The north wing of the Maguire Ford-Lincoln dealership is about as gutted as it can get, with nothing left but the foundation footers, the concrete slab, and the structural steel.

New rebar is being kept on site for the foundation slab of the new additions, with a steel mesh likely intended for the concrete pour. The mesh will be laid into the excavated footprint and used to strengthen the concrete as the slab hardens. It’s a little hard to tell from a distance (the fencing perimeter is quite large, given that some of the site is still actively in use for car sales), but it looks like wood forms have been assembled for pouring and curing of the foundation walls and footers for the northwest addition – the northeast addition is not so clear, because the large soil mound blocks it from view. The trailer on site belongs to Breton Construction of Attica, perhaps for subcontracted excavation or foundation work. G. M. Crisalli & Associates is the general contractor.

The last I checked (drive-by a few weeks ago), work had yet to start on the new Maguire Nissan in the village of Lansing. Nissan will relocate from this site to their new showroom across town when it is ready in about a year. (It’s a strange combination of automakers. Ford and Nissan shared design and mechanical work on the Nissan Quest/Mercury Villager minivan back in the ’90s, but I can’t think of any other overlap between the brands.)

Project information and a detailed history and description of the Maguire Ford-Lincoln reconstruction can be found here.

Final site plan.


Actions

Information

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s




%d bloggers like this: