210 Hancock Construction Update, 7/2016

28 07 2016

At the 210 Hancock property in Ithaca’s Northside neighborhood, site prep is taking place. The site is being graded and excavation is now underway for subsurface utilities installation (water and sewer pipes, the teal tubes stacked in the photos). INHS is conducting vibration monitoring while all this goes on, although the pile installation won’t start for another couple weeks, running foe about three weeks, mid-late August to mid September. Contractor Lecesse Construction will be installing 10-15 piles per day with a hydraulic hammer, between the hours of 8 AM and 4 PM. If the Voice’s Facebook inbox during the demolition phase this past spring was any indication, some very zealous neighbors will be providing breathless live coverage.

All in all, the contractor issue set INHS back about three months, but the grant funding is accommodating and rental agreements won’t be signed until the project is much closer to completion, late spring or summer 2017. For those who meet the affordable income brackets (breakdowns here), the rental interest form is here. The 54 apartments and the 5 rental townhomes should be ready to go by this time next year.

20160717_143140 20160717_143212 20160717_143239 20160717_143304 20160717_143318

20160717_143202

inhs_pride_design_v5_3 inhs_pride_design_v5_2 inhs_pride_v3_elevations_1

inhs_pride_design_v5_1





Maguire Fiat/Chrysler Addition Construction Update, 7/2016

26 07 2016

So this small project slipped under the radar. Back in April 2015, it was mentioned in a weekly news roundup that the Maguires were planning a 1,836 SF addition to their Fiat/Chrysler dealership on 13. Originally, the $360,000 project was slated to build out from September to December of 2015; and when things didn’t start, the assumption was things weren’t moving forward given their Waterfront plans, and that was that.

Well, the expansion is moving forward, albeit later than originally anticipated. The expansion consists of a 1-story, 1,017 SF entry area and showroom space for the Fiat dealership, and a 2-story, 836 SF addition for sales manager offices and a second-floor lunch room. Along with the building expansion, the parking and display lots are being reconfigured for an additional 20 display spaces, a revised entry drive, new landscaping, walkways and a bike rack. The project needed signage and front yard setback zoning variances, which were granted last summer.

At this point, the addition has been framed and sheathed, some with plywood/Tyvek and some with gypsum, which probably has to do with fire ratings. Windows have been fitted in some parts of the additions, while the future doors are currently occupied by plywood placeholders. The housewrap section will eventually be covered up with dark red aluminum panels and a large FIAT logo, while the rest of the addition will use grey panels.

Welliver is the general contractor for the project, and Schickel Architecture is in charge of design.

Personal aside, I had an uncle who was a Chrysler factory foreman back in the day, so there is a certain fondness attached to the old Pentastar logo. But the many mechanics in my family still have a strong aversion to Fiats, whose build quality in the ’70s and ’80s was less than par.

20160717_133832 20160717_133858
maguire_fiat_v2_1

maguire_fiat_v2_2





Brookdale Ithaca Crossings Construction Update, 7/2016

25 07 2016

Over at the Brookdale site on West Hill, work continues on the new transitional wing for the existing assisted living and specialized memory care facilities. The residential areas of the new wing have been framed out and roofed. Shingles have been attached and plywood has been attached, leaving rough openings for windows, doors and A/C units. Sheathing will follow (you can see a little Tyvek housewrap on the far end), and exterior materials will come along in due course.

The connector to the existing wings is not as far along; some exposed roof trusses can be seen, and some of the roof plywood has been installed but not tar papered and shingled.

The buildout appears to differ from the online plans slightly. The plans show standard rectilinear corners. The new wings have chamfered corners.

The 32-unit, 32-bedroom project is expected to open to new residents in the first quarter of 2017.

20160717_141559 20160717_141624 20160717_141658 20160717_141714 20160717_141722 20160717_141734

clarebridgecrossings_2 clarebridgecrossings_1





Holiday Inn Express Construction Update, 7/2016

21 07 2016

The Holiday Inn Express at 371 Elmira Road is looking more like the final product. From the back, you can see what the Exterior Insulation and Finish System (EIFS) installation process looks like – after the first moisture barrier comes insulation foam board, then comes the adhesive, fiberglass mesh, a base coat and the finish coat. On the north face, stone veneer is being installed on the first floor, and it looks like they’re doing the concrete and foundation work for the canopy and planters. The roof is still covered with temporary plastic sheeting, but will be finished with Isogard cover board, and a single-ply EPDM (synthetic rubber coating) finish. The 79-room hotel’s supposed to be open by late August, if the initial construction schedule is still correct.

20160717_132001 20160717_132050

eifs_plywood 20160717_133208 20160717_133231 20160717_133305 20160717_133337 20160717_133355

holiday-inn-express-original-1

20160717_133237





DiBella’s Construction Update, 7/2016

20 07 2016

I get a lot of questions about this one, probably because it’s in such a highly visible location. DiBella’s has made pretty good progress on their new 3,400 SF shop just north of the Ithaca Shopping Plaza on Route 13. The new building has been framed out and sheathed; the dark yellow coating is a spray foam used under brick to provide insulation, and create a protective barrier between the water-absorbing brick, and the layers underneath. The spray foam was also used for the Griffin Building (Simeon’s) reconstruction. Door and window fittings, brick-laying and exterior details will follow.

The inside still needs to be roughed out, it’s just the exposed frame at this point. But A&E Construction has made pretty quick work of it so far, and the dry spring and early summer have been useful from a construction standpoint. Things look to be on schedule for a late fall opening.
20160717_134332 20160717_134350 20160717_134407 20160717_134436 20160717_134508 20160717_134554

DiBellas-Ithaca-NY-rendering-large





Collegetown Terrace Construction Update, 7/2016

19 07 2016

Things are moving along steadily at the Collegetown Terrace site off East State Street. Building 7  snakes it way through the site, with work progressing from west to east. Furthest east, the concrete for the parking area is still being poured and cured.

A little further west towards the middle, the enclosed and finished parking area gives way to steel interior stud walls and unsheathed plywood, with only the lower floors in the middle section, but the steel stud walls and plywood have been built to the full height of the building (fully framed up) in the westernmost part.

The frame of a new skybridge has been installed between buildings 5 and 7, connecting near the elevator shaft/stairwell. Some Paradigm windows have already been fitted into the exterior. Eventually, the exterior will be sheathed, and then the exterior facade materials can be applied. It would honestly not be a surprise if the whole building is fully framed before the first snow flies.

Welliver‘s the general contractor for Novarr-Mackesey’s 247-unit project.
20160717_125557 20160717_125607 20160717_125617 20160717_125747 20160717_125756 20160717_125833 20160717_125838 20160717_125915 20160717_125952





Cayuga Meadows Construction Update, 7/2016

18 07 2016

Safe to say this is under construction. Work has commenced on Conifer LLC’s Cayuga Meadows affordable senior housing project on West Hill.

Cayuga Meadows is a 3-story, 58,500 SF apartment building with 68 units, 59 1-bedroom and 9 2-bedroom. The units will be available to individuals aged 55 and older, with incomes 60% or less or the Area Median Income (AMI). AMI in Tompkins County is about $53,000 per household, so a qualifying senior household would have an annual income of $31,800 or less. 7 units will be accessible to mobility-impaired individuals, and 3 units will be designed to accommodate hearing or visually-impaired occupants. Included in the plans are two covered patios, a community garden, and stormwater, lighting and landscaping improvements. 67 parking spaces will be paved behind the building.

The history of Cayuga Meadows goes back a few years, and has its share of twists. Originally, the project had been conceived as “Conifer West Hill” in 2009 as a component to a Cornell-led mixed-use development on about 36 acres of land across from Cayuga Medical Center. Rochester-based Conifer’s part in the plan has always been the same – affordable housing for seniors. But Cornell had other plans for the rest of the acreage.

In Spring 2010, there were three different site plans being floated – the consistent components were Conifer’s project, a 68-bed assisted living facility called “Terrace at Ithaca”, medical office space, small-scale retail, 106 park-and-ride spaces, and 4,000 SF for a farmer’s market. Depending on the plan, there were townhomes, a hotel school conference center, or other institutional space for Cornell. Mixed-use, definitely, but the plans weren’t that walkable, traditional neighborhood feel that the town is looking for these days – in fact, they were fairly conventional suburban sprawl. Cornell’s approach to planning was different in the late 2000s. By good fortune, Ithaca Builds locally hosted a copy of those site plans here.

For a combination of reasons (financial feasibility, changing priorities), Cornell ended up shelving its plans. However, it would be incorrect to say the university isn’t still interested in the site – they recently bought the house at 1250 Trumansburg Road, whose property had been awkwardly carved out of the rest of the site in a subdivision long ago. In the 2010 plans, Cornell had to plan around the house, not to mention worry about the occupants complaining about Cornell’s plans. So when it came on the market and sat for a couple months, the Big Red decided to pick it up in June for $157,000, probably on the belief that it could pay off through easier site planning and development down the line.

While Cornell filed away their plans, Conifer continued with theirs since the university was still willing to give them land as long as they built affordable housing. Originally, it was conceived as 72 units when it first received preliminary approval in April 2012, but was trimmed to 68 when final approval was granted in November 2013, in order to make the project a little less expensive, and provide a little more space to the community garden. Between preliminary and final approval, Conifer also had to apply for rezoning (Medium-Density Residential to Multiple Residence in May 2012), zoning variances (June 2012, for height and building setbacks), and public works approval for utilities services to be installed.

Then came another few years’ wait while financing was being secured. As covered on the Voice, affordable housing grants are very competitive, so it often takes multiple rounds of applications before a project is finally given grant money. In Conifer’s case, the last piece of the puzzle, tax-exempt bonds, didn’t come through until late January 2016. Cayuga Meadows is a $14.9 million project – about $8.3 million comes from NYS Housing Finance Agency bonds, and another $6.3 million from Community Development Block Grant (CDBG) funds. First Niagara Bank provided the Letter of Credit for the bonds. The project will pay taxes.

With the funding in hand, Cornell and Conifer formally agreed to a subdivision of Cornell’s land – 4.9 acres for the senior housing, and another acre for the Right-Of-Way for the new road. Cornell and Conifer had to agree on a few choices for new road names, which they submitted to Ithaca’s Codes Enforcement Director (Bruce Bates), who checks with the county to make sure there are no issues with the choices, and then the three parties agree on a final selection. Cayuga Meadows’ address will be “108 Aster Lane”.

There’s yet to be a color render hosted online, but the exterior will use fiber cement siding – Certainteed “Savannah Wicker” Dutch Lap Siding and “Cypress Spruce” cedar-like shingle siding. For the sake of examples, the Belle Sherman Cottages and Stone Quarry Apartments have also used Savannah Wicker fiber cement. The roof will be Timberline “Weathered Wood” shingles.

At the project site right now, work is underway on the foundation. The building’s footprint has been cleared, the foundation is excavated, and footers are poured for where the concrete will transfer the weight into the ground. Wooden forms are built along the perimeter for the stem walls, rebar is laid for reinforcement of the concrete, and the concrete is poured and left to harden (cured). Once the concrete has had a chance to harden, the forms are lifted off and work moves onto the next section. The building will be a slab-on-grade foundation, so no worries about excavating a basement here.

As a side note, it seems fitting that the residents with east-facing windows will have some pretty fantastic views of Cornell.

Through a joint venture with Conifer, LeChase Construction of Rochester will be serving as general contractor. The excavating has been subcontracted out to Neally-DeJong Excavating of Corning, and concrete work to Architectural Concrete Plus of Dundee (Yates County, northwest of Watkins Glen). Thanks to “Drill Deep” for the clarification.

20160717_140406 20160717_140444 20160717_140449 20160717_140528 20160717_140557 20160717_140612 20160717_140804 20160717_140815 20160717_140828

Cayuga-Meadows-Shot

Cayuga-Meadows-2





205 Dryden (Dryden South) Construction Update, 7/2016

11 07 2016

There were a lot more photos that did not make it into today’s Ithaca Voice piece. Developer and former Kraftee’s proprietor Patrick Kraft was kind enough to give a tour of the building as it goes through the furious final stretch of construction. On the outside, the decorative crown has been built out, and the housewrap and gypsum board will eventually be face with tan brick. On the inside, the lower the floor one is on, the further along the work is; a few brief descriptions are interspersed in the photos below.

Also, here’s some material from the interview with Kraft that didn’t make the final cut for the article. Definitely worth a read though.

Q: Are you concerned or excited about the Breazzano Center?

PK: Construction-wise, their impact is limited, they do their thing, we do ours. These [contractor] guys work together all the time. It hasn’t been much of a problem, our working relationship is pretty good. And Jagat [Sharma], he’s done a tremendous job, he’s a good guy. Jagat suggested doing a concrete building, and it turned out really well for us. These units are being furnished by Sam Peter, they met with Jagat, everything will match and be coordinated, even the lobby. Rich woods, the color scheme, stainless steel appliances, Most of the landlords around here are good guys, if I have a question they make time.

Q: During the 201 College debate, we saw a number of older residents express concerns about too much density in Collegetown, and too many students. Are the recent developments good or bad? What would you say to assuage the concerns of residents in Belle Sherman?

PK: I think there are a lot of positives to density, it centralizes the college students, and if you can do that, you get them out of the periphery, and higher density in the core could help get students out of Outer Collegetown and return homes to families and non-students. I have a friend who works at the Johnson, who lives just a block from Eddy Street. incoming faculty want walkability. People would have been incredulous ten years ago, but you know, people want to leave their car at home sometimes. I think that’s a good thing.
Q: With this new apartment building, have there been any issues or challenges? Or has everything been fairly smooth sailing?

PK: We’ve had our hiccups. The city does its inspections and has its variances, it’s not like we’re building a McDonald’s where every store looks alike. We haven’t had any major problems, just scheduling can be a major problem at times. I had to pay NYSEG to move the power lines, that was a 10-week delay.

20160630_125821 20160630_135113

According to Kraft, it was Jagat Sharma who insisted on reinforced concrete construction. This allowed the construction team to be flexible; handy for the structural tweaks (additional reinforcing) here in the light well, below the rough window openings. Kraft had nothing but praise for Sharma, even going as far as to say he gets an unfair rep because many of his buildings use CMU block in their exterior finish.

20160630_132859

Most of the sheetrock has been hung in the second floor units. Kraft also had a lot of compliments for LeChase, the general contractor. He noted occasional problems like a bad concrete pour (which LeChase redid at their own expense), but otherwise they’ve been doing good work and have adhered to the schedule quite well.

20160630_132824 20160630_132812 20160630_125850

Originally, there were small light shafts in the east face, but those were removed when the Breazzano Center was being finalized next door. The two buildings will stand just two inches apart.20160630_142231 20160630_142218

20160630_142206 20160630_142203 20160630_142145 20160630_143001 20160630_142619 20160630_142359 20160630_142304 20160630_142256 20160630_143423

Sixth floor, rear unit view – Kraft said it was favorite view.

20160630_143402

Doing work in the elevator shaft

20160630_143316

Steel interior stud walls on the sixth floor20160630_143310 20160630_143016

20160630_143946 20160630_143950

Framed closet spaces on the fourth floor20160630_144615

A tub fitting on the third floor

20160630_144929 20160630_145210

The brickwork on the backside is a little further along than the front, but the general appearances will be the same.

20160630_145213 20160630_145250 20160630_145359

Members of the construction crew in the first-floor commercial space.20160630_145512

The basement area, which will have a trash/recycling room, a tenant gym and storage.20160630_151521





St. Catherine of Siena Parish Center Construction Update, 7/2016

6 07 2016

This one’s a little tough to swing since it’s a jaunt from most of the other construction projects underway, but the drive over was worth the effort. St. Catherine of Siena Church in Northeast Ithaca is progressing with work on its new Parish Center.

The 8,878 SF, one-story building, vaguely in the shape of a cross, is being built to replace the existing one-story, 10,273 SF parish center, which was built in 1963 and designed by local architect Victor Bagnardi. Bagnardi also did Trinity Lutheran on Honness Lane, and the old county library a couple of years later. At over fifty years of age, with alterations, outdated interior layouts and with many of its mechanical and utility systems worn out and in need of replacement, the church opted to build a new structure rather than renovate the existing building. The centerpiece of the site, the 1961 church, was renovated in the late 2000s.

Plans originally approved in summer 2015 called for a 10,811 SF building with roughly the same overall shape and appearance as the building underway. However, that plan was trimmed down as a result of rising construction costs. An earlier plan by Ithaca architect Pamela Kingsbury was also shelved for similar reasons.

The project is expected to cost in the range of $3-$3.5 million, all of which must come from church funds and philanthropy. The Diocese of Rochester does allow bridge loans, but it does not allow any parish in its jurisdiction to carry long-term debt. A similar debt-free approach is also in place for the Al-Huda mosque planned on Graham Road in Lansing. Along with donations, St. Catherine of Siena used funds from a late pastor’s bequest, sale of land near its entrance, and leftover funds from previous budgets and campaigns to bring the construction project to fruition.

At this point, the foundation has been formed, poured and back-filled. Subsurface (under-slab) utilities, such as plumbing and electrical, have been laid for the new building. Framing should commence shortly.

Plans call for a late 2016 opening. Once the new parish center is occupied, the old parish center will be taken down and its footprint converted into new parking spaces to replace those lost to the construction of the new facility. The new center will be physically connected to the church, directly to the church’s west by about 40 feet.

Richard McElhiney Architects of New York City is the project architect. Local firms T.G. Miller PC (surveying/engineering work), Trowbridge Wolf Michaels Landscape Architects (landscaping), and TAITEM Engineering PC (rooftop solar panels) are also playing a role in the buildout.

20160703_150325 20160703_150510 20160703_150513 20160703_150530 20160703_150554 20160703_150558 20160703_150604 20160703_150640 20160703_150648

st_catherine_v2





Village Solars Construction Update, 6/2016

22 06 2016

For being such a large project, the Village Solars apartments in the town of Lansing tend to slip by unnoticed. Work on Phase 2 is wrapping up, and work has already begun on Phase 3, with what looks like excavation work for the foundation of Building “I”. A rolling stone gathers no moss, I guess. “I” will be an 18-unit apartment building similar in design to Building “G/H”, the building in the fourth photo, and currently the largest individual apartment building in the complex.

Building “D” is essentially complete and has been available for occupancy since May. Building “G/H”, which is just finishing up any remaining interior finishes and exterior trim, will be ready for occupancy this month. Building “E”, which is still attaching exterior trim and finishes, as well as interior work, will be ready for its tenants by about July 15th. If past work is any indicator, “I” will be ready for occupancy sometime next spring. No word on Phase 2A and Building “F”, but it’s a good bet 18-unit Building “J”, the other half of Phase 3, will commence excavation once “G/H” and/or “E” are complete.

With the completion of Phase 2 this summer, The Village Solars additions will have resulted in 77 new housing units since they began construction in 2014. Rents on the units are ranging from $850+/month for a one-bedroom, $1235+/month for a 2-bedroom and $1600-$1650/month for a 3-bedroom unit.

20160609_110626 20160609_110629 20160609_110634 20160609_110653 20160609_110715 20160609_110834 20160609_110913 20160609_111059 20160609_111202 20160609_111227 20160609_111246 20160609_111259 20160609_111351 20160609_111423 20160609_111445 20160609_111451 20160609_111629

village_solars_2 village_solars