Belle Sherman Cottages and Boiceville Cottages Progress, 12/2013

3 01 2014

Over my New Year’s holiday, I passed from Albany to Binghamton to Ithaca, to meet with someone and carpool west to Buffalo. This gave me a few hours to kill waiting for that person to arrive, so…carpe diem.

1-2-2014 300

1-2-2014 299

I really don’t care for the finish on the new cottages. It makes them look prematurely aged and gives them a less inviting appearance vs. their older cohorts.

1-2-2014 302

1-2-2014 301

Compared to the last photos, the cluster in the left of the second photo from top is now complete, with slab foundations in place for the next dozen cottages. I suspect these will mostly be built during the spring.

1-2-2014 304

Notably, when this day started, it was raining and in the low 40s.

1-2-2014 307

Next up were the Belle Sherman Cottages (a.k.a. Vine Street Cottages) on the east edge of the city.

1-2-2014 306

The “craftsman bungalow” on lot 19 is nearing completion, from the looks of it.

1-2-2014 308

Meanwhile, another house will be starting construction in the near future. This one looks to be lot 14, another “Victorian Farmhouse”, like the beige home in the lead-in photo. I wonder how many homes will have to be sold before marketing starts for the townhouses?

1-2-2014 305

As a quick side note, I noticed the grassy lot next to where I usually to park my car is now occupied by a two-story home. It’s not the same as the spec home proposed in the initial ad (the lot sold last August), but this house doesn’t look half bad (the entryway seems a little spartan).





Another Apartment Complex Considered for Cornell Heights

26 12 2013

100_1394

Original concept description with renderings here, meeting minutes here. The project is a in-the-works proposal by Campus Acquisitions LLC, the design by Shepley Bulfinch Architects of Boston. Campus Acquisitions, if I have this correct, looks to be a Chicago-based investment group with projects generally clustered around Chicagoland, and a number of college towns along the West Coast and Interior West.

The parcels of land in question are “150 and 152 Highland Avenue”, an underutilized lot (152), and a bungalow built in 1920 (150). The bungalow appears to be a 2-unit home owned by Travis Hyde properties. 152 Highland is a heavily wooded, steeply graded vacant parcel, but has a little bit of Cornell lore associated with it, as it was home to Phi Kappa Sigma’s swimming pool (the house, named “Greentrees”, is now Pi Kappa Phi, the pool is now unused and decaying). The 2.49 acre parcel was originally bought in 1996 by Travis Hyde properties with the intention of apartments, but nothing came of the parcel. The property was on-again off-again in local real estate listings (asking for 200k), and was last delisted (sold?) in June 2012.

ridgewoodapts3

The image above uses one of the old design concepts. The bungalow is proposed for renovation, though I am not sure what role, if any, Travis Hyde properties has in the development (something in conjunction with the other parcel, maybe?). The original conceptuals for “1 Ridgewood” proposed as many as 70 units, later reduced to 64 units (four floors over an underground garage) in the first design proposal, released this past fall:

ridgewoodapts1

ridgewoodapts2

This didn’t work for multiple reasons. For one, many of the deep-pocketed local land owners are strongly opposed to more development; I’ve known for years that the venerable widow who owns the house south of the property on Highland (she was a fixture at my fraternity’s annual wine-and-cheese event, and a pleasure to chat with) has been fiercely opposed to any construction on that site. For two, the property is in the Cornell Heights historic district, which subjects it to more stringent and evolving design and massing guidelines. The latest concept calls for 45 units in 3 smaller structures, with a mix of surface and underground parking. At some point in the near future, the formal proposal will likely appear on the planning board’s agenda.

100_0563

 





The “Greenways” Project

23 12 2013
Image property of Greenways at Eastwood Commons

Image property of Greenways at Eastwood Commons

Back around September 2012, I posted an entry detailing a project proposed for the Eastwood Commons area southeast of Cornell’s campus, off of Honness Lane. The project, which involved the construction of 67 townhouses, was the result of a partnership between Cornell and a private company, the land would be bought from Cornell, and Cornell employees would get first dibs on the housing. At the time, the project didn’t have a name, so colloquially I had referred to it as the “Cornell townhomes project”.

Fast forward to this past spring. From someone who owned a townhouse in Eastwood Commons, I had been told that the project was a stalled proposal; the infrastructure costs had been underestimated, and would have priced the townhouse units out of the $200k price range that they were intended for. Not feasible, therefore no development. Which apparently made the nearby residents very happy.

Last week, I had noticed INHS had revamped their website. One of the projects listed was Greenways, described as “a new townhome community in the town of Ithaca”. I was not familiar with the name, an initial internet search didn’t turn up anything, Jason at Ithaca Builds wasn’t familiar with it, so my first inclination was to think this was some sort of new proposal along the lines of INHS’s Holly Creek.

A second search, playing with different search terms, turned up a Cornell Sun article on the Cornell townhomes project. It mentioned two details I had long-since forgotten – one, INHS was offering subsidies to the developers for construction costs (to keep the units in the affordable range), and two, the developer’s name was “Greenways at Eastwood Commons”.

So, maybe the project isn’t a stale proposal, and some work is going on behind the scenes to allow the project to come to fruition. It’s supposed to have a 5-year buildout, but there have been enough projects cancelled or postponed in recent months to make me cautious until I at least see shovels start going into the ground.

12-17-2013 084





How Does One Fill A Former Sorority House

8 12 2013

Image property of O’connor Apartments

This one was forwarded to me by an observant reader, L.D. It’s a listing on Craigslist for rentals available for June 2014 at 114 the Knoll (I always thought it was 115 the Knoll, but the listing photo matches my photos), which has served as a chapter house for a few different sororities over the years, the last being Alpha Xi Delta, which moved to another house on Ridgewood Road in 2010. More recently, the house has been occupied by a campus Christian group, Chesterton House. Chesterton’s house website notes a 2014 goal for purchasing a property near campus to serve as their permanent home, and I’m assuming that if this posting is up, then there’s a strong chance they succeeded in achieving that goal (if anyone knows where they decided to settle, feel free to comment or email me).

Quoting the listing:

“Beautiful arts and crafts house on North Campus available for June 2014. $750 per bedroom for 16 bedrooms plus utilities. Can hold up to 22 for the same price. Large living room with leather furniture. Banquet size dining room. Cook’s kitchen. You have to see to believe. Use [sic] to be a sorority. Email or call [redacted]”

This seems like a more unusual, and perhaps somewhat more difficult way to fill a large group home. Although the email links to the O’Connor Apartments property group, I don’t see it in their property listings, and I think they’re only handling the rental aspect of the house on behalf of another entity. My guess is that Delta Phi Epsilon sorority still owns the property, and with no short-term prospects of restarting their chapter, they need some way to try and keep revenue coming in for upkeep of the house. On one hand, they could sell to Cornell, which takes care of the tax issue, but then they’re at Cornell’s mercy – the house most likely becomes a dorm and there’s nothing Delta Phi Epsilon would be able to do, especially since they’ve gone a decade without an active chapter (there were attempts to re-colonize about three years ago, which did not materialize – the whole process being the subject of enough gossip at the time that one could have written a book about it). Yet another option is another private sale, like the home at 210 Thurston that was sold a couple years ago to the wealthy parents of a Cornell wrestler, renovated, and now serves as the home of Cornell wrestling team.

This is one of those houses that seems to routinely pass between groups at Cornell. I’ll be curious to see what happens.

Edit 1/23/14: Maybe I’m wrong about DPhiE still owning the property. I forgot that it was listed in July 2009 and sold in January 2010. Perhaps now the O’Connor Apartments firm owns the building.





Dear Cayuga Place, Please Settle On A Design

17 08 2013

cayugaplace_v5

This building has become the bane of this blog’s existence. From the Planning Board:

The applicant is requesting modifications to site plan approved on August 28, 2012, including: a reduction in the site footprint to 6,920 SF (from 9,400 SF); an increase in total floor space to 49,244 GSF (from 47,075 GSF); an increase in the number of stories to 7 (from 4); an increase in the number of units to 45 (from 39); a reduction in the height of the first‐floor elevation to 409’6” (from 410’); a reduction in floor‐to-floor height to 11’4”without mezzanine loft (from 15’6” with mezzanine loft); an increase in total building height to 81’4” (from 63’6”);the addition of 21 unit balconies and 18 false unit balconies; the addition of 4 unit walk‐outs; and the use of auger‐ grouted steel core displacement piles for the foundation (from a spread‐footing foundation).

So in sum, a taller building with a smaller footprint is being proposed, with a few more units of apartments. The gross area only changes slightly, and the ceilings aren’t as high as before. Given the prelim renderings of this latest version, the general design elements remain the same, although at just over 81 feet tall, the building should now fully mask the wall of the parking garage next door.

So let’s see here…here are original renderings v1, v2 and v3….an updated version of V3, v3.1 if you will….v4…..and now this latest one, which we’ll call version 5. This building has changed its “image” more times than a teenage girl.

At least with the current revision, the change may have been less for market concerns, and more out of engineering concerns. Note the change in the type of foundation; spread-footing foundations are shallow foundations, which spreads the weight out and doesn’t go as deep into the soil (you often see these in flood-prone areas). The replacement is a deep foundation, which is selected when the soil is poor in the shallow layer. My guess is that they were doing site testing, the near-surface soil was worse than expected (perhaps due to the presence of Six Mile Creek), so Bloomfield and Schon decided to build upwards on the more stable portion of the parcel, rather than out. Deep foundations are usually more expensive, which could explain the increase in number of units.

Will this be the incarnation that actually gets built? Good question. I’m kinda tired of flavor of the season, so I’m kinda hoping it just goes up already.





Collegetown Terrace Update 7/2013

27 07 2013

Taking a page out of Ithaca Builds’ format – breaking these up to reduce wordpress photo drag. I had exactly 90 minutes to try and hit as much of Ithaca as possible before getting back on the road; I didn’t see everything I wanted, but I hit a lot, and I’ll be sharing those photos over the next few days.

Phase 2 for Collegetown Terrace is nearing completion (units will have their first tenants next month), and phase 3 is underway with a targeted completion date of August 2014. Phase 2 consists of buildings 3.1, 3.2, 3.3, and 3.4. Phase 3 will have buildings 5, 6 and 7, and these buildings will be similar in appearance to phase 2.

7-26-2013 013

7-26-2013 014

The large glassy entry pavilion (where the fitness center will be, if I remember right) is largely complete, Any work left at this stage would likely be cosmetic details such as finishes.

7-26-2013 025 7-26-2013 024

Since I’m not the biggest fan of modern architecture, I was a little nervous about the facade treatment when it was first proposed. The metal tiles don’t look half bad, as the landscaping grows in they’ll blend into the environment more nicely.

7-26-2013 016 7-26-2013 015

The George C. Williams house has been sympathetically renovated, although the addition to the back is rather incongruous.

7-26-2013 018 7-26-2013 019 7-26-2013 020

Building 3.4 is quite massive, although the north facade attempts to make the structure seem a little less mammoth. The south side, deeper into the gorge, makes less of an effort. Building 5 can be under construction in the above image.

7-26-2013 021

This guy totally struggled to turn into the street. On that note, I struggled just trying to cross the street. I will be quite relieved when the reworked intersection of State and Mitchell is in place.

7-26-2013 023 7-26-2013 030

The buildings from Phase 1 are growing out their landscaping and appear to be faring all this construction rather well.

7-26-2013 026 7-26-2013 029

Not quite sure what the red-and-white checkered flag means, it could be a warning symbol or a company symbol, like the topping pine tree seen with some construction projects.

 

 

 





130 East Clinton Street – Proof Ithaca Has Room To Grow

15 05 2013

Rounding out the trifecta of major developments from which I’ve learned where to obtain renderings and elevations, thanks to the guys at Ithaca Builds. 130 East Clinton (click for PDF) is the latest project of local residential overlord Jason Fane, consisting of a 3-building, 36 unit project built into the hillside right next to the IPD Headquarters.

130eclinton1

The design of the buildings come from the regionally prolific Sharma Architects, the same firm responsible for the large majority of the midrises that occupy Collegetown. Nothing particularly exciting about these structures, some minor variations in the third floor exterior facade, and some sort of structure between each 12-unit building. The project will add 36 bedrooms and 12 studios to the growing downtown core.

130eastclinton2

Construction is slated to start this fall and run through to mid-2014.

 





The EcoVillage

9 05 2013

4-8-2013 350

Although I take a lot of jabs at “hippies”, the reason I never made it to Ecovillage before now had less to do with any personal stance and more to do with the fact it was just out of my way. Rachel Carson Way lies about a mile and a half westward of Inlet Island, nestled in the hills opposite from Cornell. This means that when I past through, it’s farthest out of my way, so time often being a priority, it always sat on the bucket list. Finally, I made the conscious effort to take a trip up on my last photo tour.

4-8-2013 353

Ecovillage runs on the concept of co-housing, which in many ways runs close to most people’s idea of a commune (and mentally, I still find myself referring to it as a commune). There are optional shared dinners, a community-based work system, and of course, being in tune with the natural environment. Hence, solar arrays, housing designed to minimize energy use, foods grown on the property,  and so forth. Ecovillage isn’t unique, not even in Tompkins County (White Hawk in Danby is a smaller but similar concept). But it is probably one of the best known developments of its kind.

4-8-2013 354

Ecovillage began planning in 1992-1993, when stakeholders purchased a former farm with the intent of launching an eco-friendly community.  The first neighborhood, FROG (First Resident Group), began construction in 1995 and was completed two years later. The second community, SONG (Second Neighborhood Group), received site plan approval in 2001, and was built in three phases over five years. Each of these neighborhoods has 30 units with a community center. The community also has a few other bells and whistles, like a passive bus shelter, a root cellar, carports and a berry farm. The pre-Ecovillage farmhouse and barn are now a separate property holding an antique shop and the City Lights B&B.

4-8-2013 352

Ecovillage is well underway with its third neighborhood, TREE. At 40 units, TREE is slightly larger than the first two neighborhoods. Construction is definitely underway, and the majority of the community should be complete before the end of the year. Also worth a quick note, a 900 sq ft “Gourd Workshop” was under construction when I passed through. More additions, like an education center and a roadside farm stand, are in the works.

4-8-2013 351

If you don’t want to be a creeper like me, Ecovillage opens itself up for a free public tour at 3 PM on the first Saturday of each month. That way, you can avoid being like me, trying to take photos when kids keep wandering in front of them, and having that awkward realization that you look like a child predator.





The Storybook Cottages

26 04 2013

4-8-2013 155

Several months ago, my best friend landed his dream job in Ithaca. Within the day, he was looking for places to live. I being his roommate, and trying to be as discreet as possible given my borderline-unhealthy interest in Ithaca real estate, was more than happy to listen in and offer advice.

4-8-2013 162

One of the places he checked out was The Boiceville Cottages (I’ve always assumed this is pronounced like “Boy-ss”, like the Boyce Thompson Institute on Cornell’s campus).  As multi-unit housing goes, they’re quite unusual. In general, housing is set up in single-unit cottages, clustered in groups of three. More recently, a few three-unit buildings, and a church-like meeting house have been erected. Perhaps the most obvious details are the colors. It’s like someone looked at a bright cheery children’s storybook and went to town.  Apparently, such tales were at least part of the inpsiration for their appearance, with the intricate eaves and vivid paint-jobs.

4-8-2013 157

The project is a little out of the way, about a mile south of the Caroline town hall and Route 79. So it took me a little while to swing out for a visit, and see them firsthand (my friend settled in Eastern Heights. Boo). This development further caught my attention because of the expansion underway. The Boiceville Cottages development was first initiated in 1996, and from what I can tell, it took about ten years to build the first 24 units.  Around 2007, a second phase was initiated, with 36 units. As of last year, this phase is complete (so, they definitely picked up the pace on construction…). Recently, they were granted approval for the construction of 75 more units, doubling the size of the complex.

4-8-2013 163

When I finally made it out that way a few weeks ago, I was going around taking photos, when an older gentleman in a pickup stopped and asked if I could be helped. Generally, I’m extremely cautious when I go on photo tours – on previous occasions, both Ithaca and elsewhere, I’ve been threatened with the law and with violence, so I regard every interaction where I have a camera in my hands with extreme prudence.

4-8-2013 159

The gentleman turned out to be the builder/developer, Bruno Schickel. About a month earlier, I had asked if there were any renderings or site plans online (the answer at the time was “only what’s on the website”; the link above is a site plan from a town review of the project). So I wasn’t a complete stranger. We chatted politely for a couple minutes, I told him how I thought he had a unique and creative development. He invited me to check out a display unit (which due to a long to-do list, I politely declined). All in all, I’m glad I did not get chased off the property, and my thanks to Mr. Schickel for  tolerating this random guy taking photos of his property.

4-8-2013 158





An Ever-Expanding Ithaca Apartment Hunt

4 01 2013

11-24-2012 167

So, this post relies on a question originally posed by “Steve” on the welcome page:

I wonder if you can comment on the number of new apartments being built in Ithaca from a historical perspective? It seems like there are many coming online but I don’t have a long enough perspective.

As a matter of fact, I had obtained this info several months ago for reference, from a report given to the DIA by the Danter Company regarding the Ithaca housing market’s trends, needs and projections. But I had never made much use of that data until now. Even to the casual observer, there has been an uptick in construction around and about the Ithaca area as of late. As the metro has expanded a little over 5% (~5,500 people) in the past decade, some growth is to be expected. The Ithaca market (mostly defined as Ithaca city/town with some parts of Lansing) is believed to be capable of absorbing about 1,350 units over the next five years, 25% owner-occupied (most likely condos) and 75% rental units.

As of April 2011, there were 4,793 units in 75 developments (5 others with 270 units of subsidized housing are excluded from analysis). 49% of all those units are occupied by, no surprise, students at IC or Cornell. Borrowing a table from the report itself shows the number of multi-unit projects built within Ithaca proper, broken down into separate time periods.

danter1

So, adding up the 2000s gives 654 units 14 projects. This is a substantial increase from the 454 units built in the 1990s, but somewhat less than the 824 units in the 1980s, and less than half of the 1,604 units built in the 1970s. For the curious, the project built in 2009 was INHS’s Cedar Creek on the west side of the city. West Hill accounts for over half of the new multi-unit housing built in the 2000s, with Overlook at West Hill (128 units, 2006), Linderman Creek (128 units in 2 phases, 2000/2004) Cayuga View (24 units, 2005) and Conifer Village (70 units, 2008). Collegetown also makes up a small portion, with projects like 407 College (25 units, 2006) and Coal Yard Apartments Phase I (10 units, 2007).

Now, starting around the time this left off, there have been a number of major projects. Within the 2011-2016 time frame, here’s a sample of what’s completed/under construction/planned (I’m not going to link to each one for this entry, but the curious can make use of the search bar to pull up more info from other entries):

Collegetown Terrace (U/C; usually defined with “beds”; but in terms of units, the construction company in charge suggests 246 units, but that may just be one phase). EDIT – 610 units. That’s…a lot.

309 Eddy (completed, 24 units)

Coal Yard Apartment Phase II (completed, 25 units)

107 Cook (U/C, 4 units)

Breckinridge Place (U/C, 50 units)

Collegetown Crossing (in review, 60 units).

Thurston/Highland (in review, 36 units)

Seneca Way (U/C, 38 units)

619 West Seneca (U/C, 24 units)

Cayuga Green (approved, 39 units)

Fane Properties/ 100 E. Clinton (proposed, 36 units)

Harold Square (proposed, 60-70 units)

Cascadilla Landing (in review, 134 units)

Stone Quarry Apartments (in review, 35 units)

Conifer Phase II (72 units, senior housing, site prep)

Purity Ice Cream Redevelopment (proposed, 13-26 units)

Hawk’s Nest at Springwood (proposed, 50 units)

Cinema Drive (proposed, Lansing village south of 13, 39 units)

Lansing Reserve (proposed, on the north edge of what the Danter study calls “Ithaca” proper; 65 units)

College Crossings (U/C, 2 units)

So in the Ithaca area proper, in a span from 2011-2016, I’m estimating at least 1,415 units in 20 projects. This assumes the townhomes with the Vine Street Cottages and Holochuck Homes projects are not rentals (and not included in this tally), excludes the several hundred units of housing planned in the town of Lansing (town center, Village Solars, etc.). Also, Ithaca Gun and its 45 units are not being included until that project leaves limbo.

So to answer Steve’s question- Ithaca is running well above average, and is on a pace not seen since the 1970s. Quite the uptick indeed.