Belle Sherman Cottages Update, June 2014

1 07 2014

Work continues on the Belle Sherman Cottages on the east end of the city (technically, just over the city line in the town of Ithaca). Homes have sold at a rapid pace this year, going from just six lots/homes in the first two years, to at least eleven more lots/homes sold in the past six months (this count includes at least one townhome that was sold). Only 3 of the 19 single-family home lots are still for sale – lots 9, 11 and 12, on the southwest side of the parcel. Lot 9 will be used to showcase a new “cottage” design that has not yet been built. I don’t know why there’s been a sudden uptick, but at this point, I would not be surprised if the last lots sell before the end of the year (along with several more homes completed before winter arrives).

Since I last came through in late April, lot 13 was completed, and two more are under construction – lot 6, a “craftsman farmhouse”, is the first home built in that style. Lot 4, also underway, is a “classic farmhouse”, recently assembled from its modular pieces. There was no indication of site prep or construction for the townhomes.

 

 

6-29-2014 132 6-29-2014 134 6-29-2014 135 6-29-2014 137 6-29-2014 139 6-29-2014 140 6-29-2014 142

6-29-2014 133





Boiceville Cottages Update, June 2014

30 06 2014

Decided to pay these a visit while on my way to a Sage Chapel wedding. Also, to prove to myself that I could take pleasant-looking photos of this complex.

Several buildings were underway, and two were a new style – five-unit gatehouse structures. They appear similar to the three-unit gatehouse structures already built, but the first hint that these were different comes from the dormers being positioned further out. My guess would be they they are one-bedroom units on the end and studios in the middle three units. A set of three houses, the ones with the orange trim below, appeared to be in the last stages of construction. The pink-trimmed and blue-trimmed homes next to them have only just received landscaping, and appear to have tenants.

6-29-2014 120 6-29-2014 121 6-29-2014 122 6-29-2014 123 6-29-2014 124 6-29-2014 125 6-29-2014 126 6-29-2014 127 6-29-2014 128 6-29-2014 129 6-29-2014 130





Belle Sherman Cottages Update, 4/2014

16 04 2014

My last stop, on my out of town. In short order, I mentally debated stopping for photos, missed the turn due to the debating, circled back around, ended up ditching my car in a reserved parking spot at the Coal Yard Apartments complex. Then I ran down the hill, to the development, back up to the hill, and back into my car in the span of five minutes. I’m sure some of the neighbors that were outside Sunday afternoon were a little confused by my behavior.

Since my last time through, work was completed on the bungalow on lot 19 (someone gave it red porch trim; I’m guessing the owner), and the “Victorian farmhouse” on lot 13 is well underway, the modular pieces are assembled and it looks like siding swatches are being tested and installed. I expect this house will be done in just a few weeks. According to their facebook page, Q1 2013 was a stellar three months; five lots were sold: lots 4, 6 and 18 (elevations here), the spec house on lot 1, and one of the planned townhouses. That means 10 of the 19 houses planned have been sold. Considering they sold only six houses in the past two years, this is quite an uptick. Looks like Carina Construction will be busy this spring and summer.

4-13-2014 083

4-13-2014 0844-13-2014 0854-13-2014 0864-13-2014 0874-13-2014 0884-13-2014 0894-13-2014 090





Route 13 Is Becoming Suburban Hotel Row

26 02 2014

patel_hotel2

The best part about this project is, I was totally confused when I first saw it, and thought that someone had changed up the Holiday Inn Express proposed for 371 Elmira Road. But I think I can be forgiven for the error – both projects are 4-story, 54′ tall hotels prepared by Optima Design and Engineering out of Buffalo. However, the two projects diverge from there. Project description here, elevations and lot layout here, project application here. The hotel as proposed for 339 Elmira Road is a small one, 37 rooms, current being described as “independent” (no chain affiliation), which given its size is no big surprise. The 6,468 sq ft building is situated for an empty 0.59 acre lot, what was once home to the Salvation Army store before they moved down the road a few years ago and the building was demolished. Jason over at Ithaca Builds reported that the land sold for $143k last summer.

patel_hotel1

The project’s application predicts a time frame of construction from June to December of 2014, and a project construction cost of $1.7 million. What Ithaca gets for that $1.7 million is a typical suburban-style box hotel, a smaller version of what you typically find at highway exits. In a way, that’s what this stretch of Elmira Road/Route 13 is becoming – previously, it was just the Comfort Inn, then the Hampton Inn in 2003, the Fairfield Inn last year, and now this and the Holiday Inn Express are in the proposal stages. That would mean 219 more hotel rooms in this area then there was in 2012.

On a completely unrelated note, the infill project by Heritage Builders at 128 West Falls Street continues their fine tradition of developing underused city/town parcels, even if the designs are a bit ungainly.

 





Miscellaneous Project Updates, 12/2013

9 01 2014

1-2-2014 356

After forever and a day, the Argos Inn is finally open, and the “Bar Argos” watering hole opens to the public January 17th. The high-end boutique hotel offers 10 choices of rooms to the deep-pocketed visitor.

1-2-2014 357

Apart from some underground telecommunications that still need to be tweaked, phase II of the Commons renovation, the utility rehabilitation and replacement, is complete. Surface improvements (i.e. the pretty things) will begin this spring, or sooner if the rest of the winter turns fairly mild (not likely).

1-2-2014 359

Press Bay Alley. It’s a project I’ve never really covered on this blog, but Jason’s kept a watchful eye on over at Ithaca Builds. What we have here is a rather unusual concept, urban micro-retail, which is becoming popular as a form of urban infill in larger walkable communities. The recent renovated space right across the alley has an “entertainment venue” proposed, which would complement retail well. It’s a great idea as a sort of micro-business incubator; if a retailer’s concept works out, hopefully the retailer will move to a larger space within the community.

1-2-2014 364 1-2-2014 363

Sheathing and waterproofing are complete at Planned Parenthood’s new 16,000 sq ft location (not 18,000 as I initially wrote last year), located northwest of downtown on West Seneca Street near Meadow. Windows have yet to be installed, (as of December 30th), but I would say they’re not far off. Planned Parenthood hopes to have the $6.12 million building completed by May 2014.

 





Stocking and Klarman Hall Progress Photos, 12/2013

7 01 2014

12-17-2013 086

This photo is probably timed similarly to Jason’s over at Ithaca Builds. Consistent with his analysis, a little bit of scaffolding visible in this image gives indication of the roof work being done to Goldwin Smith, and underground work over east Avenue is closed up, if temporarily. The $61 million dollar token glassy box adds 33,250 sq ft of new usable space.

Note for Cornell visitors – from this Wednesday (Jan 8th) to April 19th, 2015, the southbound lane of East Avenue will be closed to facilitate construction of Klarman Hall. I’d get around to feeling sympathetic, but I had the Thurston Ave. bridge detour my freshman year, and then years of Milstein, so…eh. Deal with it.

12-17-2013 052

12-17-2013 072

1-2-2014 335

The time difference between photos 1/2 and 3 is about 15 days. I just happened to pass through Ithaca twice in December, for two separate events (the first one though, I was only able to take photos on Cornell campus). I doubt I’ll be as lucky in the next few months.

Stocking Hall phase 2 is underway. Luckily for me, I have a friend that is a food science alum, who sends me all of the email updates. Quoting the one sent this past Thursday:

Phase 2 of the renovation project started several months ago with a focus on getting as much of the slate roof replaced as possible before winter. I think they were able to get about 70% of Stocking re-roofed. Asbestos abatement was the first part of the inside work. Once a floor was abated, Pike [construction company] worked on demolishing all interior walls.  Last Thursday (1/2/14) an independent testing agency certified the air test was safe after the abatement was completed on all floors. We took our first look on Friday.

The basement has been gutted, the first floor has undergone asbestos abatement and will begin demo shortly, the second and fourth floors have been gutted, and the third floor isn’t far along, still in the initial teardown/salvage stage. The renovation of old Stocking is due to be complete in August 2014.





Collegetown Terrace Progress Photos, 12/2013

6 01 2014

I always carry a second set of charged batteries on me when I do these little photo tours, because the last thing I want is to have my day cut prematurely short, or pay out the nose for a new pack of AAs (I rotate through two sets of rechargeables, for the record). It doesn’t help me much when I leave the extra set on the passenger’s seat of my car, which is parked way up on Pearl Street. I was cold and soaked to the bone by the time I finally finished getting all the shots I wanted. Here, there are not only construction photos, but also shots from some less familiar angles of the project.

It still astounds me when I think of the numbers associated with this project. Seven buildings over 12 acres. The net increase in bedrooms is 589 (1,226 total, in at least 610 units). The construction cost exceeds $70 million. Using the Danter study (which assumes a 98-99% occupancy rate), that would mean 580 more residents in this area (although given the intended market, it’s mostly re-appropriation of tenants from other parts of the county). That’s more than the population of nearby Freeville. Certainly, the project has been fraught with contentious debate since it was first proposed. As development goes, it’s the proverbial 800-pound gorilla.

Buildings 5 and 6 are well-underway, heading towards a completion/occupancy date of August 2014; building 7, which is very similar to building 5 but further south (i.e. deeper into) on the property, will be constructed in the 2014-2015 timeframe.

1-2-2014 318

1-2-2014 319

1-2-2014 320

Building 5 and the elevated walkway.

1-2-2014 321

1-2-2014 322

1-2-2014 323

1-2-2014 324

1-2-2014 325

1-2-2014 326

Building 6, complete with winter-friendly plastic wrap.

1-2-2014 327

The rear addition of the George C. Williams House.

1-2-2014 330

The “Mithcell Plaza“, which incorporates elements from the locally-relevant Delano House that was demolished to make way for the project.

1-2-2014 329

Vinyl-tastic. I thought these were supposed to be metal panels…?

 

1-2-2014 328

No one mind me, I just needed a place to briefly dry off.





Gates Hall Progress Photos, 12/2013

5 01 2014

 

With an anticipated opening date early in 2014 (slightly behind schedule), the $60 million, 101,000 sq ft Gates Hall project is nearly complete. The work left at this point appears to be completion of the primary entrance structures (the “feet”, to use Jason’s term), a little landscaping, and interior work. Kinda odd to think the discussion of Gates Hall on this blog goes back to nearly the very beginning (and technically, since Bill Gates donated the money in 2006, this project has been in queue for even longer).

1-2-2014 349

1-2-2014 339

1-2-2014 341

1-2-2014 342

1-2-2014 343

1-2-2014 344

1-2-2014 345

1-2-2014 346

1-2-2014 347

1-2-2014 348





Breckinridge Place and Seneca Way Progress Photos, December 2013

4 01 2014

1-2-2014 362

1-2-2014 360

1-2-2014 361

Breckinridge Place and its 50 units move closer to completion. In his last update, Jason over at Ithaca Builds noted the removal of bricks for what he surmised to be the architectural shades, although in the renderings they were located only two-thirds up the windows, rather than at the top. These photos seem to support that. The building is slated to open in early 2014, and at least from the outside, it looks like only minor work remains.

1-2-2014 355

1-2-2014 352

1-2-2014 353

1-2-2014 354

Across downtown, Seneca Way is putting the finishing touches on its eastern facade as it inches toward its opening date this month (haven’t heard specifics, so I’m assuming a soft opening). Apart from a few details like installation of garage doors on the ground level, signage and some ground work, this building is nearly complete as well. Seneca Way brings 38 apartments and 8,600 sq ft of office space to downtown Ithaca.





Belle Sherman Cottages and Boiceville Cottages Progress, 12/2013

3 01 2014

Over my New Year’s holiday, I passed from Albany to Binghamton to Ithaca, to meet with someone and carpool west to Buffalo. This gave me a few hours to kill waiting for that person to arrive, so…carpe diem.

1-2-2014 300

1-2-2014 299

I really don’t care for the finish on the new cottages. It makes them look prematurely aged and gives them a less inviting appearance vs. their older cohorts.

1-2-2014 302

1-2-2014 301

Compared to the last photos, the cluster in the left of the second photo from top is now complete, with slab foundations in place for the next dozen cottages. I suspect these will mostly be built during the spring.

1-2-2014 304

Notably, when this day started, it was raining and in the low 40s.

1-2-2014 307

Next up were the Belle Sherman Cottages (a.k.a. Vine Street Cottages) on the east edge of the city.

1-2-2014 306

The “craftsman bungalow” on lot 19 is nearing completion, from the looks of it.

1-2-2014 308

Meanwhile, another house will be starting construction in the near future. This one looks to be lot 14, another “Victorian Farmhouse”, like the beige home in the lead-in photo. I wonder how many homes will have to be sold before marketing starts for the townhouses?

1-2-2014 305

As a quick side note, I noticed the grassy lot next to where I usually to park my car is now occupied by a two-story home. It’s not the same as the spec home proposed in the initial ad (the lot sold last August), but this house doesn’t look half bad (the entryway seems a little spartan).