News Tidbits 11/17/13: Hotels and Hazing

18 11 2013

100_1699

After a lull in new development proposals in the city of gorges, something new has come to the table.  Down in big box land, another hotel seeks to join the ten-year old Hampton Inn (66 rooms) and the recently-completed Fairfield Inn (106 rooms). According to Jason over at Ithaca Builds, the proposed “All Suites Hotel” at 371 Elmira Road calls for a 4-story, 54′ tall, 11,769 sq ft hotel with approximately 76 rooms, proposed for the site of a vacant office building and an auto body shop (both of which would be demolished). Looking at the aerial below, its proximity to the new Fairfield (upper right) is quite clear. Planning board agenda here, map of site here, site plans here, elevations/renderings here.

allsuites1

Although no brand is stated in the proposal, I suspect it might be a part of the Holiday Inn Express brand owned by Intercontinental Hotels Group. For one, the hotel is in the 60-80 room range as recently-built HIE hotels (see the recently-opened 74-room Holiday Inn Express in Cortland for example).  Reason number two, Intercontinental Hotels Group will lose its Ithaca presence once the license with the downtown property expires in January, and the Ithaca hotel market is generally strong enough that they might wish to maintain a slice of the hospitality market.

allsuites2

Although it’s pretty standard chain hotel fare, architectural work is being handled by Buffalo-based Silvestri Architects. Additional work will be undertaken by Optima Design and Engineering, also out of Buffalo (no surprise, the developer’s LLC also has a Buffalo address). Both organizations have previous experience with chain hotel construction and design.

Apart from that, other proposals in the city include a small amount of infill at the Statler Hotel, a two-family home on West Hill, and a 10,384 sq ft commercial building on Cherry Street. Ithaca Builds notes the Cherry Street proposal is a Crossfit Gym, to be housed in a rather industrial-looking 1-story structure with a pitched roof.

In other news, Cornell has beaten a proverbial hornet’s nest with a stick. The Cornell Sun published an article last Friday that the men’s lacrosse coach would be dismissed from his position.  The decision is widely suspected to be related to the suspension of the Lacrosse team from fall exhibition games after a hazing incident where allegedly freshman were forced to chug beer by senior team members. Unlike fraternities, where one merely has to wait before some chapter does something stupid, the lacrosse team is respected by its peers and a moneymaker for the university, so this seems unreasonably harsh. Given the commentary on the article, Cornell’s heavy-handed approach appears to have its share of critics. As a personal opinion, I feel the lacrosse team is being made an example of, to scare the other teams into playing nice. In the long run, I don’t think there will be much uproar until the university starts to go after large student groups outside the Greek system and athletics.  The more students who feel Cornell breathing down their necks, the more they’ll raise a hue and cry.

UPDATE 1/30/14: And it is in fact a Holiday Inn Express. I’m giving myself a gold star.





News Tidbits 10/15/13: Ithaca’s Had Better Weeks

16 10 2013

purity_design_dead

It’s weeks like this that make me want to crawl into bed.

News piece one – The only piece of news that isn’t bad.  the Holiday Inn-turned-Hotel Ithaca will be taking a little longer than expected. Not a bad thing, just the schedule being re-arranged; the old hotel portion will be renovated in phase one (November 2013 – May 2014) and keep its 90 employees throughout the process. The conference center will now begin construction in March 2014, and the new hotel tower will start construction in May. If it keeps people employed, then I’m certainly not going to complain.

News piece number two – the Purity Ice Cream apartment project is dead, as Ithaca Builds reported yesterday. The reasons cited were “market conditions”, which I’m disinclined to believe, but then, I don’t know what numbers they’re running with. The building will still be renovated and add about 2,600 square feet of office space on the second floor, including a little rooftop terrace. You’re right IB, this is a bummer.

The latest planning board agenda suggests nothing particularly new or exciting, unless you count adding space down in big-box land.

News piece number three, four, etc – The Syracuse Post-Standard seems to be having a field day running all these crime reports from Ithaca.  The nutjob looking for his lily-white nymphs seems to be a hit with the commentariat.

So…better luck next week, I guess.





News tidbits 10/2/13: Old People and Affordable Housing

2 10 2013

A smattering of news articles worth noting, but not worth going to the trouble of giving their own articles…

lanpres_canc

1. Lansing Reserve is dead. The 65-unit project slated for a wooded parcelnorthwest of the intersection of 13 and Warren Road has been bought out by the village of Lansing, which intends to use the space as a “park”. The project, originally proposed in early 2011, has been beset with issues since the first public meeting, with concerns of traffic and wetland protection and “ruining the unique of [the] village”. Apart from Wal-Mart, it’s probably the only project I’ve seen proposed in recent years that the locals created their own websites and exaggerated figures/renderings in their efforts to oppose the project. Lansing town and village seemed to have struck an anti-development tone in the past several months, with this and the cancellation of the town’s sewer project (again).

2. Meanwhile, the same two groups that proposed Lansing Preserve are now looking to develop a parcel in the town of Ithaca, on West Hill near the hospital (aka the Biggs property). The town put out a request for bids on the parcel in late summer 2012, which I covered previously. Nothing formal proposed yet, but the project is expected to contain about 60 townhomes in the affordable housing market range (30-90% of local median income). Shades of Lansing playing out here, as the anti-development Ithaca West neighborhood group has been opposed to the sale of the parcel, let alone its development (the reasons cited – traffic and an increase in crime). However, their stance pits them against Ecovillage and their connections, so this should be an entertaining show. Ithaca Builds provides more coverage here.

3. Deep-pocketed retirement facility Kendal at Ithaca is preparing an expansion of its own. The 212 unit (indepedent living) and 71-bed (assisted/skilled care) facility plans to add 24 more indepdent living units (the parcel allows a max of 250) and 13 more beds to its skilled care group. This would be achieved with the construction of a new 2-story apartment building and three new 1-story wings for the reconfigured skilled care space. Chiang O’Brien are the architects and the project should be completed in the spring of 2014. Kendal at Ithaca first opened in 1995. to by Cornell-centric readers, the only reason you might care about this is that the facility hosts a sizable number of retired CU faculty/staff.

-65+60+24 = +19 units. Well noted.

Kendal_1





Fast Facts: Cornell Enrollment Figures

20 09 2013

5-1-2012 140

Some insights via the University Factbook

– Cornell’s enrollment has grown markedly from 2002-2012, from 19,575 to 21,424 students.

totalstuenr

Which is not really the result of increases in undergrad transfers, which show no long-term trend (stays near 550, give or take a few percent).

transstuenr

Although UG enrollment has increased 3.9% over the decade (from 13,725 in 2002 to 14,261 in Fall 2012). In effect, undergrads aren’t the major growth component here.

UGstuenr

Haha, of course not. Undergrads often require aid. And the proportion of the student population receiving aid has increased over the decade, from 48 to 57 percent:

ugstuaid

Worth noting, the primary jump, from 2007 to 2009 (46.73% to 56,49%) ties in pretty well with the enactment of Cornell then-new financial aid policy, and the economic nosedive of the late 2000s.

The growth comes from our workhorses – the grad students, many of whom have stipends and tuition waivers in return for their TA/RA work:

gradstuenr

…and our cashcows, the professional students like those pursuing law degrees and MBAs, and paying out for those degrees (Fall 2013 values $57,270/yr and $55,948/yr respectively). Yes, I’m aware many business pay for their employees to get MBAs, but the point is, someone’s ponying up the cash.

profstuenr

Grad students increased from 4288 to 5049 over 10 years (+17.75%) and professional students from 1562 to 2114 (+35.34%).

In tying in to the other theme of this blog, all those grad students and professional students have to be housed somewhere, and only a very small number can find space on campus. There you go Ithaca real estate developers, there’s another positive factor in your growing market. Assuming the 2.0 figure for the average number of unrelated people sharing a unit. you get 925 units. West Campus added no new beds, so I’m pretty sure the on-campus resident population from 2002-2012 was nearly static.





The Final Draft of Harold’s Square

21 08 2013

hsrqev1

Given the previous re-design for Harold’s Square, I’m willing to accept this. The glazed curtainwall banding on the south face makes it a little less brutal on the eyes.

hsqrev2

Ithaca Builds notes that the developers hope to have fencing up (i.e. initiating site prep) by Labor Day, for completion in late April 2015.

 

 





Dear Cayuga Place, Please Settle On A Design

17 08 2013

cayugaplace_v5

This building has become the bane of this blog’s existence. From the Planning Board:

The applicant is requesting modifications to site plan approved on August 28, 2012, including: a reduction in the site footprint to 6,920 SF (from 9,400 SF); an increase in total floor space to 49,244 GSF (from 47,075 GSF); an increase in the number of stories to 7 (from 4); an increase in the number of units to 45 (from 39); a reduction in the height of the first‐floor elevation to 409’6” (from 410’); a reduction in floor‐to-floor height to 11’4”without mezzanine loft (from 15’6” with mezzanine loft); an increase in total building height to 81’4” (from 63’6”);the addition of 21 unit balconies and 18 false unit balconies; the addition of 4 unit walk‐outs; and the use of auger‐ grouted steel core displacement piles for the foundation (from a spread‐footing foundation).

So in sum, a taller building with a smaller footprint is being proposed, with a few more units of apartments. The gross area only changes slightly, and the ceilings aren’t as high as before. Given the prelim renderings of this latest version, the general design elements remain the same, although at just over 81 feet tall, the building should now fully mask the wall of the parking garage next door.

So let’s see here…here are original renderings v1, v2 and v3….an updated version of V3, v3.1 if you will….v4…..and now this latest one, which we’ll call version 5. This building has changed its “image” more times than a teenage girl.

At least with the current revision, the change may have been less for market concerns, and more out of engineering concerns. Note the change in the type of foundation; spread-footing foundations are shallow foundations, which spreads the weight out and doesn’t go as deep into the soil (you often see these in flood-prone areas). The replacement is a deep foundation, which is selected when the soil is poor in the shallow layer. My guess is that they were doing site testing, the near-surface soil was worse than expected (perhaps due to the presence of Six Mile Creek), so Bloomfield and Schon decided to build upwards on the more stable portion of the parcel, rather than out. Deep foundations are usually more expensive, which could explain the increase in number of units.

Will this be the incarnation that actually gets built? Good question. I’m kinda tired of flavor of the season, so I’m kinda hoping it just goes up already.





News Tidbits 8/11/13: Emerson’s Powerful Possibilities

12 08 2013

Image property of Welch Construction Inc.

Following up on Ithaca Times and Ithaca Builds, the big development news of the week is that a potential buyer is about to close on the Emerson Power Transmission property on South Hill. The discussions have been going on for quite a while; the last Emerson entry I wrote six months ago notes that a member of the Chamber of Commerce was dropping hints that negotiations for the sale of the property were ongoing.

The “sleeping giant” term the Times uses is certainly fitting. At nearly 94 acres and 800,000 square feet of space, the property is one of the most massive in the Ithaca metro. For the sake of comparison, the Collegetown Terrace project is redeveloping 12.4 acres (with another 4 acres of apartments being left as-is), has 610 units and about 629,000 square feet. Certainly, zoning would allow for demolition and reconstruction to suit the developer’s plan, and for this market, the possibilities are comparably limitless.

The article notes that the buyer has 12 to 18 months to choose to execute the purchase option, but they’ve committed for the time being by paying out for a multi-million dollar master plan and feasibility study. Given the span of the site, it’s no big surprise that the developer is looking into mixed use, with some residential components, and some industrial/manufacturing components. With 94 acres, there’s definitely a wide range of possibilities, and buildout will take years. But a redevelopment of Emerson could effectively mark an expansion of downtown Ithaca southward.

It appears Ithaca’s development boom has some big projects still coming down the pipeline. Or more links in the chain, if you will.





A Random Mix of Project Updates 7/2013

1 08 2013

7-26-2013 058

7-26-2013 052

7-26-2013 053

Over at Breckenridge Place, the installation of the brick facade is nearing completion, and some of the windows have been installed in the six-story building. Originally slated for occupancy this fall, it looks like this has been pushed back a few months to very early 2014, according to the INHS website. This seems reasonable, as the vast majority of interior work still needs to be completed, not to mention the rest of the facade, window installation, and finishes/landscaping. An application lottery is underway for qualifying individuals.

7-26-2013 031

Looks like I can mark Collegetown’s 107 Cook Street as complete. Developer Dan Ligouri’s four units (12 bedrooms) will welcome their first tenants this summer (June/August thereabouts).  Replacing it in the queue of small residential projects, local nonprofit INHS will be launching construction on a 4-unit townhome project at the sharp corner of South Cayuga and South Titus Streets, just south of downtown. This is in addition to the aforementioned Breckenridge, a few rebuilds/renovations they have underway and the second phase of the Holly Creek townhomes, which will add another 11 units to be completed in late 2014.

7-26-2013 066 7-26-2013 049 7-26-2013 063

Ithaca makes this almost too easy. Ithaca Builds has been keeping tabs on the Planned Parenthood development, where foundation work is underway. The other two won’t start for a few more months.

7-26-2013 062 7-26-2013 067

It sure is odd to see a treeless Ithaca Commons.  Excavation and utilities replacement will be underway through December, with reconstruction and new surfacing planned for next spring and summer.

 





Seneca Way Updates, 07/2013

30 07 2013

7-26-2013 068

My compliments to the DIA for deciding to use renderings as wall posters on the construction barriers of Ithaca Commons.

7-26-2013 048 7-26-2013 044 7-26-2013 045

Seneca Way still has two floors to go before topping out, although the stairwells appear to be fully built out.  Wall panels are in place up to the fourth floor, and the wood reinforcements on the fifth floor suggest installation will begin shortly. Seneca Way will add 38 apartments and 8,600 sq ft of office space to downtown when it is completed in Spring 2014.  The office space will be fully occupied by Warren Real Estate and the non-profit Park Foundation, which had also been looking at space in the Cayuga Green Condos before that project went all-residential.

7-26-2013 047

I assume that the Argos Inn is open for guests at this time. The landscaping is tidy and the new 13-room boutique hotel breathes life into the ca. 1831 Cowdry House, which once served as the headquarters for Duncan Hines. The last owners, non-profit Unity House  (a treatment/rehab facility), moved up to Lansing right by the mall.





Belle Sherman Cottages, 7/2013

30 07 2013

7-26-2013 010

Next on my tour was a stop at the Belle Sherman Cottages to make a progress report.

7-26-2013 007

With four homes complete (Lots 1, 7, 8, and 14), one under construction (Lot 2), and one in site prep (Lot 19), the 29-unit development (19 homes, 10 townhouses) is beginning to resemble a settled neighborhood from a few very select angles.

7-26-2013 009

 

 

7-26-2013 008

103 Walnut Street (Lot 2) is currently underway, and will be completed in the next couple weeks. Only three of the five styles are represented so far, the Victorian and Craftsman-style farmhouses have yet to be built.

7-26-2013 0057-26-2013 006

Lot 19 is tucked in the sharply-angled northern corner of the parcel, necessitating Agora LLC to insert the road extension. This extension is also where the townhouses will be built, although I’m not sure when they will start construction on those (i.e. what the sales thresholds are). Several lots are listed for sale with local RE agencies.

As noted at Ithaca Builds, these homes are built using modular pieces, which when done right can result in a quick turnaround from prep to construction to completion. It is likely the bungalow slated for Lot 19 will be completed by early fall, just as construction season starts to slow down in Ithaca.