Latest planning board agenda is online and there’s a lot — and I mean a lot — that will be discussed. I’m going to be updating this post as more information comes online, so this first draft is a sort of “here’s what we know” going into the meeting.

A. No surprise, the Ridgewood student housing project (the address has been updated from 1 Ridgewood to 7 Ridgewood) is up for discussion once again. The project needs a “certificate of appropriateness” from the Ithaca Landmarks Preservation Council (ILPC) since it’s in the Cornell Heights historic neighborhood, and things are not looking all that auspicious, given the recent report from the Ithaca Journal. The planning board would likely give approval with stipulations if the ILPC approves the plan, but that’s a very big “if” at this point.

B. The downtown Ithaca Marriott. This site is the triangular parking lot next to the Commons at Aurora Street, and has been covered in detail both here and at IB. The history here goes back five years, back when it was going to be called the “Hotel Ithaca” (now the name for the former Holiday Inn). This one has been stalled since the fall due to financing issues, but that has been taken care of in the past couple of weeks and they want to start construction ASAP. They have several changes that need to be reviewed since they have completed “value engineering” (a phrase I fear, since it’s the pretty way to see they cut back on material costs and design features), so we’ll see what this will look like. The current proposal’s rendering, at 10 floors and about 160 rooms, is below.

Ith_Marriott

 

4-8-2013 335

C. Likewise, the Stone Quarry project was also approved a while back in the fall of 2012, but only now managed to secure funding. Here’s the previous discussion here, and here’s details from IB. The project, slated for a parcel on Spencer Road where Ithaca Taxi Dispatch keeps a parking lot, will bring 35 units of INHS-run affordable housing. This one is also up for re-approval for value engineering reasons, and looks to start construction early this fall.

stonequarry2

stonequarry1

D. 140 College aka the John Snaith House addition, discussed earlier this week here.

E. “205 Dryden Road, Student Housing, Jagat Sharma – Sketch Plan” — Now here’s something new. 205 Dryden is the Kraftee’s Building. Jagat Sharma is a prolific local architecture firm, responsible for many of the larger apartment buildings in Collegetown. I can’t seem to find the owner from the tax records, which indicate the current owner has been the owner since 2004. Jagat Sharma tends to be a favorite architect for Ithaca Renting/Jason Fane, and Lambrou Real Estate, but neither of them seem to own the parcel from what I can tell (it’s possible one of them does, but the upstairs units are not rented).  Novarr-Mackesey owns three parcels next door, but I don’t see anything on their website either. Regardless, this falls in a Collegetown MU-2 zone, 4-6 stories, and 45-80′ in height. Whatever is proposed here is going to be pretty big, comparable to Josh Lower’s Collegetown Crossing project.

Edit: Jason at IB tells me it’s owned by Pat Kraft, the guy that runs Kraftee’s.

8-21-2012 113

F. Speaking of which, 307 College, aka Collegetown Crossing, has a new sketch up for review as well. With the new zoning guidelines, the current version isn’t doable because it impedes on the lot to its east. So this version will have a 9% smaller footprint at least, but parking will no longer be an issue. For the record, here’s the site, and the old design.

11-24-2012 161

 

G. “Downtown Hampton Inn Hotel, Scott Whitham – Sketch Plan” – Another re-do of sorts. This one appeared in its original form in December 2012. The original proposal, proposed by Neil Patel (his family members are the ones developing the hotels off 13) was for a 6 story, 92-room, $16 million hotel that would have demolished the Carey Building, and the original design was by Jagat Sharma. Scott Whitham is another local architect, so given the revised space constraints and the new architect-of-record, the design of this will be something completely different.  Although hopefully it doesn’t involve tearing down buildings the developer doesn’t own.

H. 314-320 E. State Street, the Carey Building addition – discussed earlier this week here.

***

In sum, there’s a lot of stuff going on all at once. I’ll update as it all plays out, and documents and renders become available.

UPDATE 1: The new design of the Stone Quarry apartments:

inhs_stone_quarry_rev_1 inhs_stone_quarry_rev_2

Due to concerns with how the soil will settle on site, the walkways and elevations of the buildings have been altered. Each townhouse now steps 8 inches going north to south, which makes the middle ones look a little misshapen. The soil issue also forced a re-do of the ends of the apartment building, since it couldn’t be graded as originally planned. On the cost-cutting end, balconies have been replaced with windows, the south facade of the apartment building was tweaked, some of the trim has been removed or down-valued on the Spencer Road side of the townhomes, and a few more windows punched in on the sides of the townhome end units. there’s a few tweaks to the site plan as well, which can be found at the link above.

UPDATE 2: Here’s the proposed Hampton Inn, details here. The new hotel would be built on the parking lot behind the Carey Building.  The proposal calls for six floors, 120 rooms, and 2,000 sq ft of retail/restaurant space, with only about 9 parking spaces on site. The entranceway would be via a driveway between the Carey Building and the Eagles Buildling, which I imagine being a bit of a logisitical nightmare at the moment, given that the Carey Building has its own renovations underway and additions planned.
hampton_new_3
hampton_new_1

hampton_new_2

 

 UPDATE 3: Up next, revisions to 307 College Avenue, Josh Lower’s Collegetown Crossing project. Nothing fundamentally different here, but the design has definitely been tweaked. Full details here. The revision reduced the number of apartments to 43, with 98 bedrooms (previous was 103). There would be five retail spaces on the ground level of the six-story, 63’4″ structure. The size and scale of this revision fit comfortably within the rules of the new Collegetown MU-2 zoning of the parcel.

ctown_crossing_rev_1

UPDATE 4 (6/5/14): The updated design of the Marriott has been released, and will have its own special planning board meeting on June 10th. Apart from updated Marriott signage and some materials tweaks, this one has virtually the same design as the original, which has me breathing a sigh of relief. Perhaps this one will start construction in July after all.





Mixing Old With New

20 05 2014

4-13-2014 079

After something of a dry spell, a couple of projects are due to come forward in the next few weeks, both involving similar concepts – additions to existing structures.

First, 140 College Avenue. Site plan here, details of the revision here and here. This actually isn’t the first time this one has come up to bat, having made its rounds in the news a little over three years ago (token disclaimer: I wasn’t a fan of it then, and my mind hasn’t changed). 140 College, better known in historic circles as the John Snaith House, has been targeted for a one-unit, 12 bedroom, 3,800 sq ft addition by its owners, the Po Family Realty. The addition, by local architect Jason Demarest, would be built on the south side of the building, separated by a glass partition. The Po family has already run the gauntlet with the planning board, since the Snaith House is a local landmark. Their plan was approved, but given the zoning, it required 6 spaces, for a total of 12 parking spaces for the whole building. Apparently, this made the project less workable, and it’s been on hold since. The developer is using the recent changes to Collegetown zoning as an impetus to change the terms of the project’s approval, reducing the number of parking spaces for the building to a total of 4. The project as proposed eliminates 2 of the 6 parking spaces on site, so only 4 would be left. Originally, 8 spaces had been secured off-site (4 on site + 8 off site = 12), but the lease on those will expire before this project is complete, as construction is tentatively slated to start late next month, and they are unable to renew those leases. Rather than renting new off-site spaces, the developer just wants to keep the total at 4. In exchange, they will provide bike racks, and all tenants membership in Ithaca Carshare. Before the zoning change, this would have been a tough sell, but it stands a good chance of approval going forward.

snaith_1

Project number two, on the other hand, is new to the boards. This one targets the Carey Building, which has been in the news quite a bit as of late as the new Ithaca/Cornell/IC/TC3 business incubator is being built on the second floor, set to open this summer (more details on the renovation process can be found over at Ithaca Builds). A third floor addition has been in the works, projected for a 2015 completion. Well, there has also been discussion of a little more expansion beyond that, and that became clear with this document sent to the city this week. Local developer Travis-Hyde Properties proposes an additional 3,600 sq ft of office space on the third floor, and two more floors above that with 14 micro-apartments. This is within current zoning and no variance will be needed. Micro-apartments are a rather new phenomenon, but have significant potential in urbanized areas, especially cities like Ithaca where their lower square footage (think 400-500 sq ft) permits a lower monthly rent, which can hopefully make a small dent in the affordable housing issue the region is struggling with.

There’s no official render, but we have a massing study that gives a pretty good idea of the proportions of the vertical addition:

carey_1

Given that Travis-Hyde looks to be partnering with local firm John Snyder Architects on this one, expect something modern, with generous amounts of glass. I generally am not a fan of building additions, but I’ll reserve judgement until actual renders come out for this one. At the very least, this will be better than that hotel proposal from the Patel family a couple years ago that proposed tearing the Carey Building down. the only take-away from that stale proposal is that if you want to make enemies in the business community, go ahead and propose projects for land you don’t own, and the owners have no intention of selling.

12-29-2011 076





Progress in Collegetown?

9 03 2014

cafd3

Given the chance to look back at high-value projects over the past 30 years, one would find that, until the past several years, the list would be dominated by projects in Collegetown. Reasons abound- quoting developers, students “are looking for quality“, while increasing land values (comparable to downtown Los Angeles) have persuaded property owners to upgrade their stock and maximize their returns. The city has in general promoted Collegetown redevelopment since its slummier days, with relaxed policies in the 1980s and a couple of brief moratoriums allowing for reassessment (ex. the moratorium of 1999/2000, when the newly-built 312 College Avenue rubbed some locals the wrong way).

As of late, though, development in the Collegetown area has tapered down. There have been a couple projects over the past several years: 309 Eddy was completed in 2012, and 320 Dryden in 2008. If you want to stretch it, you can add 107 Cook, but that has less bedrooms than the building that burnt down. The big glaring omission here is Collegetown Terrace, but that is being built just outside of what is traditionally considered Collegetown.

A big factor in all of this has been the uncertainty in Collegetown’s zoning. Since about 2008, Collegetown’s zoning has been in flux. The city and Cornell paid about $200k for an urban planning company (Goody Clancy) to design a plan, which came out in 2009. The  project freaked out some residents and local politicians, who saw it as too dense and too much, period. Then the planning board went and took it in the opposite direction, proposing zoning that would force smaller buildings and reduced density. I made a b*tchy little rant when that happened. Since the old images can’t be blown up (I had an issue with that for a while back in 2009 or so), the numbers for the Goody Clancy plan can be seen better here on page 161. I’ve been unable to find another copy of the first revision, not that it specially matters since the plan was accepted, repealed in 2011 after a potential lawsuit from landowners, and has been revised seemingly a dozen times since, debating everything from the necessity of porches in certain zones, to the tremendous fight over maximum heights on the intersection of College and Dryden (90′ in the GC plan, 60′ for first revision, now 80′), to parking and encouraging townhouses. After much back and forth, something is now finally in place.

The final version is the Collegetown Area Form Districts guideline, the implemented form of the plan. The key thing with the is plan is the form-based zoning; traditional zoning focuses on regulating use and overarching parameters (lot size, density), form-based zoning scrutinizes design. Form-based zoning has been popular in new urbanism for encouraging walkable, mixed-use communities, an early example being Florida’s Seaside community.

cafd1

The plan has six zone types, each with its own tweak on the design guidelines. CR-1 to CR-4 are increasingly denser forms of “Collegetown Residential”, MU-1 and MU-2 are mixed use, with active street engagement through ground floor commercial or public uses.

cafd2

Compared to the Goody Clancy plan, the Dryden/College core isn’t as dense, but the floor count and maximum heights are even higher than suggested in some spots, for instance College at Bool Streets. But the primary focus of the plan is on the design of buildings. CR-1 and CR-2 will be large house forms with pitched roofs, CR-3 for 2-3 unit large homes/duplexes. CR-4 accommodates large houses, townhomes, and small-to-medium size apartment buildings. MU-1 welcomes medium-sized mixed use structures, while MU-2 is for the largest mixed-use buildings, up to 6 floors and 80 feet in height (think 403 College for example). Worth noting, most of Collegetown Crossing falls into MU-2, but the back end edges into a CR-4 Linden Avenue property also owned by developer Josh Lower. Since CR-4 is residential only, the difference would force him to make a redesign to reduce the building’s footprint, but at least parking will no longer be a concern. This December 2013 article says that required off-street parking was removed from CR-4 and the MUs, but I still see it listed in the guidelines as “required off-street parking” under accessory uses. Hopefully it’s just my paranoia; the IJ also said the parking reqs were also waived for the MUs when the plan was adopted.

The Sun, the IJ and other articles note the “strong support” for the plan. I can only hope, after six years and hundreds of thousands of dollars and countless meetings, that the city will have something to show for its efforts. Housing is only getting tighter in Collegetown, and developers are simply looking outside the core for their projects, so to have some guideline in place will hopefully spur some investment into Collegetown’s poorly-maintained and underutilized properties.





Making Room(s) at Collegetown Terrace

21 02 2014

7-26-2013 018

Here’s an interesting concept coming out of Collegetown Terrace: A proposal to exchange some of the interior parking for more housing. This info comes courtesy of the city of Ithaca, which will have to grant a zoning variance in order to let such a change proceed.

The last phase of Collegetown Terrace (phase III)  is slated to begin later this year, with construction complete by summer 2015. Phase III is supposed to focus on the construction on the last building, #7 (formally known as 120 Valentine Place), a long, curving building very similar to  the currently underway #5. The whole complex as-is provides 1177 bedrooms and 699 parking spaces (5 more than legally required). However, the developer (Novarr-Mackesey) has noted that only about 50% of tenants utilize parking, which means about 100 will go unused (guest parking tends to only make up a very small % of lot use). They have put forth a rather unusual proposal where the second floor of parking for building 7 would instead be 80 units of dorm-style housing: all tenants get their own bed and bath, but share kitchens and community spaces. After reconfiguring some two-bedrooms to three-bedrooms, the net gain of units is 69 (from 178 to 247 in Bldg. 7).  The current buildings, #5 (112 Valentine, 167 units) and #6 (113 Valentine, 71 units) would be unchanged. Zoning calls for 703 parking spaces in the new setup, the develop wants to put in only 652, which they claim it would still result in 50 underused spaces. So here we are. I know even the regulated 9 additional spaces for 80 more units seems a little unbalanced, but the unit reconfiguration and the small square footage of those “dorms” allow it to be so. Changes to the exterior are expected to be minimal.

At a glance, this is a nifty idea – the dorm units are expected to rent for about 50-67% the cost of a typical studio or one-bedroom in the complex (which looks to be around $1000, so $500-$670 for these). Since Collegetown Terrace mostly appeals to wealthier echelons, this sort-of mixed-income aspect is appealing, and it gives a different group of landlords increased competition for tenants; also, it makes for a denser parcel, and does a favor to those seeking to buoy business in Collegetown, and avoid more home-to-rental conversions. However, I doubt the neighbors will be amused (some are not fans of having so many college students gathered in one complex), and the parking discussion (which so far is based only off “experience”) will be reviewed with a figurative magnifying glass. I feel like this project could be a major test-bed of the city’s evolving views on parking requirements.





Collegetown Terrace Progress Photos, 12/2013

6 01 2014

I always carry a second set of charged batteries on me when I do these little photo tours, because the last thing I want is to have my day cut prematurely short, or pay out the nose for a new pack of AAs (I rotate through two sets of rechargeables, for the record). It doesn’t help me much when I leave the extra set on the passenger’s seat of my car, which is parked way up on Pearl Street. I was cold and soaked to the bone by the time I finally finished getting all the shots I wanted. Here, there are not only construction photos, but also shots from some less familiar angles of the project.

It still astounds me when I think of the numbers associated with this project. Seven buildings over 12 acres. The net increase in bedrooms is 589 (1,226 total, in at least 610 units). The construction cost exceeds $70 million. Using the Danter study (which assumes a 98-99% occupancy rate), that would mean 580 more residents in this area (although given the intended market, it’s mostly re-appropriation of tenants from other parts of the county). That’s more than the population of nearby Freeville. Certainly, the project has been fraught with contentious debate since it was first proposed. As development goes, it’s the proverbial 800-pound gorilla.

Buildings 5 and 6 are well-underway, heading towards a completion/occupancy date of August 2014; building 7, which is very similar to building 5 but further south (i.e. deeper into) on the property, will be constructed in the 2014-2015 timeframe.

1-2-2014 318

1-2-2014 319

1-2-2014 320

Building 5 and the elevated walkway.

1-2-2014 321

1-2-2014 322

1-2-2014 323

1-2-2014 324

1-2-2014 325

1-2-2014 326

Building 6, complete with winter-friendly plastic wrap.

1-2-2014 327

The rear addition of the George C. Williams House.

1-2-2014 330

The “Mithcell Plaza“, which incorporates elements from the locally-relevant Delano House that was demolished to make way for the project.

1-2-2014 329

Vinyl-tastic. I thought these were supposed to be metal panels…?

 

1-2-2014 328

No one mind me, I just needed a place to briefly dry off.





Collegetown Terrace Update 7/2013

27 07 2013

Taking a page out of Ithaca Builds’ format – breaking these up to reduce wordpress photo drag. I had exactly 90 minutes to try and hit as much of Ithaca as possible before getting back on the road; I didn’t see everything I wanted, but I hit a lot, and I’ll be sharing those photos over the next few days.

Phase 2 for Collegetown Terrace is nearing completion (units will have their first tenants next month), and phase 3 is underway with a targeted completion date of August 2014. Phase 2 consists of buildings 3.1, 3.2, 3.3, and 3.4. Phase 3 will have buildings 5, 6 and 7, and these buildings will be similar in appearance to phase 2.

7-26-2013 013

7-26-2013 014

The large glassy entry pavilion (where the fitness center will be, if I remember right) is largely complete, Any work left at this stage would likely be cosmetic details such as finishes.

7-26-2013 025 7-26-2013 024

Since I’m not the biggest fan of modern architecture, I was a little nervous about the facade treatment when it was first proposed. The metal tiles don’t look half bad, as the landscaping grows in they’ll blend into the environment more nicely.

7-26-2013 016 7-26-2013 015

The George C. Williams house has been sympathetically renovated, although the addition to the back is rather incongruous.

7-26-2013 018 7-26-2013 019 7-26-2013 020

Building 3.4 is quite massive, although the north facade attempts to make the structure seem a little less mammoth. The south side, deeper into the gorge, makes less of an effort. Building 5 can be under construction in the above image.

7-26-2013 021

This guy totally struggled to turn into the street. On that note, I struggled just trying to cross the street. I will be quite relieved when the reworked intersection of State and Mitchell is in place.

7-26-2013 023 7-26-2013 030

The buildings from Phase 1 are growing out their landscaping and appear to be faring all this construction rather well.

7-26-2013 026 7-26-2013 029

Not quite sure what the red-and-white checkered flag means, it could be a warning symbol or a company symbol, like the topping pine tree seen with some construction projects.

 

 

 





Collegetown Construction Photos, Spring 2013

9 04 2013

4-8-2013 198 4-8-2013 199

The last time I rolled through around Thanksgiving, the Vine Street Cottages projects had two homes complete and a third underway. 4.5 months later, and the third home is complete, but the project has shown no further development. 3 homes of 29 is not a particularly auspicious sign, especially when all of the for sale signs nearby had no “sold” stickers slapped on. They’re nice homes, but it’s not easy justifying paying $300k+ when older homes of similar design are going for 100k less five minutes away.

4-8-2013 173 4-8-2013 171 4-8-2013 170 4-8-2013 168 4-8-2013 166

I still cannot get over how massive the Collegetown Terrace project is. It just dominates the terminating views along the State Street corridor. The work underway at the moment is for Phase II, set to be complete this summer. Phase III will not be as visible, as those buildings will be built closer to the gorge. One thing I did realize in taking photos was that it was extremely difficult to cross East State Street, a sentiment shared by a couple of residents who were cursing loudly while trying to cross the busy road. Thankfully, improvements to the road will be made to make it more pedestrian-friendly, including reworking the traffic lanes/island and adding crosswalks. The entire project will be complete in Summer 2014.

4-8-2013 190

Which by that time, I would not be surprised to see Novarr-Mackesey initiate plans for the former Palms property and its neighbors, all of which are owned by the development company.

4-8-2013 183

107 Cook looks to be complete.

4-8-2013 184

Maybe someday? Hopefully.

4-8-2013 177

604 East Buffalo Street. Not long ago, it was home to the Crossroads Life Center, a Christian Fellowship organization. Crossroads sold the property in December 2012, anticipating a move to a newly-constructed property that appears to be in substantial need of donations in order to actually happen. Meanwhile, WVBR bought the building for its new studio, moving out of its current digs near East Hill Plaza. In the same vein, the station is in the middle of a capital campaign to renovate the structure for their needs, to the tune of $935,000. The naming rights have been bought in full by left-wing gadfly Keith Olbermann’ 79, whose donation was partly in honor of deceased classmate Glenn Corneliess.  Hence, Olbermann-Corneliess Studios. the station expects to move in by the end of fall 2013.

4-8-2013 196

Apparently, Pontiac 1000s still exist in the Northeast. Growing up in a family with multiple mechanics, I knew as a child that owning this car, or more commonly its Chevette sibling, pretty much meant you gave up on life. Bravo to the person who’s kept one going this long, well after repairs would be worth more than the car itself.





Creeping in Collegetown

26 03 2013

12-29-2011 073

I have never understood, nor will ever try to understand, the fascination some have with invading the privacy of young college women in their apartments. A recent Cornell Sun article notes a case where a former Cornell student entered two apartments in the 312 College Ave. apartment building uninvited. These apartments were occupied by female students, who screamed and/or confronted the guy, causing him to flee. Apart from the obvious threat a guy like this poses, I couldn’t help but think that events like these have been going on for a while now.

My first thought was the “Collegetown Creeper”, a story that I already knew from when I was growing up north of Syracuse, because that’s how much of a media sensation it was. The creeper was tied into at least 18 cases, occurring in 2003 and 2004. Most of the earlier ones were cases of peering through windows into the apartments of young females. Then the creep factor was kicked up a notch in early 2004 when he would break in and watch them sleeping. By the end of his reign of terror, he had graduated to full-blown sexual abuse. At least one victim claimed her clothes were cut off and baby oil was poured onto her. As one might imagine, this created quite a stir, and by the fall of 2004, students were protesting outside Common Council meetings, demanding further action be taken on the issue.

The creeper was eventually arrested in late October 2004. The suspect was identified as Abraham Shorey, who at 23, a married father of six, and sporting Rastafarian-style dreads, seemed as unlikely a sexual criminal as any. Shorey was familiar with the Collegetown area and its crowds, as he worked as a cook over at The Nines. Before his arraignment on charges of burglary and sexual abuse, Shorey posted baiand fled the area. He managed to avoid arrest on two occasions  by producing fake IDs throughout his time as a fugitive. He was finally arrested a year later in San Diego, where he plead guilty to assault with intent to rape a San Diego County woman in May 2005. DNA evidence collected at the scene of the San Diego incident linked him as the perpetrator of the events in Ithaca from the previous two years. His sentence in California is seven years and four months, but the charges against him in New York were dropped for a number of reasons (time elapsed, difficulty locating witnesses, etc.)

Unfortunately, much worse has also occurred. Although technically not Collegetown, a 25-year old graduate student was raped and murdered near North Campus in May 1981, her body then dumped into the gorge. Her killer would graduate and go on to commit seven more murders in downstate NY and CT before being arrested.

Ignoring all the insensitive jokes students make about “forcible touching” here, female students at Cornell have every reason to be concerned for their safety, in the past, now, and for the foreseeable future.





Beating a Photo Limit

30 11 2012

So apparently, wordpress limits the number of images included in a post now; swell.

11-24-2012 170

This wooded plot of land at Thurston and Highland is slated to become another apartment complex, this one housing 36 units.

11-24-2012 171

First covered in one of my very first entries, and then again when Warren Real estate earned the (in my opinion, unenviable) task of selling it. A former Sigma Alpha Mu fraternity house, the building was more recently home to Phi Delt’s annex and Theta Xi’s failed colony. The structure has been renovated and appears to be a large apartment house at this point. Not too shabby.

11-24-2012 163

11-24-2012 166

11-24-2012 164

11-24-2012 165

Collegetown Terrace. Perhaps the biggest visual change from the street was the stripping down of the historic Williams House, which is being renovated to its original dimensions and revitalized as part of the project. Further in, the foundation and parking garage facilities are being laid for the larger, more adventurous apartment buildings of Phase II. This section will be completed by next August, with phase III, with more shiny and overly modern apartments, completed  the following year.





Thanksgiving Construction Update, Part I

30 11 2012

It has occurred to me that when I hop between construction sites, I could possibly be construed as the worst driver on the planet, because I look to get as close as possible, parking or drive-by, without a whole lot of attention to anything around me. So it hardly seems appropriate that my first police ticket ever was last night, driving home through a town I’ve never been in before in my life, where the detour sign for the bridge I needed to cross was knocked askew, and I tried to make my way back to the state highway. According to the police officer, I went through a stop sign, and upon driving back to take photos this morning, I still have no idea which intersection he’s referring to on the ticket (it only gives one street). This will be a weird day in traffic court.

Bad luck, or karma. I suppose it’s one of the two.

Anyway, the below photos were taken the day after Thanksgiving, driving back down 81 heading downstate. Since Ithaca’s only a 25 mile detour each way, carpe diem.

11-24-2012 138

Checking out Lansing first (as it’s closest to where I get off from 81 southbound), I didn’t notice much in the way of large-scale construction as expected for the new senior homes next to the BJ’s. Although, a utility building did appear to be under construction, seen here on the left side of the image. Update 1/10/13: Only now do I find out this is a new fire station under construction.

11-24-2012 140

Not too far away, the woody lot behind the Triphammer Mall is slated to be home to a 3/4 story apartment building.

11-24-2012 143

Over at Cornell, the mostly-subterranean addition to the Law School is well underway. This is but the first phase, with a completion likely in late 2013/early 2014.

11-24-2012 145

11-24-2012 144

11-24-2012 154

The steel frame of Gates Hall is mostly complete, wish some interior framing underway. The new computer science building, with 101,000 sq ft, will be completed late next year.

11-24-2012 147

The green roof is being laid for the new classroom attached to Fernow Hall. Renovations on Fernow and Rice continue through 2015.

11-24-2012 148

11-24-2012 151

The new Stocking Hall/food science addition once again wins the award for “hardest tarp to see through”, a thick black burlap secured fastened to the construction fence. This is why photo number two had to be taken by sliding the camera lens underneath the metal mesh. The new building will be completed roughly next summer, with renovations of the older parts of the Stocking Hall complex to continue into 2014.

11-24-2012 152

11-24-2012 153

The new building for the Big Red Band appears to be undergoing foundation work, and working were on site when I visited. Being a small, 4,700 sq ft structure, the completion date just a few months away seems fairly appropriate.

11-24-2012 155

11-24-2012 156

Heading into Collegetown, the Belle Sherman Cottages project has advanced a little further, with a second home complete and a third well under construction (workers were pouring the base for the garage as I walked by). I checked the other lots for “sold” signs, and although some of the land appeared to be disturbed enough for additional foundation work, I did not notice any more sold lots, so this home may be the last built in the near-term.

11-24-2012 159

The new townhomes at 107 Cook Street are undergoing the last of their exterior work, and will probably be complete by the end of the winter. The two townhomes offer 12 bedrooms total, one less than the destroyed apartment home they replaced.

11-24-2012 157

This seems like bad planning.

11-24-2012 161

The concrete bunker of a building still stands solemnly, awaiting news on whether the new Collegetown Crossing building will be on site.

11-24-2012 172

Ithaca Gun. Still empty since construction/remediation stopped in August due to cost overruns, and seemingly as polluted as ever. At this point, you’ll have to tear out a section of the Earth’s crust to get rid of all the pollution.