disappointed in both the town of Ithaca’s Planning Committee (members of the town board) and the Iacovellis, neither of which seem to be devoting much thought to an amenable solution. The town’s planning committee chair is hell-bent on keeping students out, and the Iacovellis are now trying to rush the demo permit since they feel their livelihood is threatened. This is an unnecessary loss due to intransigence.





Collegetown Terrace Construction Update, 3/2016

26 03 2016

So there are really two sets of photos here. The first set contains photos that I’ve taken from outside the fence. The second set of photos are from inside the fence, and come courtesy of Nick Robertson and Jocelyn Garrison at Welliver, the general contractor in charge of the project. Their photos are much more visually telling than mine, and a big thanks goes out to them both.

Currently, work is focusing on drilling piles, and forming and pouring the foundation walls. In some sections, foundation walls are being formed. Concrete pours as liquid and dries into a hard solid; forms are a solid barrier (typically wood or durable plastic) that simply forces the concrete to dry in the shape it’s supposed to. After the concrete has been poured and dries into the desired shape, the forms are removed and moved down to the next section. Work on the foundation walls appears to be progressing from west to east along the excavated and pile-driven footprint for building 7.

If you look closely at the Welliver photos, you can see the steel wire mesh that will be embedded in the concrete and provide stability for the walls. The additional steps on the forms may have to do with stepping the foundation up along the slope of the site.

20160319_154015 20160319_154025 20160319_154036 20160319_154053 20160319_154416 20160319_154420 20160319_154432

Set two:

welliver_ctown_0316_1

welliver_ctown_0316_2

welliver_ctown_0316_3

welliver_ctown_0316_4





News Tidbits 3/26/16: Big Plans and Small Town Intrigue

26 03 2016

 

201_college_1

1. Starting with with the new project of the week. In case it was missed, the write-up for the new 5-story apartment building proposed for 201 College Avenue can be found here. 201 College is being proposed by Todd Fox under his new development entity, Visum Development Group; Modern Living Rentals will continue to exist as a rental property management company. Excluding perhaps a small question with where the average grade is to determine the 70′ max height, is looks like the proposal fits the MU-1 zoning; and apart from a couple of the usual grumblings against students and/or density, there isn’t likely to be too much of an issue with the proposal. Noah Demarest of STREAM Collaborative is responsible for the design, which will make be faced with colored metal panels.

On a related note, the Journal broke this before the Voice, and it appears they may have used to the city’s Site Plan Review pre-application as a source. That’s not online for public viewing; someone would have had to give it to them. Which seems a bit dodgy, given one of the goals of the now-mandatory pre-application is to offer initial thoughts to make sure a project is palatable, and to avoid another public controversy like State Street Triangle.

312_spencer

2. Meanwhile, the other partner in Modern Living Rentals, Charlie O’Connor, is pursuing a small project of his own on the other side of the city. O’Connor has submitted subdivision plans to merge two lots at 312 and 314 Spencer Road, and subdivide two legally-buildable lots from the merged property for a total of three, one of which will contain the existing houses. The new lots would be on vacant land behind the existing houses, which are currently owned by the Lucatellis (the same folks who ran Lucatelli’s next door). O’Connor would be purchasing the home and land pending approval of the subdivision. Each of the two new lots would then be developed into a 2-family home. Noah Demarest of STREAM Collaborative is handling the application. Drawings can be found here.

biggs_1

3. The Biggs Parcel will be put up for sale. As the county notes in its press release, the county administrator has been given permission to procure a realtor and market the property on the condition that any offers from the Indian Creek Neighborhood Association and/or the town of Ithaca be entertained (though not necessarily selected). The ICNA had offered some unknown amount for the property, which they have sought to keep undeveloped, but the offer was rejected. Previously, the site was the location of a proposed 58-unit affordable housing development, but the project was discontinued when more extensive wetlands were discovered on the property.

One of the big sticking points has been whether or not the 25.5 acres would be taxable – the county wants to sell to a private owner that will pay taxes, but proposals to preserve the land often dovetailed with plans to donate it to an organization like Finger Lakes Land Trust, which would render the property tax-exempt. The land had been valued at $340,000 before the discovery of the additional wetlands, and the reassessment value will become available on May 1st.

Realtors will apply to the county to list the parcel, and a realtor is expected to be chosen by the county by May 4th.


4. A large property in Trumansburg village noted for development potential has sold after being on the market for two and a half years. Local architect Claudia Brenner picked up the 19.27 acres in two adjacent parcels for $240,000 on the 22nd, about 25% off its original $300k asking price. 18.77 acres is registered to 46 South Street, the other 0.5 acres is a small L-shaped lot between 209 and 213 Pennsylvania Avenue. The previous owners used the property as cropland, and it had been in the same family since the 1940s.

In an email, Brenner said it’s too early to comment, but that future plans are being considered. The site has the village’s R-1 zoning, which allows home lots as small as 15,000 SF (~0.35 acres), and small scale multi-family residential and commercial services.

tfc_v2_1
5. Talk about big delays. Tompkins Financial will be pushing their $26.5 million project back a whole year, according to an interview a Cornell Sun staffer conducted with JoAnn Cornish, the city’s planning director. The project was supposed to start this quarter and be completed in Q1 2017. Now it will be completed in Q1 2018.

summit_danby_1

6. A few months ago, the Summit Enterprise Center proposal in Danby was described in one of the weekly news roundups. Docs filed by STREAM Collaborative’s Noah Demarest on behalf of owner David Hall call for modifications of a Planned Development Zone for the property at 297-303 Gunderman Road. Danby’s PDZ is not unlike the city’s PUD and town of Ithaca’s PDZ, where the form and layout is regulated rather than the use. The original PDZ for the property dates from the mid-1990s.

Well, after months of vociferous debate, the project has officially gone into bureaucratic Hell, complete with political turmoil and accusations a-flyin’. My colleague Mike Smith has the full story on the Voice. Rather than rehash Mike’s detailed explanation, let’s just leave it at this – Summit probably isn’t moving forward anytime soon.





Holiday Inn Express Construction Update, 3/2016

22 03 2016

Work on the new Holiday Inn Express at 371 Elmira Road is progressing. the foundation work is currently underway. It looks like they’re going with a shallow, slab-on-grade foundation that spreads the weight of a building all around the concrete slab. The formwork’s been done, and rebar criss-crosses the yet-to-be-poured concrete. The rebar mesh is a reinforcement for the concrete when it gets poured, helping to prevent cracks that may form in the concrete from spreading throughout the foundation and causing major damage. The blue tubes are a part of the under-slab utilities. Elsewhere on the site, it looks like stacks of Tembec and Millar Western Canadian lumber are being used to assemble wood trusses that will be used in the hotel’s wooden frame.

The 4-story, 79-room hotel is expected to open late this summer. Rudra Management and Rosewood Hotels (Jayesh Patel) of suburban Buffalo is the developer.

20160319_141548 20160319_141636 20160319_141959 20160319_142012 20160319_142018

holiday_inn_express_v2

holiday-inn-express-original-1





News Tidbits 3/19/16: A Taxing Problem

19 03 2016

20160109_115414

1. Apart from controversial presidential endorsement, Congressman Tom Reed paid a visit to the development community last week at the Boiceville Cottages project out in Caroline. According to Dan Veaner at the Lansing Star, the meeting was touted as an opportunity for developers, builders and contractors to express their concerns with onerous government procedures, specifically the local level.

Bruno Schickel, speaking at the event, noted that Boiceville could only have been done in Caroline because the 3,000 person town has no zoning (but they do have some type of commission that acts as a planning board). The lack of layers and conflicting comments from different interests allowed Schickel to get the latest 75-unit expansion approved in just two meetings back in 2012, something that he notes would have likely taken two years in other municipalities.

Then there’s this quote from another developer.

“After the site tour Reed spent time chatting with builders about regulations, mandates and costs that prevent some projects from ever being built.  One developer told Reed about an incident that killed a project before it even got started.

‘I tried to build a mixed use residential retail commercial building and I needed more residential units to make the economics work for lending,’ he said.  ‘I wanted six more apartments and the Town of Ithaca wanted an environmental impact statement.  the deal with these impact statements is that you pay an expert $20,000 so he can produce a 50 page report.  They look at it and read it and if they don’t like it they want to hire their own expert and they make the developer pay for it.  I backed out right away.  I pulled the plug and walked out of the meeting.'”

In case anyone was wondering, that was Evan Monkemeyer and his never built College Crossings project on the corner of 96 and East King Road. Which, to be honest, didn’t get re-approved because the window of opportunity closed as soon as the town updated its Comprehensive Plan and decided it wanted dense mixed-use. It’s an uncomfortable situation for all parties.

Obviously, there are two sides. Schickel is a very thoughtful and responsible builder/developer, but others may not be, which is why guidelines need to be in place. But, having watched the battles over affordable housing, and seeing the battles over wind and solar power now erupting in the western half of the county, it does give pause. I never thought I’d hear Black Oak investors such as County Legislator Dooley Kiefer and Caroline town board member Irene Weiser described like greedy Wall Street corporate villains, but that’s the current state of affairs. Using the same point from last week, the county can’t afford to be self-defeating, and having too many rules and regulations can keep a lot of good things, like green energy and affordable housing, from happening. The big, hotly-debated question is, where is the balance?

On a final note, the Star confirms that Schickel will finish build-out of the late Jack Jensen’s Farm Pond Circle project in Lansing, as soon as the Boiceville Cottages are finished later this year.

20151011_134147

2. It’s that time of the year for property re-assessment. The county gives a rundown of their process and goals for this year here. Most places handle assessment on the city/town/village level, so being that Tompkins County is solely responsible here makes it unique in the state.

tc_assessment_1

The report notes that high demand and low supply has kept sales prices on an uptick, and as those get factored into assessments, the values of property are due to go up as well. There aren’t as many sales as in the mid 2000s, but county home values are appreciating at an uncomfortably fast clip – median price went up 4.2% in just the past year, much greater than wage growth. The Voice has gotten some emails from people extremely upset that the county is doubling their land value, and there have been similar emails getting shared on neighborhood e-mail listserves, so there will probably be a story coming out on that soon.

Certain areas are facing certain challenges. For example, Collegetown’s land value is so high that it’s often worth more than the building that sits upon it, making much of the neighborhood a redevelopment target. Fall Creek is seeing home value appreciation much faster than the rest of the county, making it ground-zero for rapid gentrification. The county’s not pulling these values out of the ether; assessments are based in part on what people will pay for similar neighborhood properties. Fall Creek is walkable, centralized and a strong fit to the rustic, crunchy vibe buyers are often looking for in Ithaca. There are signs that the North Side and South Side neighborhoods are seeing similar impacts, but they’re not as noticeable because those neighborhoods were traditionally less well-off, so the gross home values aren’t as high, even if they’re appreciating at similar rates.

Out in the towns, the county feels Caroline is being under-assessed, which they hope to change in 2017, and there have been wildly high-priced sales in Ulysses that the county attributes to “excited” lakefront buyers. About the only area where the county is concerned about falling land values is Groton, where poorly-maintained properties are taking their toll on the tax base.

On the commercial end, Commons businesses and county hotels can expect a 5% assessment increase.

east_hill_master_plan

3. Looks like the town of Ithaca released their annual planning board summary. Only 15 new of modified proposals were reviewed in 2015, down from 27 in 2014, and 32 and 41 in 2012 and 2011 (2013 is excluded for some reason). Nevertheless, the town’s planning department has been busy trying to translate the 2014 Comprehensive Plan into form-based zoning code, at least some of which they hope to roll out this year. A couple sources seem to have taken to referring to it as the “Ithacode”.

Also in the pipeline – reviewing Maplewood (with the city as secondary), reviewing Chain Works (with the city as primary), and possibly, Cornell rolling out plans for East Hill Village (early design concept shown above), the first phases of which are expected to be unveiled within the next year.

902_dryden_v4_1

4. The townhouses at 902 Dryden Road in Varna have been approved. The Dryden town board voted 4-0 to approve the project at their meeting on the 17th. The 8 new units and 26 new bedrooms should begin construction this July and be completed by June 2017. Local company Modern Living Rentals will be developing the site, and the townhouses (no updated render, sorry) are being designed by STREAM Collaborative.

Also relevant to the Varna discussion, the planning department memo notes a pre-application meeting was held for a proposal to subdivide and build 16 “small homes” at the corner of Freese Road and Dryden Road currently owned by Dryden businessman Nick Bellisario. No other information is currently available about the project.

hughes_cornell_3

5. Let’s wrap this up with a look at the city of Ithaca Planning Board agenda next week. Quick reminder, the general order is: sketch plan, Declaration of Lead Agency, Public Hearing, Declaration of Environmental Significance, BZA if necessary, prelim approval, final approval. Here’s the formal rundown:

Site Plan Review
A. 210 Hancock – project update, no decisions
B. 424 Dryden, rear parking lot for 5 cars – prelim and final approval
C. Hughes Hall Renovations, Cornell University – Determination of Environmental Significance, prelim and final approval
D. Ag Quad Renovations, Cornell University – Determination of Environmental Significance, prelim and final approval
E. The Cherry Artspace, 102 Cherry St. – Declaration of Lead Agency and Public Hearing

F. Sketch Plan – 301 E. State Street, the Trebloc Building.

Don’t know if this is a continuation of State Street Triangle or something else (it would be a surprise if someone could create a new plan in such a short time), but we’ll find out on Tuesday. Zoning is CBD-120, meaning commercial or mixed-use, no parking required, up to 120 feet in height.

G. Sketch Plan – 201 College Avenue

201 College Avenue sits on the corner of College Avenue and Bool Street in inner Collegetown, and is presently occupied by a well-maintained though unremarkable 12-bedroom student apartment house owned by an LLC associated with the director of a local non-profit recreational center. The property is currently assessed at $545k. Zoning for the property is Collegetown MU-1, allowing for a 5-story, 70′ tall building with no on-site parking required. A quick check of neighboring properties indicates that the owner only owns this property, so whatever is planned will likely be limited to just this house.