Hilton Canopy Hotel Construction Update, 4/2018

5 05 2018

Construction continues on the Canopy, but the plans are in a state of modest flux. The fiber cement panels were changed to a different manufacturer, which uses a different paint supplier. The original Cem5 fiber cement panels use Swiss Pearl paints, while the revision proposes Nichiha panels using PPG paints. The replacement colors are very similar.

However, the dull yellow “Applesauce Cake” accent panels (itself a replacement for Cem5 “Carat Topaz”), was rejected by Canopy. The replacement color, a charcoal grey “Dark Ash”, was disliked by the board, so the project team is still trying to determine a suitable color replacement with enough to get the order filed with the manufacturer without delaying the construction timeline. I wonder if, given the orange Canopy logo and branding, if a soft “rustic” orange shade might be available? The thought being that it would tell visitors quickly that this building is a Hilton Canopy, and a warm, subtle shade would brighten the facade without being obnoxious. From what I see, one can custom order panels, which is no doubt more expensive, but I’m not seeing a list of standard colors anywhere.

While excavating, the project team did find some small fragments of the Strand Theater, which stood on the site until its demolition in 1993. The “most decorative” pieces are going to be used in a display inside the hotel lobby, and further consideration is being made for an exterior mural.

The landscaping is being tweaked to extend a sidewalk through the property to Seneca Way, as well as a curb-cut and smaller planters to fit within the property line. A pair of ginkgo trees planned for the property are being replaced with some dense shrubs and perennial instead. This is the eleventh version of the project I now have on file. Background info and specifications can be found here.

The hotel has completed foundation work and is up to the second floor. The steel skeleton and elevator cores/stairwells continue to rise, with thinner exterior steel stud walls on the ground floor and fireproof gypsum panels on the second floor. The finished product should be coming onto the market in about a year.

 


Actions

Information

2 responses

5 05 2018
CornellPhD

I like your idea for the orange color; maybe it would work. White (even if just a sub for “color TBD”) also doesn’t look bad in the rendering. I do think now that the project is being realized the limitations of the lot lines are even more glaring. That Contemporary Trends loading area is really preventing this building from filling out the street wall. Oh well.

7 05 2018
L Vader

I’m no builder, but don’t the elevator tubes have to go up first? And don’t they usually do all the framing before they start the siding? It looks like they’re aiming for a two-story building there!

Leave a comment