Ithaka Terraces Construction Update, 1/2018

26 01 2018

Not much to add here beyond the blurb in the Voice roundup. The Ithaka Terraces are likely to be finished this spring. There is nothing public regarding any sales figures for the ten 2-bedroom and two 3-bedroom units. I’m not sure if another visit is necessary, though maybe if they set up a model unit and don’t mind a nosy blogger, there will be one last photo set.

There’s a lot to like here. As condominiums, they provide an opportunity for home ownership in a city increasing occupied by rentals. With any hope, they’ll be a sales success and encourage other projects to follow suit with their own plans. It’s infill on an fire-destroyed vacant lot, it’s an attractive design, the net-zero energy arrangement is highly appealing from a sustainability perspective, and it’s a few million dollars of property back on the tax rolls (the destroyed property was repossessed by the county, transferred to the city and sold in a competitive bidding process; the first call for proposals attempted to earmark as affordable housing only, but no one submitted bids).

If there any criticism to levy here, it’s not necessarily an issue with just this project, but I’ve had emails calling it gentrification and ‘luxury housing that Ithaca doesn’t need’. But if people are buying here, then they aren’t buying another city property and potentially outbidding someone with fewer dollars to spend. A little additional supply to take pressure taken off the market is welcome. As noted above, the city tried to sell the lot for affordable housing, but it didn’t pan out (not unlike the issues with 402 South Cayuga Street a block away). Additionally, this project is fully taxed, the project team did not seek abatements.

The condos are the work of PPM Homes (Ed Cope), with technical assistance from T.G. Miller P.C. and Taitem Engineering, architectural design work curtesy of STREAM Collaborative, and off-site solar panel installation courtesy of Renovus Solar.

 





Ithaka Terraces Construction Update, 11/2017

23 11 2017

These are turning out quite nice. Building “A” is practically complete from the outside. The plant boxes outside the windows have even been stocked with small ornamentals. About the only thing left are the exterior finishes on the front facade columns. Building “C”, the smaller building to its east, is also nearly finished from the outside. I suspect the wiring coming out of Building “C” just above the parking area is for electric car charging stations.

Building “B”, the other large condo structure, is fully encased in plastic sheeting and wood ribbing. Stucco generally needs to be applied in dry, temperate weather conditions, above 40 F at a minimum. Given Ithaca Novembers, that means McPherson Builder has basically turned the building into a dry, heated bubble so that can apply the stucco properly. Building “D” is still being roofed, and is just getting its windows fitted. It looks like the scratch coat for the stucco is being applied over the water barrier, and the brown coat and the finish coat will come later, meaning that “D” will eventually be bubbled in as well.

Most of the concrete curbs and steps have been formed, poured and cured at this point. The grand staircase will make for a nice shortcut from South Cayuga Street to West Spencer Street.

The marketing material appears to be using the phrase “Arriving here is what you are destined for“. Tje website doesn’t indicate how many of the twelve units are spoken for (if any; the project is in the soft marketing stage, where they’re accepting inquiries but there aren’t any formal real estate listings). The two-bedroom and three-bedroom units go for $299-$434k, depending on size and location.





Ithaka Terraces Construction Update, 9/2017

3 10 2017

So we have a rule at the Voice not to publish the press releases of private for-profit entities unless they add something to an article. They don’t get published as standalones, if at all. From a pragmatic standpoint, giving a for-profit free advertising at our expense doesn’t make good financial sense, and it leads to questions about our integrity.

But, they still come in, filed away in case they come in handy at some point. That was the case here for the press release sent along by Brous Consulting’s Kevin Doubleday for the Ithaka Terraces project back on September 11th:

***

For Immediate Release: September 11th, 2017

Contact: Kyle Waller at 607-272-1765 or office@ppmhomes.com.

ITHAKA TERRACES CONDOMINIUM PROJECT GAINS APPROVALS NEEDED TO PROVIDE FIRST CONDOS AND FIRST NET-ZERO PROPERTY IN DOWNTOWN ITHACA

Ithaka Terraces is a new sustainable luxury condominium complex in downtown Ithaca, currently under construction at 215 West Spencer Street. Scheduled to open in Fall 2017, the Terraces are destined to be the region’s first net-zero condominium complex. The property is currently undergoing last-stage developments with units now available for sale through locally owned and operated PPM Homes. The project is also one of only a few condominium projects to be built in the area since the most recent recession.

The twelve unique units, inspired by colorful Greek cliffside architecture, thus the Ithaka name, range in size from a single story, 1005 square feet flat up to a two-story townhouse, 1520 square feet and boast high-end amenities including hardwood and tile flooring, luxury finishes, and a host of energy-saving appliances. Units start at $299,000.

Combining cutting edge green technology with a walkable location, a car-free or car-light lifestyle is easily attainable. The motivation to build Ithaka Terraces came from the developer’s desire to provide the maximum possible state-of-the-art sustainable living with the highest emphasis on achieving net-zero energy. Hence, no costs were spared to find and take advantage of opportunities in the design and building process to incorporate the most advanced sustainable techniques. The potential for reduced energy use is in place in these condominiums, making the inhabitants able to maintain one of the lowest environmental impacts and costs possible anywhere with a fantastic and active quality of life.

Ithaka Terraces strives to incorporate the most sustainable construction methods and living technology. This includes the use of air-source heat pumps, conduction ranges, LED lighting, electric water heaters, Low-E windows, super-insulated walls and roofs, smart temperature monitoring devices, and other energy-saving devices.

Further green features are available for even greater sustainable living at the Terraces, including charging stations for electric vehicles and at least six Ithaca Carshare vehicles stationed within walking distance. Transportation for the average household is likely to use more energy than the home itself. The Terrace’s convenient location makes it simple to reduce transportation energy use significantly by allowing cars to be an option rather than a necessity for the vast majority of trips.

Because of recent net-metering laws passed by New York State, off-site solar power can be provided to homes in cities from solar arrays outside the city, which makes net-zero living possible. All the energy used at Ithaka Terraces will be provided by solar power from PPM Homes’ 225 kw (835 panels) solar farm about 15 miles east of Ithaca.

Ed Cope, owner of PPM Homes and team leader of the Ithaka Terraces team, has been active in environmental and sustainability causes for forty years.  He started an environmental center in Indiana 25 years ago and he and his family live off grid, using power only from renewable energy (solar panels and some wind).  He started Energy Independent Caroline as part of his early efforts to switch the Caroline town government to renewable energy for its power use.  

One of his apartment buildings on South Hill was the first commercial roof-top solar installation in Ithaca. Ed has strived to build housing units so energy efficient that their entire energy use can come from his small solar farm outside Ithaca; truly net-zero energy. Additional team members include Stream Collaborative, Taitem Engineering, Renovus Solar, and TG Miller and Associates. The project is being managed by Kyle Waller at PPM homes.

For more information on Ithaka Terraces, you can visit: www.ithakaterraces.com or contact Kyle Waller at 272-1765 or office@pphomes.com.

END.

***

It looks like they might be doing soft marketing of the units, with a brochure up and inquiries allowed, but no formal listings up yet. The Ithaka Terraces website states that prices will be in the $299,000-$434,000 range, a ~10% jump from previous estimates. Units range in size from 1,005 SF to 1,520 SF. Ten are two-bedroom units, two are three-bedroom units.

Buildings A and C look like they’re getting the scratch coat for its stucco finish, while B is still ZIP panels and waterproofed covers. Framing is still underway for Building D, which started much later than the other three.offhand, I think the shingles are from one of Certaineed’s designer series, here in Cottage Red. The formwork along the east side/upper slope may be for a concrete retaining wall that will hold the hill back from the parking area.





Ithaka Terraces Construction Update, 7/2017

21 07 2017

Some more progress on the Ithaka Terraces condo project at 215-221 West Spencer Street. Buildings “A” and “B” have had their porches built out and sheathed, with some of the decorative columns are in place (the architecture, penned by STREAM Collaborative, is supposed to take design curs from traditional Greek/Mediterranean hillside structures). The white coating visible from the uphill photos is the water-resistive barrier over which the stucco will be laid. Building “C” is framed and sheathed, but the roof isn’t fully shingled and many of the windows and doors have yet to be fitted. Long-awaited Building “D” has finally started construction, with excavation underway and some foundation forms in place. The grand central stairway is beginning to take shape. From what I was told by developer Ed Cope (PPM Homes), the model unit should be unveiled in the next few weeks.

The website has been updated to take inquiries, with unit sizes ranging from a 1,005 SF 2-bed, 2-bath, unit, to a 3-bedroom, 3-bath 1520 SF unit (3 bathrooms? For the family that hates sharing sinks and showers?). Nothing on the website states pricing, which was previously estimated in the $265k-$390k range.

Side note, I dropped by 413 West Seneca Street and 109 North Corn Street, a pair of projects Ed Cope is doing in Ithaca’s State Street corridor. Nothing to report yet.





Ithaka Terraces Construction Update, 5/2017

1 06 2017

Taking a look at the Ithaka Terraces site at 215-221 West Spencer Street, one question immediately comes to mind – is Building “D” still happening? The other three are far along, and yet there appears to be no sign of Building “D”, a mirror of Building “C”, starting construction. It could be cost concerns or pre-sales worries, or simply a matter of timing. The website doesn’t look like it’s been updated recently, and marketing for the condo units doesn’t seem to have started yet.

Apart from the completion of the roofing, not much additional work has occurred on the exterior of Building “A”. Its twin, Building “B”, has finished framing, sheathing, windows are being fitted and the roofing is well underway, sheathed and covered in Certainteed DiamondDeck and WinterGuard underlayments, but not yet shingled. Building “C” has had its multi-story porch erected and it looks like the R39 cellulose insulation is underway. New to this update are the Bituthene sheets on the concrete foundation walls of “C” – Grace Bituthene Membrane is a two-component system, the first is a sticky, liquid rubberized asphalt compound, the second a laminated HDPE film, and together they’re used for weather and moisture protection, handy when your walls will be exposed to moist soil uphill and several feet deep. The white walls facing the future grand staircase are water-resistive barriers to protect the plywood ZIP panels from the mositure-absorbing stucco finish.

Local eco-builder AquaZephyr LLC (run by Kendall and Mike Carpenter) is the general contractor, Taitem’s doing the structural engineering, T.G. Miller is in charge of civil engineering, STREAM’s the architect, and Ed Cope (PPM Homes) is the developer. Side note, I dropped by the Wyllie site and didn’t see work on the renovation underway, although it’s not clear if the state grant funding has been disbursed yet. It and the PPM’s Ithaca Glass Apartments are expected to get underway this spring.

Also, let’s not forget the ’80s hair metal blasting over the stereo on-site. I guess nothing gets the work done like Whitesnake and Twisted Sister.

UPDATE: From the architect, Noah Demarest, on the status of Building “D”: “It’s a logistic issue. Couldn’t get all the foundations in at the same time. Should be starting soon.”





Ithaka Terraces Construction Update, 3/2017

20 03 2017

Over at the Ithaka Terraces located at 215-221 West Spencer Street, Building “A” is fully framed, sheathed, nearly all Low-E windows have been fitted and the roof has been shingled. Buildings “B” and “C” are still in the process of framing and sheathing. Building “D” might be excavated at this point, but all the snow made it impossible to tell.

Note that the condos use double-stud walls, meaning their are two sets of wood stud walls used in the exterior frame, parallel to each other but spaced apart by about 5 inches. That space is then filled with R39 densely-packed cellulose insulation. The result has its pros and cons. The cons are that it’s more expensive to build, and it reduces the interior space a little bit. The pro is that it’s very energy efficient, which comes in handy for a project trying to achieve net-zero energy use. Along with the low energy consumption and green features, the project will be powered by a solar array owned by the developer out in Caroline.

Since these buildings will have a stucco finish, and stucco tends to absorb moisture but ZIP sheathing does not, most building codes require a water-resistant barrier between the ZIP sheathing and the exterior stucco. This allows the wall to repel and drain off moisture without risking the integrity of the facade. In the photos below, the WRB is the would be the thin white coating going over the sheathing.

Formal marketing for the 12 units is expected to launch in a couple of months. 10 2-bedrooms and 2 3-bedroom units will be available, with prices ranging from $265,000-$390,000.





Ithaka Terraces (215-221 West Spencer Street) Construction Update, 1/2017

14 01 2017

The first building of the Ithaka Terraces, Building “A”, is fully framed and in the process of being roofed. The project uses double stud exterior walls in tandem with Insulated Concrete Forms (ICFs), which is thermally insulated plastic filled with concrete. The zip sheathing goes on over the surface. The purpose of the thick, more premium approach is for more efficient insulation, since the condo units are designed to be net-zero compatible (the high energy efficiency reduces the need for off-site renewable energy sources, and net-zero becomes more feasible as a result).

Further up the sloping site, smaller Building “B” has completed the ICF erection ground floor and is starting work on the upper floors. Note the reinforced concrete wall facing South Cayuga (east). That will eventually be back-filled and hidden from view. As seen in some of the early concept designs below, only the top floor of the three floors of Building “B” and “D” will have windows facing outward; the South Cayuga side of the property is where the parking lot will be laid.

The other large building in the four-building cluster, Building “C”, a mirrored floorplan of “A”, is just getting started; the site was being prepped and graded when these photos were taken last week. Building “D”, a mirrored floorplan of “B”, will start construction at a later date, as the other three get further along. In the last photo, one can see the winding temporary staircase workers use to get to the building themselves. AquaZephyr, an Ithaca firm specializing in eco-friendly construction, is the general contractor in charge of the buildout.

The 12-unit condo project will begin formal marketing later this Spring. There will be 10 two-bedroom units and 2 three-bedroom units, in the $265k-$390k range. A late 2017 opening is planned. Interested readers can submit queries here.

20170107_112320 20170107_112356 20170107_112359 20170107_112419 20170107_112433 20170107_112437 20170107_112656 20170107_112710 20170107_112727 20170107_112735

215-221_spencer_v1_2 215-221_spencer_v3_1

ith_terr_intro





Ithaka Terraces (215-221 West Spencer Street) Construction Update, 11/2016

26 11 2016

Ed Cope’s Ithaka Terraces have made modest but noticeable progress in the past couple of months. Building A is up to the third floor, while Building C is undergoing foundation work. The other two buildings, B and D, will come along in later stages.

Since the 12-unit South Hill condo project is going for net-zero capability, its construction is a little different from the norm. Quoting the sales website:

“The building features nominal 12 inch thick double stud exterior walls with a total of R39 continuous dense packed cellulous insulation and 18 inches of R63 loose fill cellulous insulation in the attic. The walls and attic are completely air sealed with Zip sheathing with all seams taped to prevent vapor migration through the walls and ceiling.”

The exterior walls are a combination of thick wood stud walls, thermal plastic filled with concrete and Huber Zip sheathing. In between the cavities of the stud walls, local contractor AquaZephyr will be blowing in dense cellulose insulation (pictures of that process here). This will allow the condos to achieve a very high degree of energy efficiency, and assist in making the project net-zero capable.

More info on the project can be found here.

20161119_125056 20161119_125109 20161119_125122 20161119_125128 20161119_125148 20161119_125208 20161119_125219 20161119_125229 20161119_132737

215-221_spencer_v3_1





Ithaka Terraces (215-221 West Spencer Street) Construction Update, 9/2016

4 10 2016

I wanted to wait until the Voice condo piece was published before putting these photos up. Work has started on the twelve condominiums planned for 215-221 West Spencer Street. The project, dubbed “Ithaka Terraces”, is the idea of Ed Cope, a retired Cornell biologist who owns the local property management firm PPM (Premium Property Management) Homes.

215-221 West Spencer Street is a steeply sloped 0.47 acre site that was previously home to a multistory apartment building. The building had fallen into disrepair by the early 2000s, and the city bought the property for $530,000 in 2003 with plans to turn it into affordable housing. However, that plan was thrown off track after the building burned down not long afterward. The site was then used as an informal parking lot by nearby residents for a number of years while the city figured out what they wanted to do with it. The city deeded the property to the Ithaca Urban Renewal Agency in 2013, who attempted to sell it as affordable housing, but found no takers at the $100,000 starting bid. Cope picked up the property when it was offered for sale to general housing, paying $110,000 in March 2015. Sketch plans were presented a few weeks later at the March Planning Board meeting.

The parcel is zoned R-3a, and the property required some variances for having parking within rear yard setback, which the planning board and BZA were comfortable with given the steep topography of the site. The property was approved by municipal boards last fall. Long story short, it’s classically-inspired urban infill.

The plan is to have the buildings ready for occupancy by September 2017. Units range from $265,000-$390,000, depending on size and location. Two of the units are 3-bedrooms, and the other ten are two-bedrooms, ranging from 637-1311 SF. For those interested, more information can be found at the just-activated website for the project here.

Along with Ed Cope (operating as “Net Zero NRG LLC”) on the project team is architect Noah Demarest of STREAM Collaborative, Taitem Engineering for structural engineering, T.G. Miller P.C. for site surveying and civil engineering, and green building expert AquaZephyr as general contractor. All of those businesses are local. The sawhorses in the photos say McPherson Builders, but they could be a subcontractor, or on loan.

In the now two-week old photos below, Building A is already under construction, while the site for building C has been leveled. More specifically, the foundation has already been dug, formed and poured for Building A, and the first-floor walls have been erected. Like their little pioneer across the street, The buildings are designed to be net-zero energy capable. The slab foundations will be insulated with R15 rigid foam, and the first floor walls use insulated concrete forms (ICFs) similar to the Fox Blocks used for the Thurston Avenue Apartments a couple of years ago. The walls are put together block-by-block, with concrete poured into the inside gaps. This provides insulation on both the interior and exterior of the wall.  The building will use electric air source heat pumps for winter heating and summer cooling, with the electricity provided from a solar array Cope owns in the town of Caroline. The buildings will seek net-zero certification once they are completed.

Here’s the press release from Ed Cope that I received as part of our Q&A:

One of my primary interests in Ithaca housing is to help improve the overall community. My development goals all come from that objective, and so for the past few years I have worked to identify sites that are a very inefficient use of space, and are therefore mostly vacant and difficult to build on which is why they are still in need of development.

This combines with my longtime interest in efficient use of energy which includes building energy-efficient buildings. This interest leads me into risky but rewarding projects and works well with the city’s infill development initiatives. At PPM Homes we have transformed many of the older houses that we have acquired into much more energy-efficient dwellings.

One of our successes was the complete rebuild of a rundown property on a steep and difficult site at 201 S. Aurora. We were able to transform this property into a beautiful and more appropriate “gateway” to South Hill, a sharp contrast to the decrepit and crumbling house it once was.

The Ithaka Terraces project is our second effort at completely new development, the first being across the street at 228 W. Spencer where we took an impossibly small and impossibly steep postage stamp of a site and built a netzero energy 2-bedroom house.

This house, which is now on the market, is currently powered completely by PPM Homes offsite solar array which incredibly also provides all of the electricity for many of the properties that PPM Homes manages.

The condos at Ithaka Terraces will also be powered by an additional solar array that we will be built by Renovus Energy next to our current array which is 15 miles outside of Ithaca.

Both of these properties on West Spencer Street are built on sites that are extremely difficult on which to build. They have been vacant for years and would probably have remained vacant for years to come. Special engineering consideration due to the peculiarities of building on the sites has been handled by Tatiem Engineering.

The Ithaka Terraces project also responds to the recognized need for condominiums downtown. Three blocks from the Commons and consisting of 12 two and three bedroom units, these condominiums will provide upscale quality and energy-efficient living.

In the interest of reflecting Ithaca’s namesake our design will add a pleasing Greek aesthetic to this part of West Spencer Street. The project should be complete by this time next year and be available for reserving units by early summer. Our website for the project is up and running at IthakaTerraces.com .

20160918_144152 20160918_144204 20160918_144222 20160918_144249 20160918_144307 20160918_144337 20160918_144604

215-221_spencer_v3_1 215-221_spencer_v3_2

215-221_spencer_v2_1