Collegetown Terrace Construction Update, 3/2016

26 03 2016

So there are really two sets of photos here. The first set contains photos that I’ve taken from outside the fence. The second set of photos are from inside the fence, and come courtesy of Nick Robertson and Jocelyn Garrison at Welliver, the general contractor in charge of the project. Their photos are much more visually telling than mine, and a big thanks goes out to them both.

Currently, work is focusing on drilling piles, and forming and pouring the foundation walls. In some sections, foundation walls are being formed. Concrete pours as liquid and dries into a hard solid; forms are a solid barrier (typically wood or durable plastic) that simply forces the concrete to dry in the shape it’s supposed to. After the concrete has been poured and dries into the desired shape, the forms are removed and moved down to the next section. Work on the foundation walls appears to be progressing from west to east along the excavated and pile-driven footprint for building 7.

If you look closely at the Welliver photos, you can see the steel wire mesh that will be embedded in the concrete and provide stability for the walls. The additional steps on the forms may have to do with stepping the foundation up along the slope of the site.

20160319_154015 20160319_154025 20160319_154036 20160319_154053 20160319_154416 20160319_154420 20160319_154432

Set two:

welliver_ctown_0316_1

welliver_ctown_0316_2

welliver_ctown_0316_3

welliver_ctown_0316_4


Actions

Information

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s




%d bloggers like this: