News Tidbits 5/27/19

28 05 2019

Just a quick pose here to share and take a look at the city Planning Board Agenda tomorrow evening:

1. Agenda Review 6:00

(there is no Item 2. on the agenda)

3. Privilege of the Floor 6:25

4 Approval of Minutes: April 23, 2019 6:35

5. Site Plan Review


A Project: Greenstar Project Changes 6:40
Location: 770 Cascadilla Street
Applicant: Noah Demarest, Stream Collaborative (for owner)
Actions: Approval of Project Changes

Project Description: This project was approved by the Planning Board on June 26, 2018, with subsequent changes approved by the Board on March 26, 2019. The applicant is now returning to with requested items and to request additional changes. Project materials are available for download from the City website: https://www.cityofithaca.org/DocumentCenter/Index/774

The GreenStar project was halted by the board due to aesthetic concerns related to the value engineering. In response to the concerns about the blank wall that would face Route 13, the mural above has been proposed. The development team is also proposing new signage and replacing the wood bollards in the parking lot with lighted steel bollards.

Few further issues are expected to come up, and approval of these changes would allow the project to continue with construction. GreenStar is certain enough of the Board’s approval that its existing 10,000 SF space at 701 West Buffalo Street has been put up for lease.

B Project: Chain Works District Redevelopment Plan 6:50
Location: 620 S. Aurora St.
Applicant: Jamie Gensel for David Lubin of Unchained Properties
Actions: Presentation of Revised Phase 1, Public Hearing, Potential Preliminary Approval of Conceptual Site Plan

Project Description: The proposed Chain Works District is located on a 95-acre parcel traversing the City and Town of Ithaca’s municipal boundary. It is a proposed mixed-use development consisting of residential, office, commercial, retail, restaurant/café, warehousing/distribution, manufacturing, and open space. Completion of the Project is estimated to be over a seven-to-ten year period and will involve renovation of existing structures as well as new structures to complete a full buildout of 1,706,150 SF. The applicant applied for a Planned Unit Development (PUD) for development of a mixed-use district, and site plan review for Phase 1 of the development in 2014. The project also involves a Planned Development Zone (PDZ) in the Town and subdivision. This project is a Type I Action under the City of Ithaca Code, Environmental Quality Review Ordinance, §174- 6 (B)(1)(i),(j),(k),(n), (2), (6), (7),(8)(a)and (b) and the State Environmental Quality Review Act §617.4 (b)(2),(3), (5)(iii), (6)(i), and (iv), for which the Lead Agency issued a Positive Declaration of Environmental Significance on October 28, 2014. The Lead Agency held subsequently Public Scoping on November 18, 2014. The Lead Agency deemed the Draft GEIS adequate for public review on March 8, 2016, held the public hearing on March 29, 2016 and accepted comments until May 10, 2016. The Lead Agency filed a Notice of Completion for the FGEIS on March 5, 2019. The FGEIS includes the original DGEIS, all comments and responses on the DGEIS, revised information resulting from those comments, and updated information since the publication of the DEIS. The Board adopted findings on March 26, 2019. The applicant is now proposing Phase 1 of the project which entails the rehabilitation of buildings 21 and 24. Project materials are available for download from the City website: http://www.cityofithaca.org/DocumentCenter/Index/119

Doing a cross-check, I don’t quite see what changes have been made with Phase I, though early plans called for more office space (now mixed-use, with office space and 60 apartments). Approval of the concept plan (in relation to the FGEIS) is not the same as approval of the individual renovation plans, which have been submitted but will take a couple more months of the standard retinue of environmental assessment forms and declaration of findings. The approved EIS looks at the concept as a whole, while materials, construction impacts and other details associated with individual building plans still require going through the planning board.

C. Project: North Campus Residential Expansion (NCRE) 7:10
Location: Cornell University Campus
Applicant: Trowbridge Wolf Michaels for Cornell University
Actions: Continuation of Site Plan Review (Jessup Road Elevations & Conditions of Approval)

Project Description: The applicant proposes to construct two residential complexes (one for sophomores and the other for freshmen) on two sites on North Campus. The sophomore site will have four residential buildings with 800 new beds and associated program space totaling 299,900 SF and a 1,200-seat, 66,300 SF dining facility. The sophomore site is mainly in the City of Ithaca with a small portion in the Village of Cayuga Heights; however, all buildings are in the City. The freshman site will have three new residential buildings (each spanning the City and Town line) with a total of 401,200 SF and 1,200 new beds and associated program space – 223,400 of which is in the City, and 177,800 of which is in the Town. The buildings will be between two and six stories using a modern aesthetic. The project is in three zoning districts: the U-I zoning district in the City in which the proposed five stories and 55 feet are allowed; the Low Density Residential District (LDR) in the Town which allows for the proposed two-story residence halls (with a special permit); and the Multiple Housing District within Cayuga Heights in which no buildings are proposed. This has been determined to be a Type I Action under the City of Ithaca Environmental Quality Review Ordinance (“CEQRO”) §176-4 B.(1)(b), (h) 4, (i) and (n) and the State Environmental Quality Review Act (“SEQRA”) § 617.4 (b)(5)(iii) for which the Lead Agency issued a Negative Declaration on December 18, 2018 and granted Preliminary Site Plan Approval to the project on March 26, 2019. Project materials are available for download from the City website: http://www.cityofithaca.org/DocumentCenter/Index/811

This one’s starting to get a bit long in the tooth – Cornell was hoping to start construction by the beginning of summer, so that the first phase of dorms (Buildings 1 and 2 above) would be ready for occupancy in August 2021. According to Kim Michaels of landscape architect (and project team rep) TWMLA, they’re aiming for preliminary approval at the June 25th meeting, which would allow them to obtain construction permits to start work. The village of Cayuga Heights’ planning board gave their okay last month, and the town has granted preliminary site plan approval as well.

Changes include replacing the concrete retaining wall for Awke:won’s driveway with natural stone, minor grading adjustments, replacing plaza asphalt with concrete and porous pavers, revised plantings (partly at the town’s suggestion, partly because the demolition plans requires the removal of six more mature trees than first anticipated, and the project team is aiming to plant new trees to make up for it), revised sidewalks, bus stops and ADA ramps.

D. Project: Arthaus on Cherry Street 7:30
Location: 130 Cherry Street
Applicant: Whitham Planning & Design (on behalf of Vecino Group)
Actions: Consideration of Preliminary & Final Site Plan Approval

Project Description: The applicant proposes an as-of-right five-story building approximately 63 feet of height with gallery, office and affordable residential space at 130 Cherry Street, on the east side of the Cayuga Inlet. The site is currently the location of AJ Foreign Auto. The program includes ground floor covered parking for approximately 52 vehicles, plus 7,000 SF of potential retail/office and amenity space geared towards artists’ needs. Building levels two through five will house approximately 120 studio, one-bedroom and two-bedroom residential units. The total building square footage is 97,500 SF. All residential rental units will be restricted to renters earning 50 to 80 percent of the Area Median Income. The north edge of the property will include a publicly-accessible path leading to an inlet overlook. This has been determined to be a Type 1 Action under the City of Ithaca Environmental Quality Review Ordinance § 176-4B(1)(k), (h)[2], (n), and the State Environmental Quality Review Act (“SEQRA”) § 617.4(b)(11). Project materials are available for download from the City website: https://www.cityofithaca.org/DocumentCenter/Index/946

The IDA has given its approval on the tax abatement, so all that’s left on the approvals side of things is preliminary and final site plan approval – with those, Vecino can begin work on affordable housing grants to help fund the project. Vecino will be pursuing a less-competitive 4% low-income housing tax credit (the typical, highly-competitive LIHTCs are 9%; quick refresher, these credits are sold to outside investors and the money is then used to fund the project), and the project team seems comfortable stating that construction will start by the end of the year for a 2021 completion.

E. Project: Student Housing 7:50
Location: 815 S. Aurora Street
Applicant: Stream Collaborative, Noah Demarest for Project Sponsors Todd Fox & Charlie O’Connor
Actions: Project Presentation, Potential Consideration for Preliminary Site Plan Approval

Project Description: The project applicant proposes a new 49-unit student housing complex (16,700 SF footprint) comprised of three buildings constructed on a hillside on the east side of Route 96B, overlooking the proposed Chain Works District. The proposed buildings will contain (2) efficiency units, (3) one-bedroom units, (10) two-bedroom units, (20) three-bedroom units and (14) four-bedroom units. Amenities will include a gym and media room, with access to an outdoor amenity space on the first floor of Building B, and a roof terrace and lounge on the fourth floor of Building B. The project site shares the 2.85 acre site with an existing cell tower facility, garages, an office and a one-bedroom apartment. Site improvements will include walkways and curb cuts to be tied into a public sidewalk proposed by the Town of Ithaca. Fire truck access is proposed at the existing site entry at the south end of the property, with a new fire lane to be constructed in front of the ends of buildings A & B at the northern end of the site. The project will include 68 parking spaces, as required by zoning. The property located in the R-3b zoning district. A variance will likely be required for a rear yard setback deficiency. This has been determined to be a Type 1 Action under the City of Ithaca Environmental Quality Review Ordinance §176-4(B)(1)(k), (n), (B)(2), and the State Environmental Quality Review Act (“SEQRA”) §617.4(b)(11). Project materials are available for download from the City website: https://www.cityofithaca.org/DocumentCenter/Index/982

The project description is not accurate. According to the memo from STREAM, the project is 65 units, but still 141 beds, with 2 one-bedroom, 40 two-bedroom, and 23 three-bedroom units. This has created some minor exterior changes, mostly in the window arrangements. A report from TAITEM chimed in to say that the project does meet the city’s Green Building Policy (which is approved in concept but has slowly been trudging through the legal details). Neighbors have expressed concerns with the project

F. Project: Mixed Use Apartments (77 Units) 8:10
Location: 510 W MLK/ State Street
Applicant: Stream Collaborative, Noah Demarest for Project Sponsors Todd Fox & Charlie O’Connor
Actions: Project Presentation, Declaration of Lead Agency, Review – Draft FEAF Parts 2 & 3

Project Description: The applicant proposes to construct a 4- to 6-story building with a footprint of 13,730 SF and a GSA of approximately 74,700 SF. The project will have 2,100 SF of retail space on the first floor facing W State/ MLK Street and 77 housing units, permanently affordable to households making 50-70% Area Median Income (AMI). Building amenities include a community room, bike and general storage, a laundry room and a fifth floor lounge with access to a rooftop terrace. The project site has frontage on three streets (W State/MLK, Corn and W Seneca) and is in two zoning districts: CBD 60 in which the maximum height is 60’ and B-2d in which the maximum height is 40’. Neither zone has a prescribed number of stories. The project is subject to the Downtown Design Guidelines and will likely require an area variance for rear yard setback. This has been determined to be a Type 1 Action under the City of Ithaca Environmental Quality Review Ordinance §176-4 B(1)(h)[4], (k) & (n), and the State Environmental Quality Review Act (“SEQRA”) §617.4(b)(11).

Looks like the number of units has settled on 77. The question here remains what to do with the State Street elevation, given the likely zoning change will force a 15′ setback from the 5th floor instead of the sixth as proposed.

G. 312 E Seneca Street – Sketch Plan 8:30

The original design above received the planning board equivalent of a roundhouse kick to the jaw, so we’ll see what happens with round two, for which it is hoped the Stavropoulos family and their architect (presumably Jagat Sharma as before) have read the Downtown Design Guidelines. Given its location on the edge of Downtown Ithaca, this is a CBD-60 site, six floors, 100% lot converge, no parking covering.

A potential wild card here is the recent rumor that the owners of the properties next door on North Aurora have put the assemblage up for sale. A redesign may or may not include those properties.

6. Old/New Business 9:00
-Special Meeting Agenda for 4-30-19
-Board Retreat Topics
-Sexual Harassment Training

7. Reports 9:10
A. Planning Board Chair
B. BPW Liaison
C. Director of Planning & Development

8. Adjournment 9:30





News Tidbits 5/11/19

12 05 2019

1. The proposed revision (downzoning) along West State / MLK Jr. Street is moving forward with circulation (review by city departments and associated stakeholders), with a couple of major revisions. The zoning would not be CBD-60. It would be CBD-52 for structures with less than 20% affordable housing, and CBD-62 for structures with 20% or more affordable housing. The quirk in the height is due to mandatory floor heights, which will be 12 feet for the first floor, and 10 feet for each floor above – in other words, five floors for projects with a lack of affordable units (=< 80% area median income), six otherwise.

For 510 West State Street, in which all 76 or 77 units are affordable (my unit count is 76, but they typed 77 in a couple sport of the Site Plan Review), the project would remain largely intact. The new setback requirement would push the fifth and maybe a very small portion of the sixth floor back from West State/MLK Jr. Street for the mandatory fifteen feet, so a little square footage would be lost there. The city had initially sought thirty foot setbacks, but the Ithaca Fire Department said that it would not be reachable by their trucks if the fifth floor was that far away from the street face.

Now, some more astute readers might be wondering is this affects Visum’s other West End project at 109 North Corn Street. The answer is no. The setback rule only affects buildings fronting West State / MLK Jr. Street. The downzoning is intended to protect an aesthetically pleasing segment of West State more than anything else. The setback does technically apply to West Seneca Street, but the building height there is 40 feet anyway, which is the same as the setback.

The affected blocks now also include the 300 and 400 Blocks of West State Street. The only publicly known project that would be impacted is INHS’s Salvation Army redevelopment, which was only aiming for five floors on the West State Street side anyway, but could potentially be impacted by the setback rule – the project design is still in the concept stages with no public images.

A speaker during public comment asked to extend the zoning further to Downtown, and some councilors have discussed further downzoning because “the developers can just pursue a PUD”. That thought process ignores the drawbacks. The more areas impacted and the more stringent zoning becomes, the more labor and time intensive it becomes for city staff because it would likely trigger more PUDs, even while resulting in less development in general because a PUD adds months to a project timeline, uncertainty that lenders don’t like, and forces the Common Council to take on the role of a second Planning Board (which some councilors might be fine with, but some definitely would not and raised this as a complaint during the vote on whether to create the PUD overlay to begin with). Also, if the downzoning were to be applied to a property against the owner’s wishes, say the County Annex property for example, it would likely trigger a costly lawsuit. TL;DR, it looks tempting for additional “community benefits”, but could have significant negative impacts and should be used sparingly.

2. Staying in the realm of laws for a moment, there’s an ordinance that should be made aware to residents of Northside and Fall Creek. A proposal from 1st Ward councilor Cynthia Brock would require every rental agreement and every home sales transaction within 1200 feet of the Ithaca Area Wastewater Treatment Facility’s boundaries to provide documentation of the potential issues and hazards of living near the plant – “you should be prepared to accept such inconveniences and discomfort as a normal and necessary aspect of living and operating in proximity to a waste water treatment facility,” as the document states.

The document isn’t ill-intentioned, but this does impact over a hundred existing Northside and Fall Creek homes and apartments, and quite reasonably would have a negative financial impact on them, whether they plan to sell or if they rent out space. There is nothing on record that these residents have been notified of this proposal. City staff don’t even seem comfortable with the proposal as-is, they don’t think Fall Creek residents are substantially impacted and suggested a cutoff at Route 13, but the 1200 square foot radius seems to be the version being considered right now, paying a trip to city attorneys to see if it’s legal to apply it to all rentals, a detail added at the meeting. Honestly, this doesn’t seem well thought out at this time, and poses a burden to existing homeowners who have not been made aware because of the lack of sufficient outreach.

3. Arthaus and Library Place have had their tax abatement requests approved, on 7-0 and 6-1 votes. The former will bring 124 affordable housing units including special needs housing and artist-centric amenities to the city of Ithaca at 130 Cherry Street. The latter will provide 66 senior housing units on the former Library property on the 300 Block of North Cayuga Street. Arthaus is expected to start construction at the end of the year, while Library Place will resume this month, with completions in 2021 and 2020 respectively.

County legislator Leslyn McBean-Clairborne voted against the Library Place proposal, citing some of the concerns raise over the lack of affordable housing (three units will now be 80% area median income) and general discontent with the site. In my intro post to the project, I mentioned if vaguely that there was a legislator who thought the affordable housing, condominiums, and Travis Hyde projects were all terrible – that was McBean-Clairborne, who has generally favored county offices on the site instead of housing. The county did a study to consider renovating the old library for offices back in 2011, a couple years before the RFP, but the study found it was financially prohibitive because of the building’s unusual interior layout (that soaring 1960s atrium wasn’t a good use of space, and wouldn’t have been cheap to replace).

4. Carpenter Park is also moving forward, in this case with the pursuit of its special PUD zoning. The project is seeking the PUD because of some quirks in yard setbacks, and soil tests showing that they couldn’t place some of the parking underground as initially planned (so now it’s in an above ground garage between the ground-floor retail and the apartments in Buildings B and C). The project would bring about 411,600 SF of new space, including 208 apartments (42 affordable) and an expansion of Cayuga Medical Center’s medical offices, resulting in the creation of 150 jobs. The vote was 4-1, with councilor Brock opposed. The full council will vote on the PUD next month, and then the project can go to the planning board for design review. Keep in mind that the above designs might change somewhat, though the general scale and program mix should stay the same.

5. The Tompkins County Airport has received a $9,999,990 grant, as announced by U.S. Senator Chuck Schumer at a press conference earlier this week. The county was strongly hoping these funds would come through. With the state grant, it means the county is only paying about $260,000 of the $24.5 million bill. Click the link here to learn more about the airport expansion project.

6. The Gun Hill Residences appear to be in the process of selling. A real estate trade magazine notes Southeastern U.S. regional bank SunTrust is giving the buyer a $13.3 million acquisition loan for DMG Investments LLC. DMG Investments is an American subsidiary of a Chinese development firm, DoThink Group of Hangzhou. The company has been active in upstate recently. DMG co-owns a new 322-bed student housing apartment in Albany and has projects scattered across the country. The full sales price has not been discolosed, as the deed has yet to be filed. It was noted that the ca. 1989, 94-unit, 273-bed Gun Hill Residences on Lake Street was nearly completely full at the time of closing (late spring, which is reasonable given a couple of kids might have washed out of Cornell or otherwise moved out). The property was previously owned by Rochester’s Morgan Communities, which was raided by the FBI last year. Morgan purchased the property in February 2011 for $6.15 million, and the current county assessment for Gun Hill is $12.65 million.

OLD render

NEW render

7. Some modest revisions to the Immaculate Conception School plans. Old render first, new render second. The design of the renovated school building has changed substantially, though the overall size has remained consistent. The changes could be due to any number of reasons, from cost concerns to utilities placements necessitating design changes. The single-family homes have been replaced with a four-string of townhomes, and the yellow string has been earmarked for for-sale units.

If I may – make one of the olive green townhome strings red or orange like the houses that have been removed. Keeps it from being so “matchy-matchy”, to borrow a JoAnn Cornish term. More renders can be found on INHS’s sparkling new website here.

On that note, on Monday May 13th the City of Ithaca will hold a Public Information Session for the proposed PUD (Planned Unit Development) for the Immaculate Conception School redevelopment. The Public Information Session will begin at 4:00 PM, in the Common Council Chambers in City Hall. In accordance with the requirements of the PUD, the developer and project team will present information about the project and answer questions from the public.

8. Looking at agendas:

The city Project Review Meeting (the run up to Planning Board meetings) will look at signage changes for the new Hilton Canopy on Seneca Way, a Presentation and potential Declaration of Lead Agency for 510 West State Street (now 50-70% area median income, initially it was 80-90% AMI), The 141-bed, 49 unit Overlook student housing at 815 South Aurora (updated, and review of Full Environmental Assessment Forms Part 2 and 3), final site plan approval for Arthaus and consideration of preliminary site plan approval for the Chain Works District (the focus right now is the renovations for phase one, office space, industrial space and 60 apartments). Apparently, the “Ezra” restaurant at the Hilton is now being called “The Strand Cafe”, after the theater that once stood on the site. More information can be found in the May project memo here.

The town of Ithaca will continue its review of Chain Works as well. Their portion of phase one involves the renovation of two manufacturing spaces into industrial and warehouse space (i.e. minimal work, just a sprucing up of the digs). Also your casual reminder that, unlike Dryden, Lansing or really any other sizable community in Tompkins County, the town permitted the construction of not a single new housing unit – again – last month. It looks the next stage of Artist Alley ($150,000 buildout) and Cayuga Med’s radiation vault ($2 million cost) were permitted.

It appears that the Beer family is heading back for another visit to the village of Lansing Planning Board regarding their until-now cancelled senior cottages project. The only thing known at the moment about this latest iteration is that it would fit the village’s cluster zoning, which means 97 units or less, but not in the same configuration as before (the pocket neighborhood-style homes were too close for code). We’ll see what happens.

Nothing much to note in Lansing town. Review of the Osmica event venue and B&B will continue, as will consideration of the Lake Forest Circle subdivision renewal and the 12,000 SF commercial building proposed for North Triphammer Road just north of Franklyn Drive.

– Courtesy of the village of Trumansburg, we have a new working title for 46 South Street, formerly Hamilton Square – now it’s “Crescent Way”. PApar krief, including revised EAFs, supplements and BZA findings here. The final version has some site plan changes on the location of some townhouse string types, but the overall unit count remains the same at 73 units (17 market rate for-sale, 10 affordable for-sale, 46 affordable rentals). Approval is on the horizon, a little more than two years to the date of when the project was first introduced. The project will be built in phases, with completion not expected until 2023.