I always carry a second set of charged batteries on me when I do these little photo tours, because the last thing I want is to have my day cut prematurely short, or pay out the nose for a new pack of AAs (I rotate through two sets of rechargeables, for the record). It doesn’t help me much when I leave the extra set on the passenger’s seat of my car, which is parked way up on Pearl Street. I was cold and soaked to the bone by the time I finally finished getting all the shots I wanted. Here, there are not only construction photos, but also shots from some less familiar angles of the project.
It still astounds me when I think of the numbers associated with this project. Seven buildings over 12 acres. The net increase in bedrooms is 589 (1,226 total, in at least 610 units). The construction cost exceeds $70 million. Using the Danter study (which assumes a 98-99% occupancy rate), that would mean 580 more residents in this area (although given the intended market, it’s mostly re-appropriation of tenants from other parts of the county). That’s more than the population of nearby Freeville. Certainly, the project has been fraught with contentious debate since it was first proposed. As development goes, it’s the proverbial 800-pound gorilla.
Buildings 5 and 6 are well-underway, heading towards a completion/occupancy date of August 2014; building 7, which is very similar to building 5 but further south (i.e. deeper into) on the property, will be constructed in the 2014-2015 timeframe.
Building 5 and the elevated walkway.
Building 6, complete with winter-friendly plastic wrap.
The rear addition of the George C. Williams House.
The “Mithcell Plaza“, which incorporates elements from the locally-relevant Delano House that was demolished to make way for the project.
Vinyl-tastic. I thought these were supposed to be metal panels…?
No one mind me, I just needed a place to briefly dry off.