Just putting up a few photos of the finished product.
Boiceville Cottages Construction Update, 7/2016
18 07 2016Comments : 4 Comments »
Tags: boiceville cottages, Caroline, general housing, tompkins county
Categories : general housing, Tompkins County
News Tidbits 7/9/16: Land Ho
9 07 20161. Starting off this week, a couple of new pieces regarding Ithaca’s waterfront. First, the city’s chances of picking up some prime waterfront real estate at a low, low price are gone, though not any fault of their own. Readers might recall that back in late May, the properties were about to be foreclosed on for unpaid taxes, and the county was discussing selling the parcels, worth over $630,000, to the city if the city paid off the $42,844 tax bill. Pretty sweet deal for the city, right?
But the owner, an LLC that has held the parcels since the late 1990s, managed to pay off the tax bill and an attached penalty fee, which means they get to keep the land. So, if the city had any plans for those parcels, they’ll be filing those away for a long while.
2. However, it looks like several properties are being put up for the sale in the city’s West End near the Waterfront. Local realtor Brent Katzmann has four properties listed – 321 N Fulton, a duplex on 0.11 acres for $144,800; 319 N Fulton, a single family on 0.04 acres for $109,875; 626 W Buffalo, a single family on a narrow and deep 0.15 acre lot, for $124,999; and 622 W Buffalo, a duplex on a narrow and deep 0.19 acre lot, for $134,800. The prices generally run at or up to 10% over the tax-assessed value ($130,000/$100,000/$125,000/$125,000). The currently owner is a Long Island-based LLC, led by a pair of New York City real estate lawyers, who acquired the properties from 2010-2012. Prior to them, many of the properties have been through a merry-go-round of owners over the past 10-15 years.
The properties are in fair to rough shape, and the marketing tactic being used isn’t renovation, but rather development potential. The four properties all fall within WEDZ-1a zoning, which is the city’s attempt at encouraging development on the West End. WEDZ-1a permits residential, commercial and mixed-use 2-5 story buildings, 90% lot coverage (100% if less than 50 feet on two sides – the Buffalo parcels and 319 N Fulton), and no parking requirement. The properties are not affected by the city’s TM-PUD.
The West Buffalo lots could be tough since the house in-between is owned by someone else, but deep lots and the corner of North Fulton and West Court offer some potential. Worth keeping an eye on, if only to see who they sell to.
3. One less homebuilder around. Avalon Homes is closing up shop. The Ithaca-based company is selling off its lots and trying to wrap up the homes they have underway. Rumors abound as to why, but if firm, verifiable information can be obtained, there will be more to follow.
Avalon made its name doing stick-built built, with a focus on affordability and green construction. Avalon, a certified Living Wage employer, was the general contractor for INHS’s Holly Creek townhomes (shown above), and employed at least a dozen back in 2010.
4. The Planning Board and the Ithaca Landmarks Preservation Commission will be conducting another joint meeting on Tuesday the 12th at 5:30 regarding the Travis Hyde Properties’ proposal for the Old Library. HOLT Architects responded to comments from the ILPC at its last meeting that the design needed to be “quiet” by submitting the revised elevations seen below.
Mission accomplished? Armchair architect comment here, but the revised design is too far the other way. There’s a joke about the color beige, coincidentally similar to the new brick, being an adjective for “dull, boring, indistinctive“. I like the previous design with its wood-like fiber cement and characterful roofline, and I wonder if perhaps a revised color palette of that design, with maybe a few less full-sized balconies, would be a happy medium.
5. As announced on city of Ithaca Mayor Svante Myrick’s Facebook page, the Namgyal Monastery Institute of Buddhist Studies will be the site of a library and museum of the Dalai Lamas, the first of its kind outside of Tibet. The facility would be located on the 28 acres Namgyal owns on South Hill at its Du Khor Choe Ling monastery complex. Architectural plans and costs are still being determined, but a quote from Ngawang Dhondup, administrator for Namgyal’s facility, says that it will be larger than Namgyal, which has been underway since 2007 and will be about 14,500 SF when completed.
All in all it’s a great feather in Ithaca’s cap, but two things to be a bit wary of moving forward are the reactions and possible opposition from neighbors to what will be a very high profile religious facility, and given geopolitical issues, the reception to the Library of the Dalai Lamas may not be so warm from some denizens of cosmopolitan Ithaca.
6. Way back in 2010 and early 2011, when the BJ’s Wholesale club was proposed in Lansing, one of the components of the proposal was to build 12 units of senior housing on land north of the then-proposed store. The project also called for wetlands, walking trails and a bird sanctuary on the undeveloped portion of the 11-acre property. Developer Eric Goetzmann (Arrowhead Ventures/Triax Group) faced considerable opposition to the plan since it involved big box retail and was housing outside of the density corridor, but after the IDA initially voted the project down in December 2010, a revised application calling for a smaller PILOT was passed by the IDA in April 2011 (some of the logic being that the county was in a financial bind during the recession, and some increase in taxable property was better than none).
Well, the BJ’s was built and opened the following year, but the wetlands and housing have had a much longer slog. The U.S. Army Corps of Engineers in in charge of new wetland permits, and the process is a complex, arduous one (man-made wetlands are difficult to build, and the Army Corps would rather they be done right than done fast). Goetzmann teamed up with The Upper Susquehanna Coalition and The Wetland Trust to design the “Inland Salt Marsh Bank”, which was just approved by the Army Corps, and the final permits expected shortly. With the wetlands taken care of, Arrowhead can begin to look towards the housing component, which they plan to put forward later this year for a 2017 construction date. As part of these plans, they want a one-year extension on the legal construction start for the housing from the IDA. Given that Arrowhead has met the other criteria and can demonstrate proof of progress on the wetlands, this probably won’t face much opposition. But eventually, it looks as if the village of Lansing will finally get those 12 units of senior housing.
7 It looks like the Biggs Parcel is officially listed for sale. Local realtor CJ DelVecchio was selected by the county to manage the listing for the 25.52 acres near Cayuga Medical Center. The asking price is $275,000. The land comes with a conservation easement on the northwest side due to its proximity to a stream, and the wetlands near the center would be tricky to work with, because wetlands typically can’t be developed unless new wetlands are created, which is not cheap or easy to do.
Readers might remember that this parcel has quite a history behind it. Declared surplus land by Tompkins County, the county had set up a tentative deal for a 58-unit affordable housing complex on the property, but the deal fell through after the wetlands were discovered to cover more area than previously thought.
Neighbors, via the Indian Creek Neighborhood Association (ICNA), have tried to force the county to hold onto the land to keep it from being developed. One of the big sticking points had been whether or not the 25.5 acres would be taxable – the county isn’t especially concerned at this point if the land gets developed or not, but they have made it clear that they want to sell it to a private owner that will pay taxes. The problem is, proposals to preserve the land often dovetailed with plans to donate it to an organization like Finger Lakes Land Trust, which would render the property tax-exempt. The ICNA did end up making a closed bid for the property, but the offer was rejected.
A neighbor to the south did propose reconfiguring the property to preserve the woods and build cottages on his back lot – by adding the Biggs land, he could have built more units under the regulations of the cluster zoning. But the plan fell through due to “size and complexity”, according to the ICNA’s Linda Grace-Kobas.
The land had been valued at $340,000 before the discovery of the additional wetlands, and the revised 2016 assessment brings that down to $240,000.
Comments : 3 Comments »
Tags: biggs parcel, ilpc, ithaca, lansing, news, old county library site, south hill, tcida, tompkins county, waterfront, west end
Categories : construction (planned), ithaca, news, senior housing, Tompkins County
News Tidbits 7/2/16: Not the (City Centre) of Attention
2 07 2016
1. Let’s start this off with the big news of the week – the proposal for 201 College Avenue was approved by the Planning Board. The debate was spirited, to put it most politely; catty, to use the official write-up in the Voice; and in the follow-up phone call I had with my editor, who attended the meeting with a Voice summer intern, she described it by saying “both sides were pretty awful”. I am sympathetic to Neil’s predicament, although I think it’s also a fairly unique case; I hope some sort of arrangement with the solar panels is worked out.
The observations regarding age and view of the project is actually pretty similar to a conversation the Journal’s Nick Reynolds and I had on Twitter about the City Centre project – older Ithacans often have starkly different views on density and urban development than younger residents, who tend to be more pro-density and pro-urban infill/growth. The young aren’t naive and more so than the old are obsolete; but they are products of different times. Today’s older Ithacans are the same ones who were frowned upon by the old Ithacans of their youth (the Silent Generation and the Greatest Generation), who were much more politically conservative and made up the large majority of the city’s Republicans from when Ithaca was once a contested city, and the Boomers were moving in and tilting it leftward. A sociologist could probably make a good research paper studying Ithaca’s generational views of urban environments.
Anyway, construction on this project is supposed to start in short order; funding has already been secured, and Binghamton-based W. H. Lane Inc. will be the general contractor for the $6 million project.

2. Meanwhile, City Centre’s sketch plan was also reviewed at the Planning Board meeting. The initial reaction seems muted, gauging from Nick Reynolds’ Twitter and the lack of comment from my Voice colleagues.
According to the sketch plan submission, the vast majority of units (240 of the 255) will be studios (120) ranging from 457-563 SF, and one-bedrooms (120) ranging from 580-754 SF. The other 15 will be two-bedroom units, eight 914 SF units and seven 1,370 SF units. All units are market-rate, with target demographics including young professionals and downsizing empty nesters. Students are allowed, though the units won’t be marketed to them. Ground floor retail will be 10,700 SF at the corner of State and Aurora. 7,220 SF fronting State Street will be “Leasing/Club Space” for building and tenant functions. The 71-space parking garage will be accessed via East Green Street, car share membership will be included in the rent, and there will be indoor bike racks.
With the mild initial reaction noted, we’ll see how the project details shape up as the summer progresses, and the board potentially launches formal project review (Declaration of Lead Agency) as soon as late July.
3. Hitting the market this week is a potential opportunity for the deep-pocketed investor/developer. The property is 2248 North Triphammer Road in the village of Lansing. The sale consists of two parcels totaling 3.42 acres – a 1.53 acre parcel with a 2,728 SF M&T Bank branch built in 1992 and holding a long-term triple-net (NNN) lease; the other, an undeveloped 1.89 acre parcel to the rear that the listing notes could be developed out into 13 housing units. The price for the pair is $2,125,000.
A triple-net lease means the tenant pays everything – insurance, maintenance and real estate taxes (formally, net insurance, net maitenance and net real estate taxes on the leased asset – the three nets). Because of this, the rent is substantially lower than it otherwise might be. There are certain cases where a landowner might want to do triple-net – like when they’re a tax-exempt entity leasing out to a for-profit company. A quick check of the records shows the properties are owned by Cornell, and were acquired in 1953 and 1960. What the property has been to Cornell is a fairly safe investment (though with a lot of fine print to determine who pays for things like if a tornado hits or the foundation cracks), generating a modest amount of rent and functioning like an inflation-protected bond, but guaranteed by the lessee rather than the government. All the better when the tenant is stable and signed on for the long-term, as is the case here.
The county has the bank parcel assessed at $635,000, the undeveloped parcel at $140,000. Lansing village zoning has Commercial High Traffic for the bank property, and High Density Residential for the vacant parcel. HDR zoning requires 6,000 SF of land per dwelling unit in a 35′ tall multi-unit building, and 1.89 acres = 82,215 SF, so that’s where the 13 units comes from. For comparison’s sake, single family is 12,000 SF, and duplexes 15,000 SF (or, doing the math, one could in theory carve out six home lots, or 5 duplex lots for 10 units, though with lot setbacks, the property’s triangular shape probably lowers those figures).
4. On the other end of the sales process, the former Maine’s supermarket has been sold. The six year-old, 26,146 SF building at 100 Commercial Avenue in the city of Ithaca was purchased for $4,150,000 on Thursday the 30th, by Illinois-based Agracel Inc., well above its $3.1 million assessment. Agracel is an industrial space and warehouse developer, fitting for a property once described as a “food and party warehouse”. The former Maine’s appears to be a little on the small side compared to the rest of their portfolio, but there is the possibility of expansion, or even a teardown and rebuild if they really felt the need.
Readers may recall that Maine’s closed its Ithaca store in February, which along with a closing in suburban Rochester reduced its stores from six to four.

5. Work on the new Storage Squad facility has begun on the 1400 Block of Dryden Road east of Varna. Right now, the focus is on site clearing; the house was used by local fire departments for training exercises, and will come down in a controlled burn later this summer. The 79,000 SF storage facility should be ready for use by February 2017. One full time and a few part-time jobs will be created.
And for the record, I think that’s my middle finger.
6. So this is curious. The city recently uploaded a couple of older documents detailing development plans off of Floral Avenue on the southern tip of Ithaca’s West Hill neighborhood.
The first dates from Febraury 1992, and is a filing to create a 27-lot cluster subdivision on 4.15 acres at 452 Floral Avenue. The paperwork indicates that the intent was affordable housing, by a company named House Craft Builders. The city’s then-Planning Director, H. Matthys Van Cort, wrote a recommendation for negative declaration of environmental significance, and the project was approved in June 1992, but it never moved forward, and 452 remains vacant land today. It appears House Craft was dissolved in 2012; the officer was an architect for Ecovillage who has since retired and moved out of state.
The second is a subdivision requested by INHS in 1987. The filing requested 236 Floral Road be split into two parcels, with the intent of renovating a decrepit 236 into a for-sale affordable single-family home, and build a new house on 224. This was approved, and eventually, 236 was renovated and transferred to its owner in 1996, and 224 was built in 1994.
Now, as interesting as this all is, the city doesn’t upload decades-old subdivision files just to amuse nerds. The $64,000 question is, why were they uploaded now?
Comments : 2 Comments »
Tags: 201 college, 201 college avenue, affordable housing, City Centre, collegetown, Cornell, downtown ithaca, dryden, general housing, industrial, lansing, student housing, suburbia, warehouse, west hill
Categories : affordable housing, collegetown, construction (planned), Cornell, general housing, ithaca, news, student housing, Tompkins County
News tidbits 6/26/16: The Odd Time Out
26 06 20161. In what was ostensibly the biggest news of the week, Newman Development Group (NDG) of Vestal announced plans for the Trebloc site in downtown Ithaca. “City Centre” includes nine floors total, with roughly 250 apartments from studios to 2-bedrooms, about 10,000 SF (square feet) of retail space, 3,200 SF of amenities like a business center, and an underground garage of 70 spaces (the site is zoned CBD-120, which has no parking requirement). Readers might recall that Texas-based student housing developer Campus Advantage had proposed the State Street Triangle project, but their purchase option was not renewed by the owner of Trebloc.
Looking at their portfolio, Ithaca is NDG’s odd market out – most of their projects involve suburban retail centers and chain hotels, with shopping plazas from coast to coast. A smaller division, NDG Student Living, focuses on acquiring and building student housing, with their most recent projects in Binghamton and Oneonta. Ithaca seems to be the only metro where they’ve built general housing; earlier this decade, they worked with local businessman Bryan Warren on the Seneca Way mixed-use project on the east end of downtown.
The gut reaction to Newman as a developer is that, although they’re not very accustomed to urban mixed-use, there is one market where they do know what they’re doing, and that would be Ithaca’s.
Let’s just start right off the bat with one big difference between NDG and CA – the way the news was broken. CA was caught off-guard when the Journal’s David Hill broke the news of a 120-foot building a few days before the Planning Board meeting. NDG, working with local consultant Scott Whitham, emailed the same press release to each of the three major news organizations in Ithaca, which gave them the upper hand on the way information was delivered. The Times ran their copy first with almost no additional details, the Voice came a little later in the afternoon with more details such as unit total and retail space, and the Journal’s version came in the evening with even more details, such as the 70-space underground garage, and plans for the project to pursue CIITAP, the city’s property tax abatement program.
We’ll see what happens next week. The garage, not removing the turn lane, the general housing focus as opposed to students, and an initial design by Humphreys and Partners Architects that doesn’t repulse people are all cards that NDG holds that CA didn’t. But, there will still be sizable opposition. Playing your cards correctly is just as important to a winning hand as having them.
2. It looks like Gimme! Coffee is percolating something new out in Trumansburg. Through an LLC, the local coffee chain picked up 25-27 West Main Street for $350,000 on the 20th. The building is the former Independent Order of Odd Fellows Temple, a fraternal organization which established a chapter in Trumansburg in 1839, with ties to an older fraternal organization going further back to 1818. The 19th century temple is now about 1,700 SF of retail space, and 3 apartments totaling 3,300 SF on the upper floors; recent tenants have included Life’s So Sweet Chocolates and a barber shop.
Ithaca also had a location, first in downtown, and then on West Hill from the late 1920s. The older location was demolished to build the county library in the 1960s, while the West Hill location is a mix of uses today, one of which is the Museum of the Earth.
Gimme! has had a 1,200 SF shop at nearby 7 East Main Street since 2002, but they rent the space from Interlaken businessman Ben Guthrie. Logical guess here would be, they like Trumansburg, they wanted to buy a space and stay near where they are now, this opportunity came up down the street and they went for it. The sale price on 25-27 W Main is a substantial climb from the $288,000 it sold for in June 2010; I guess they call Trumansburg “little Ithaca” for a reason.
3. So, documents filed with the 201 College project this week were quite intriguing. First off, no action was taken at the zoning board meeting, but the developer of 201 College modified the project so that it no longer needs the setback variance or the entryways design variance. The planters were shrunk down in order to keep the sidewalk 12′ wide as requested by the Planning Board. Some additional 3-D drawings were also sent along, and site elevations and utilities plan here.
One of the images sent along was a “future context” file of potential nearby projects in the next couple of years. This document likely stems from the Planning Board debate of just what is likely to get developed in the vicinity over the next 5 years or so. There are four massings, merely following what zoning allows.
302-306 College Avenue – “Avenue 302”, by the Avramis family. Two buildings, one of six floors, one four, possibly in the 2017-2019 timeframe. Nothing formal has been discussed since the 2014 sketch plan, but the houses currently there are leased through May 2017.
215 College Avenue – A Novarr project. All that is publicly known at this stage is that Novarr wants to start construction in Summer 2017. Zoning allows 5 floors.
202 College Avenue – 202, 204, 206 and 210 College Avenue are all Novarr properties (there is no 208), as is the adjacent 118 Cook Street, which is not included in the massing outline. The College Avenue parcels allow 5 floors, 118 Cook 4. There hasn’t been any news with these properties lately.
119-125 College Avenue – three houses (there is no 123) owned by an Endicott-based landlord. I had to put out some inquiries on these houses, and there may be a sale in the works, although nothing’s on file with the county yet. These are CR-4, allowing 4 floors, but they could be tough to redevelop because these houses are seen as potentially historic resources.
Anyway, a vote on the project’s approvals is set for Tuesday. Neil Golder has created a group called “Save the Soul of Collegetown” to stage a rally in front of city hall that evening and try and halt the plans, but the last I checked on Facebook, three of the five people going were reporters.

4. Going more into briefs now, the Amici House funding plan for building a housing facility for 23 at-risk youth, and a second structure for five head-start classrooms and 42 students, was approved by the county this week. Once the sale is finalized, expect the official plans to be presented to city officials not long thereafter. Once those are approved, additional grant applications can be filed and hopefully, construction will be completed no later than 2018. According to the county’s press release, the Amici plan will create about 25 living wage jobs.
5. Starting on the 27th, Gannett Health Services will begin to transition over to the new addition, while work begins on renovating the older wings of Cornell’s healthcare facility. This marks the rough completion of phase one, and the halfway point for the $55 million project. The Gannett webpage says the whole facility will be known as “Cornell Health” upon completion.
6. Back in November, Ithaca’s second ward saw a competitive election between candidates Ducson Nguyen and Sean Gannon. One of the big differences between the two was on development – Nguyen advocated for urban development in downtown, and Gannon thought there was too much building going on and it needed to be slowed down. Nguyen won by a hefty margin on election night.
A building loan agreement was inked next week to build a new duplex (two-unit semi-detached house) behind an existing property at 512-514 West Green Street. $330,000, Ithaca’s Carina Construction will be the contractor (expect a Simplex modular duplex). The property is bisected by zoning, with the rear falling into the State Street development corridor, so no parking is required for the new rear duplex. At a glance, it looks like a winning plan – it will be modest-sized, it’s in a walkable area, and it supplies much-needed housing. The Ciaschi family is developing the units.
The property also happens to be next door to Mr. Gannon. I’m sure he will be all kinds of amused.
Comments : Leave a Comment »
Tags: 201 college, 201 college avenue, 215 college avenue, 302-306 college avenue, amici house, City Centre, collegetown, Cornell, downtown ithaca, gannett, gannett health center, ithaca, Southside, tompkins county, trumansburg
Categories : affordable housing, collegetown, construction (planned), Cornell, general housing, ithaca, student housing, Tompkins County
Village Solars Construction Update, 6/2016
22 06 2016For being such a large project, the Village Solars apartments in the town of Lansing tend to slip by unnoticed. Work on Phase 2 is wrapping up, and work has already begun on Phase 3, with what looks like excavation work for the foundation of Building “I”. A rolling stone gathers no moss, I guess. “I” will be an 18-unit apartment building similar in design to Building “G/H”, the building in the fourth photo, and currently the largest individual apartment building in the complex.
Building “D” is essentially complete and has been available for occupancy since May. Building “G/H”, which is just finishing up any remaining interior finishes and exterior trim, will be ready for occupancy this month. Building “E”, which is still attaching exterior trim and finishes, as well as interior work, will be ready for its tenants by about July 15th. If past work is any indicator, “I” will be ready for occupancy sometime next spring. No word on Phase 2A and Building “F”, but it’s a good bet 18-unit Building “J”, the other half of Phase 3, will commence excavation once “G/H” and/or “E” are complete.
With the completion of Phase 2 this summer, The Village Solars additions will have resulted in 77 new housing units since they began construction in 2014. Rents on the units are ranging from $850+/month for a one-bedroom, $1235+/month for a 2-bedroom and $1600-$1650/month for a 3-bedroom unit.
Comments : 5 Comments »
Tags: construction, construction (planned), general housing, lansing, tompkins county, village solars
Categories : construction, construction (planned), general housing, photos, Tompkins County
News Tidbits 6/18/16: Wit Fails Me After Eight Years
18 06 2016

1. Let’s start off with a brief update on 201 College Avenue. My colleague Mike Smith at the Voice did an encompassing article on the topic late last Friday, and there have been a couple more modest developments as of late. Apart from the multi-million dollar sale mentioned last week, the city’s Design Review Committee also gave their input on the project. They said they like the current form of thje building’s front (west) entrance, because it calls forth elements of Grandview House a few doors down. they also recommended darker or neutral grey colors to minimize the appearance of the fifth floor, more windows along College Avenue, warm accent colors, and tweaks to the window and cladding scheme. The resulting revisions were incorporated into the latest building design seen above, and for which additional images, material samples sheet and interior plans can be found here. The project will be discussed at the Project Review meeting next week, and the official Planning Board meeting Tuesday 6/28, at which the public hearing will be held, and consideration of preliminary approval.
2. Speaking of design review, 107 South Albany also went through the committee this week. Recommendations included projecting window sills, stucco all the way back to the rear balconies, and noting on docs that the large sign on the existing building would be removed during the renovation. Site Plan Review app here, drawings here, Full Environmental Assessment Form (FEAF) here, planting plan here.
The renovation and addition seems like a good example of re-use in a corridor that the city is targeting for new investment. It preserves the century-old structure and adds housing in such a way that, by location and design, doesn’t have a significant visual impact. By zoning, Nick Stavropoulos could have sought five floors if he wanted. This plan will be going through the whole shebang at the June meeting – Declaration of Lead Agency, Public Hearing, Determination of environmental Significance, and Prelim and Final Approval.
Among other things to be discussed at Project Review and the Planning Board meetings – Prelim/Final Approval for 602 West State Street (the Elmira Savings Bank project), signage for Collegetown Crossing, and a few minor zoning variances. New sketch plans, if any, will be announced on the PB Agenda next week.
3. This week in big sales – someone plunked down $680,000 on a house at 107 Catherine Street in Collegetown. I say somebody because they conducted the purchase through an LLC (aptly named “105-107 Catherine Street LLC”) registered by a local law firm last summer. Just like the Maguire purchase of the Carpenter Circle land, this effectively hides the buyer from public view. The same purchase bought 105 Catherine for $780,000 last November. It looks like 105 has 10 bedrooms and 107 has 7 bedrooms, based off assessment docs.
105 and 107 Catherine make up the edge of the CR-4 Form District. By zoning, an applicant could build up to four floors, no parking required. A development plan would likely consolidate lots. Something to keep an eye on. Collegetown is getting to be a very expensive place.
4. Meanwhile, here’s something that’s just hitting the market. For the budding landlords, 306 North Cayuga is up for sale. The “C. R. Williams House” was built in 1898 (interior/exterior photos from the early 1980s here). The current owner, Jeff Kalnitz, picked it up for $300k in 1997, had it on and off the market a couple of times, and then decided to do a thorough ILPC-approved renovation. The 12,500 SF property, which holds six high-end apartments and approvals for a seventh, is being offered at $1.45 million. It’s worth looking at the listing if only for the glamorous interior shots.

5. On Tuesday, the Tompkins County Legislature will vote on whether or not to take $118,000 from the county’s general fund to indirectly help build head start classrooms and a living facility for homeless young adults.
The $118,000 would be use to purchase a house at 661 Spencer, whose land would be incorporated into plans for a 23-person facility for homeless young adults (some with children) aged 18-25, and five classrooms. The classrooms would be built as one building, while the housing looks to be an addition to the TCAction building. The one-story house at 661 Spencer, built in 1950 and formerly formerly owned by the Amici family, would be removed.
The plan is the latest incarnation of TCAction’s Amici House project, slated to share their headquarters property at 701 Spencer Road on the southern edge of the city of Ithaca. TCAction first acquired their property with the help of the county back in 2001; the cost of the purchase is paid back to the county in the form of a 20-year lease.
If the legislature approves, the lease would be extended by two years so TCAction can pay them back for the up-front cost of buying 661 Spencer. The Amici House project would be completed by 2018.
6. Poet’s Landing in Dryden will be moving forward with its 48-unit second phase. The rentals, which are targeted at individuals making 60% of county median income, are expected to begin construction in August with a late summer 2017 opening. Phase I, which consisted of 72 units, opened in early 2013. The state awarded the project $1,600,000 from its Housing Trust Fund, and $734,956 in Low-Income Housing Tax Credits to help finance the apartments’ construction.
7. Tompkins Trust held the official groundbreaking this Friday for it’s new 7-story headquarters. Plans were slightly delayed after some issues arose with NYSEG. The current plan is to have the 123,000 SF building ready for occupancy by March 2018. Costs have risen somewhat, from $26.5 million to $31.3 million.
Comments : 1 Comment »
Tags: 201 college, 201 college avenue, affordable housing, amici house, collegetown, downtown ithaca, dryden, general housing, ithaca, real estate, tompkins county, tompkins financial corporation hq
Categories : affordable housing, collegetown, construction (planned), general housing, ithaca, news, student housing, Tompkins County
News Tidbits 6/11/16: Summer’s Heated Discussion
11 06 20161. We’ll start this off out in Lansing. The 153 acres of land for the Lansing town center is once again in the news. The Lansing Star is reporting that the town is once again serious about selling the land.
So begins yet another chapter in the 20-year saga of the town center land. The town bought the land from the state in 1993 for $100,000, and at the time the land was deed-restricted to recreational use. In 2012, the town paid an additional $294,800 to remove the recreational deed restriction. An article about it was published here in August 2012 (original map below; dunno where why offhand it says 156 acres vs. the 153 reported now). HOLT Architects and TWMLA were hired to draw up some overarching design themes, a Request for Proposals was issued, and three developers responded.
Calamar Enterprises’ Buffalo office submitted a proposal for a $17.4 million, 110-unit market-rate senior apartment building on 13.5 acres, and Cleveland-based NRP Group submitted plans for 80 one-story patio homes on about 15.5 acres. Calamar later re-sited their project at the town’s wish to the northern part of the land, and increased the number of units to 124. Green Square, led by David Taub and HOLT Principal Graham Gillespie, proposed 60 units of housing and 23,000 square feet of retail in 2-3 story arrangements, and civic and recreational space. Altogether, the value of the three would have approached $50 million.
However, all of this was contingent on a sewer being built, which did not happen. The developers agreed to do a package plant that would service just the town center, there was discussion of an IDA-backed tax incentive zone, and the town stood to make a hefty return on investment, but…to quote the Star, “However, the deals fell through. Actually it seemed more like they just faded away. At least one of the developers had signed paperwork saying they intended to purchase acreage from the Town. The Town didn’t seem in any hurry to sell the land, even with clearly interested developers. When the developers disappeared there was no reported effort by the town to pursue the deals.”
Since then, the town continues to get a steady stream of interest, but no real idea on how they want to move forward. Like Ithaca city and town, they’re looking at the possibility of Form-Based zoning for the site, and the town hopes to issue a more specific RFP than before, incorporating revised assessment values. The most intensive approach involved the Form-Based Code and a specific RFP, the least specific is just putting up a for-sale sign ans seeing what happens. Whatever the case, the lax approach the town has taken the past few years may no longer be feasible, with the ticking tax time time bomb of the possible power plant closure looming over the town and schools’ budgets.
2. Speaking of long processes, the Old Library project has formally filed paperwork here to begin the application process for the Certificate of Appropriateness from the Ithaca Landmarks Preservation Commission. The meeting is scheduled for city hall at 5:30 Tuesday the 14th. Although it says early design review, a lot of the legwork has already been done at this point, since the Planning Board and ILPC have been conducting joint meetings with the project team over the past several months to create a design that they’re all comfortable with. However, the ILPC is likely to refine some details moving forward.

At this point, the unit mix consists of 22 1-bedroom units with about 700 SF each, 25 2-bedrooms with about 900 SF each, and 10 2-bedrooms with 1200 SF each, the extra space intended as a den or home office. The building also includes a 1,800 SF community room to be administered by Lifelong, and 3,750 SF of first floor commercial space. The total facility size comes out to about 85,600 SF, and parking for 25 cars and at least 12 bikes, and another 34 bike spaces for the community room. Exterior materials include brick, limestone, and a couple forms of fiber cement, including wood-textured fiber cement.
3. The STREAM Collaborative House at 228 West Spencer is up for sale. The house has its own website here. The 1,152 SF, 2-bedroom net-zero energy house is listed at a price of $305,000. For more info on the house, Noah Demarest was kind enough to give a construction tour of the house while it was underway, and the blog post I wrote up afterwards can be found here.

4. It’s pretty clear at this point that the Evergreen Townhouses project at 1061 Dryden is evolving into the next hot-button development issue out in Varna. The Times has their interview with the angry neighbor here, and more info can be found in the town of Dryden’s April planning board meeting minutes here. So far, the only image of the townhouses themselves has been a perspective that only shows massing – 2 stories, gabled roofs.
Also of note is the town of Dryden Planning Department’s recommendation to the town board (and the planning board’s approval) for an increase in density in certain areas. The change in code affects parcels zoned rural residential, with municipal water and sewer access. The density would be increased from 2 units per acre to 6 per acre. Looking at the zoning map and the sewer map, that would primarily affect the corridor from Varna to the 13/366 intersection, and a rural swath just north of Dryden village near TC3. What this would do is allow 1061 Dryden Rd to withdraw PUD application, and apply for a special use permit (SUP), which are generally easier to obtain.
On a side note, googling Tiny Timbers brings up a Times editorial, written by the Times, that argues against Tiny Timbers for not fitting in with the appearance of Varna. Actually, it kinda takes everyone to task, from developers to town government to residents. But, to make one counter-point regarding mixed-use, commercial services need a certain amount of traffic (not necessarily vehicular) to thrive. If the population base within a certain radius isn’t there, the risk is too great for someone to put their money on the line and hope that they can somehow draw in customers. If Varna wants a mixed-use center with shops and cafes, they’re going to need the population to support it. Some think that will include 1061, some (probably more) think Tiny Timbers, but if there’s no “push”, the ball won’t be rolling.
5. A couple of minor things to note in sales. The 4,200 SF former “Imperial Buffet” property next to the Shoppes at Ithaca Mall has sold to a Syracuse-bsed LLC (Watersprite LLC, established 2004) for $590,000 on Friday the 10th. I personally will always remember this place as being the only place my mother was comfortable with eating in Ithaca because she hates eating out, and felt everything else was “snobby and expensive”.
Meanwhile, the 12-bedroom, 2,837 SF house at 201 College Avenue, the property subject to a heated debate between Neil Golder and Todd Fox, sold for $2.65 million on Friday the 10th, which seems outrageous except that it’s becoming the norm for inner Collegetown transactions – Novarr picked up 5,500 SF 215 College for $5.3 million last year. There will be no delving into that debate again this week, but the city uploaded 580 pages of documentation here, and my colleague Mike Smith is preparing a story for the Voice.
6. Houses of the week. This pair of duplexes are being built on Birdseye View Drive near Ithaca College. Each house has a 4-bedroom unit and a 2-bedroom unit; recent advertisements on Craigslist (since expired, so no link, sorry!) have them $750/bedroom. The developer is the owner of Mahogany Grill downtown, who also happens to be a part of the business team renovating the former Lucatelli’s into a new restaurant, a Tapas and pasta restaurant called Mix Social Dining after the chef’s wife.
These photos are a couple weeks old now, but the one on the right looks nearly complete, while the one on the left was still in the (wood) framing and sheathing stage. Based off the rough window and door openings, they are not exactly the same, but expect them to look similar.
Comments : 3 Comments »
Tags: 1061 Dryden Road, 201 college avenue, collegetown, dryden, lansing, old county library site, senior housing, south hill, STREAM Collaborative, student housing, suburbia, tompkins county, urban planning, varna
Categories : news, senior housing, Tompkins County, urban planning
Boiceville Cottages Construction Update, 5/2016
24 05 2016The Boiceville Cottages are nearly complete. All of the cottages have been framed and sheathed. A set of teal-trimmed cottages are being stucco’d and are having their roofs shingled, but most of the other cottages, including a set of canary yellow-trimmed homes that had only just been sheathed in March, are nearly done (with interior finishing being the only major work left) or are already occupied.
Check out the “easter eggs” – drawings in between some of the decorative half-timbers, and builder Bruno Schickel’s personalized sidewalk slab.
The 140-unit project will finish up this summer, and after that Schickel will be turning his attentions to building out the late Jack Jensen’s Farm Pond Circle project in Lansing. For those who want to visit, the cottages are on Boiceville Road just west of Slaterville Springs.
Searching “Boiceville” in the search box on the right will give you about three years of construction updates (April 2013 looks like the first). It has been a long build-out, but there’s no other project quite like it.
Comments : Leave a Comment »
Tags: boiceville cottages, Caroline, construction, general housing, tompkins county
Categories : construction, general housing, Tompkins County
News Tidbits 5/21/16: Building Bridges, or Burning Bridges
21 05 20161. 209-215 Dryden Road has a name: the Breazzano Family Center for Business Education. Let’s just call it the Breazzano Center for short. The name comes as part of a $25 million donation from Cornell MBA alum David Brezzano ’80, and is named in honor of him and his three sons, all recent Johnson School graduates. According to the Cornell Chronicle, the donation will “substantially support” the building’s construction, which construction loans on file with the county have pegged at $15.9 million. Breazzano is the president of money management and investment firm DDJ Capital Management, and did his undergrad at Union College in Schenectady, where he serves as trustee.
John Novarr is the developer for the 6-story, 76,200 sq ft building, and Cornell will occupy 100% of the structure on a 50-year lease.

2. So, something weird is going on. The city BPW is set to discuss an encroachment for the Chapter House reconstruction at their meeting on the 23rd. However, all the paperwork included in the agenda dates from before the sale and refers to the previous owner. So either the new owner is pursuing the encroachment and the information hasn’t been updated, or this is outdated/no longer being pursued and no one’s updated the BPW paperwork. I tried calling the project architect (Jason Demarest) but he’s out of town until Saturday, and this publishes Friday night, so…dunno. Hopefully someone can provide some insight. For the record, the encroachment is for the first-floor roof overhang over the sidewalk, and will cost the developer $33,812.28.

Open question, would a brick-for-brick rebuild had to have paid for this encroachment as well? It existed with the original structure, this was designed with heavy ILPC input, and given that project costs seem to be why this is in jeopardy…it just seems like an unnecessary obstacle. I know it’s a new build, but it’s replicating a previous encroachment for the sake of character. It seems like the project is being financially punished for that.

3. For this week’s eye candy, the above image appears to be the city’s proposed redesign for the Brindley Street Bridge over on the West End. Pretty similar to existing newer or renovated bridges in the city (Clinton Street, South Aurora Street), with older-style lamp posts and stylized concrete railings.
Alternative 2 calls for a pedestrian bridge to replace the existing Brindley Street Bridge, which was last renovated in 1952. A new bridge for vehicle traffic would be built south from the intersection of Taughannock and West State Streets, over the inlet, and intersecting with Taber Street. The project is expected to go out to bid next year, and completed in 2018.
4. Per the Ithaca Times, the Taughannock Farms Inn out in Ulysses has some expansions and renovations planned since new ownership purchased the property back in February. Along with a bistro for lighter fare, an electric car charging station and a dock, the Times introduced plans for a 2-story, 200-person event center that would be built on the Inn’s property. The purpose of the event center is to provide additional space for events like weddings and formals, and to capture a bit of the mid-week business meeting and convention crowd. The inn itself has 22 guest rooms in five buildings.
The original inn building dates from 1873, when it was a “summer cottage” for John and Molly Jones of Philadelphia. The Joneses also owned Taughannock Falls at the time, though they would eventually deed it over to the state in the mid 1930s to create the park. The current owners are only the fourth in the 143-year history of the property.
5. A couple of big sales in Tompkins County this week. The first one was 308 Eddy Street, a 12-bedroom apartment house in Collegetown. The Lambrou family, one of Collegetown’s medium-sized landlords at ~400 beds, sold the property to the O’Connor family (a smaller landlord family) for $1,225,000 on the 18th. The O’Connor don’t tend to develop their own properties, and 308 Eddy was receently re-roofed anyway, so don’t expect any changes here, but take it as a demonstration of what a captive rental market, high land values and high taxes will do.
The other big sale was outside of Ithaca, at 1038-40 Comfort Road in Danby. A purchaser bought several land and cabin properties being touted as a high end B&B for $1,300,000. The purchases are a couple from Florida, one of which founded the Finger Lakes School of Massage in the 1990s and now heads an aromatherapy institute.
6. According to a report from the Dryden town board liaison to their planning board, the Varna Community Association’s reception to “Tiny Timbers” at the corner of Freese and Dryden Roads has been mostly positive, apart from minor traffic concerns to the 16-house project. More lukewarm was the reception to the 36-unit Evergreen Townhouses proposal at 1061 Dryden, where concerns were raised about having enough green space, and whether it was too far outside Varna to be an appropriate location.
The neighbor two doors down has already started to fight the project, and this is probably going to play out like 902 Dryden did over the past several months. Here’s a pro tip when you’re writing up that angry screed – please stop arguing that renters are second class citizens. Just stop.
7. Therm Incorporated will be presented plans for a stand-alone 20,000 SF manufacturing facility to the town board next week. The addition will be located at their property at 1000 Hudson Street Extension, between its main building and the quonset huts. In a rarity, the industrial-zoned property won’t need to heard to a zoning board – no variances required. The new building will replaces a 3,434 SF ceramics studio. As previously reported on the Voice, Therm expects to create 10 jobs with the expansion. Therm, located at its current facility since its founding in 1935, specializes in custom machining, primarily for the aerospace and industrial turbine industries.
8. Not a very exciting agenda for the Ithaca city planning board this month.
1. Agenda review
2. Floor Privilege
3. Special Order of Business: Incentive Zoning & Site Plan Review Discussion (Lynn Truame)
4. Subdivision Review
A. Minor Subdivision, 312-314 Spencer Road, Charlie O’Connor (MLR)
5. Site Plan Review
A. Sketch Plan, Two Duplexes at 312-314 Spencer Road
This came up back in March – Charlie O’Connor plans on re-configuring vacant street-facing property behind two houses to build two duplexes near Lucatelli’s. STREAM Collaborative is the architect.
Originally, this was at the end of the agenda as sketch plans usually are, but the agenda was revised so that the sketch plan would be allowed to go first.
B. 201 College Avenue – Declaration of Lead Agency, Public Hearing, Determination of Environmental Significance, recommendation to the BZA
C. Elmira Savings Bank, 602 West State Street – Declaration of Lead Agency, Public Hearing, Potential Determination of Environmental Significance, recommendation to the BZA
D. Brindley Street Bridge, seen above – revised FEAF review (parts 2 and 3), recommendations to lead agency (BPW).
6. Umpteen million zoning appeals, none especially contentious
7. Chain Works DGEIS Review, Update Schedule and Special Meeting Schedule.
Comments : 2 Comments »
Tags: 1061 Dryden Road, 209-215 Dryden Road, academic buildings, brindley street bridge, chapter house rebuild, collegetown, dryden, infrastructure, ithaca, manufacturing, news, south hill, tompkins county, ulysses, varna
Categories : academic buildings, collegetown, Cornell, general housing, ithaca, news, Tompkins County
New Tidbits 5/14/16: A Land Subdivided
14 05 20161. This week, the city rolled out a strategy memo for “Design Guidelines” for Collegetown and Downtown. The city held focus meetings back in March with Winter & Company, a Boulder-based urban design and planning firm with experience in cities and college towns from coast to coast. No specific individuals are mentioned as being part of the focus groups, but the focus group meetings consisted of “residents, property owners, developers, architects, design professionals, Planning and Development Board members, Common Council members, and City staff.” The memo is meant to help guide continued discussion of design standards, and to identify key issues in each area that could arise with planning and implementation.
The feedback from the focus groups shouldn’t come as a surprise – use high quality materials, respect historic character but don’t emulate it, recognize that development costs in Ithaca are very high, promote walkability and active street use, encourage parking lot infill, define transition areas between smaller-scale neighborhoods and denser cores, and so forth.
One of the major components being reviewed is whether design guidelines should be mandatory or just a set of recommendations. The city has a design review process that comes into play for certain projects like those on the Commons, but otherwise it’s non-binding unless the BZA or planning board mandates it as part of approval. Regardless, more meetings are expected as the guidelines are fleshed out.
2. The Ithaca Times is checking in with the Al-Huda Islamic Center plan for Graham Road in Lansing. Fundraising is still underway for the 4,828 SF mosque, which according to a member of the Al-Huda board of Trustees, is expected to cost between $650,000 and $1 million, per contractor estimates.
Fun fact of the day, Islamic law prohibits mosques being paid for with funds that collect interest (tainted by usury). Everything must be paid for up-front and in full.
The village of Lansing has already signed off on the mosque plans, and the vacant land at 112 Graham Road is bought and paid for. Pretty sure the above drawing is outdated, but I haven’t seen an image of the latest plan available online. The Times has an interior shot of the current plan to accompany their story.
3. The town of Ithaca passed the nine-month moratorium on two-family dwellings by unanimous vote at its meeting this week. Anyone seeking to build a duplex in the town of Ithaca will now have to wait until February 2017 for a building permit, unless “unnecessary hardship” is demonstrated by the law’s imposition. The law was driven by the construction of multiple 2-6 unit student-oriented structures east of Ithaca College in the Kendall/Pennsylvania avenue area, which they felt was undermining the neighborhood’s character. Earlier versions of the law called for a year’s length, but the town received numerous complaints that a year would actually hit two construction seasons, 2016’s and 2017’s.
4. Also in lawmaking, the bike lanes proposed for the 300 and 400 blocks of Tioga Street in downtown have been shot down in favor of sharrows, 3-2. This comes after strong advocacy by city bicyclists and some planning and sustainability groups, and strong opposition from some elderly and disabled advocacy groups, suburban neighborhood residents and the town of Ithaca’s town board.
5. One of the many issues that faces large-scale planning and development in Tompkins County is that, over the many decades, land has been heavily subdivided and sold off between many different owners, with the properties often passed down or even traded, leaving records piecemeal. With so many owners, some untraceable, it can become logistically difficult, especially if not everyone is on board with a plan.
In front of Moe’s down in big box land, the county owns a 0.3 acre parcel of land previously a part of the flood relief channel. Since 2005, Benderson Development has rented the land as part of its shopping complex – now they just want to simplify things and buy the land from the county. With an offer of $112,500, which is $17,500 over the county’s assessment, and with the county’s 2005 confirmation and 2016 re-affirmation that they have no public use for that slice of land anymore (much of the channel’s land has already been incorporated into other parcels), they’re planning to finalize the sale at the Legislature’s meeting next week.
6. If you glanced at the Voice, you know there’s a plan cooking for 36 townhouse units east of Varna. But according to Dryden’s town planner, that’s not the only project that’s been brought forth to the town. A different applicant brought forth a plan for 20 single-family homes on 9 acres near the intersection of Route 13 and Mineah Road, a rural stretch between Varna and the village of Dryden. The units, expected to be rentals, are allowed as of right in Dryden’s mixed-use zoning – if it’s under 4 units/acre, it doesn’t need a special use permit, or even site plan review. A check of property records reveals several parcels owned by Ryszard Wawak, a Lansing businessman who picked up the land a number of years ago and has already built a duplex (2-bedrooms each) and a 5-bedroom house on subdivided parcels.
If you happen to start seeing houses popping up between Dryden and Varna, it’s probably this project slipping under the radar.
7. Taking a glance at the Ithaca Projects Review committee meeting agenda, the Elmira Savings Bank and 201 College Avenue projects will be undergoing review before heading to the planning board meeting later this month, and the subdivision/reconfiguration to build two two-family houses at 312-314 Old Elmira Road will also be reviewed. There are also a boatload of zoning variances being sought for various projects – Marriott signage, an apartment reconfiguration on Farm Street, a basement home salon on Center Street, a home addition on Cobb Street, parking variances for 121 West Court and a area variance for an existing carport on Grandview Avenue that was apparently never approved by the city when built in 1973. In total, there are nine. It’s times like this that the city would benefit from a simplified zoning code.
Comments : 1 Comment »
Tags: al-huda islamic center, collegetown, downtown, elmira savings bank, ithaca, news, south hill, suburbia, tompkins county, urban planning
Categories : collegetown, construction (planned), general housing, ithaca, news, Tompkins County, urban planning










































































