206 Taughannock Construction Update, 4/2015

17 04 2015

Work has progressed at the site of the apartment project at 206 Taughannock Boulevard on Ithaca’s Inlet Island, where seven apartments and office space are being built from the gut renovation of a furniture store and warehouse. The changes on the exterior have been slow, but given this past winter, the focus of the past few months has probably been on the interior space.

Since November, a little more siding (best guess, fiber cement/Hardie board) had been installed on the exterior, and the industrial steel siding at the front side of the roof has been replaced with an irregularly-shaped plywood-and-housewrap structure. Looking at the window spacing, siding and trim boards already applied to the front of the building, this rooftop re-do is likely intended to break up the bulk of the old warehouse by giving the impression of individual buildings within the greater structure. It could look nice or it could look clunky, we’ll have to wait and see.

206 Taughannock was until 2014 the site of the Unfinished Furniture Store (otherwise called the “Real Wood Furniture Store“) owned and operated by the Zaharis family. From the county records, the building itself is a 9,156 sq ft structure originally used for retail and warehouse space and dated to sometime in the 1970s. The store closed last April when its owners retired, and a building permit issues a few months later. Photos of the store before renovation can be seen here at Ithaca Builds. Perhaps the biggest loss in this renovation is the removal of a rather attractive mural from the front of the structure.

20150405_142011 20150405_142023 20150405_142140

Next door, work continues on a satellite office for the Ithaca Police Department in the ground floor space of the former Lehigh Valley House, now a six-unit condominium. The Lehigh Valley renovation was done by local developer Tim Ciaschi, with design work by local architect Claudia Brenner.

20150405_142152 20150405_142305

Two more Inlet Island projects are waiting in the wings, although only one is likely to start anytime soon. The 21-unit 323 Taughannock apartment project is expected to start construction this year, but no work appeared to be taking place when I checked the site at the start of April. Meanwhile, 12 affordable apartment units have been proposed for 910 West State Street in a project called “The Flatiron”. The developers, Alpern and Milton LLC, applied for affordable housing grant funding to help finance the project. However, the IURA has deemed the project a low priority because it wasn’t feasible as presented. The site as-is is shown below. The red building with the mansard roof would be renovated, and a structure of similar height and appearance would be built on the triangular lot to its left (west).

20150405_141933 20150405_142028





Ithaca Marriott Construction Update, 4/2015

16 04 2015

It may not look like a whole lot has happened at the Marriott site downtown, but it is a very complex undertaking. One anonymous reader close to the project wrote in to describe the work being done on site in the past couple months:

“Foundation work is progressing nicely despite the weather. Contractors have installed steel H piles to [the] bedrock along the perimeter. Wood cribbing has been installed within the piles. The wood panels slide into the web of the H. The cribbing is backfilled and remains forever, securing the bridge area once complete. Another contractor is drilling tie backs to hold the cribbing in place. The rods are grouted in place to a depth of 20 feet or more. The rods anchor the wall in place so the structure can be built within the opened area. Caissons will be drilled in a few days. The caissons are massive open pipes that are socketed into bedrock, 25 to 30 feet below grade. The hollow caissons are filled with concrete and rebar. Concrete beams will be formed from the top of each caisson similar to floor joists. Then a few million tons of hotel will be constructed on top. The cantilevered design is impressive and makes for some very difficult design constraints. This building is a big sail that is side heavy.”

To paraphrase, and hopefully I have this right, the bridge is being secured by H-shaped steel bars, wood cribbing and filling material, and steel tiebacks are being used to stabilize the retaining wall. Per wikipedia, grouted tiebacks can be constructed as steel rods drilled through the cribbing out into the soil or bedrock on the other side. Grout is then pumped under pressure into the tieback anchor holes so that the rods can utilize soil resistance to prevent tieback pullout and wall destabilization. With the bridge and retaining wall established, caissons can now be drilled. Caissons are piles drilled to a sufficient depth to allow the weight of the hotel to be transferred from the weak soil above, to the stronger bedrock 25-30 feet below. The weight will be spread out over the piles with concrete beams on top of the caissons, allowing for the hotel above to be stable and secure.

The photos don’t show the level of work involved with building the retaining wall, and as of April 5th it doesn’t look like the caissons were being drilled just yet. But those look like caisson liners next to the excavator, so pile drilling will be underway soon.

The $32 million, 10-story, 159-room hotel is slated for an opening in Q3 of 2016 (July-September). The hotel will include a fitness center, a restaurant with indoor and outdoor seating, and 3,000 sq ft of meeting space.

The hotel has been designed by Atlanta-based Cooper Carry Architecture and development is a joint venture of Urgo Hotels of Bethesda and Ensemble Hotel Partners, a division of Ensemble Investments. Urgo’s portfolio includes at least 32 other hotels totaling 4,500 hotel rooms. Interior design will be handled by Design Continuum, W.H. Lane of Binghamton is the general contractor, and Rimland Development contributed the land to the joint venture and is a partner. Long Island-based Rimland was the original firm that pitched the project in 2008 as the “Hotel Ithaca”, before the old Holiday Inn downtown went independent.

20150405_133412 20150405_133416 20150405_133422 20150405_133513

20150405_133115

marriott_rev1_1





Stone Quarry Apartments Construction Update, 4/2015

15 04 2015

Substantial progress has been on Ithaca Neighborhood Housing Service’s (INHS) Stone Quarry Apartments project on Spencer Street on South Hill. Photos from April 5th show that the sixteen 2-story townhomes and 19-unit, 3-story apartment building have been fully framed, sheathed with Tyvek weather wrap, and have windows installed.

Exterior work continues as clapboard siding is installed on the new units. The color selections here are in many cases the same as those found at the Belle Sherman Cottages on the east side of town – the beige-tan window trim is the previously mentioned “Savannah Wicker”, and the brown-orange color is “Mountain Cedar”. “Light Maple”, “Autumn Red”, “Pacific Blue” and “Sable Brown” round out the color selections.

Without actually going inside, it’s a safe bet that interior is moving along with rough-ins and wall framing, maybe even drywall and finish work on the lower floors. The apartments are expected to be completed in October 2015.

The Stone Quarry project consists of 16 two-story townhouses (2 rows, 8 each), and a 19-unit, 3-story apartment building on the northern third of the property. Specifically, the breakdown of unit sizes is follows:

16 three-bedroom Townhouses
2 three-bedroom Apartments
11 two-bedroom Apartments
6 one-bedroom Apartments

As with all projects by INHS, the units are targeted towards individuals with modest incomes, with rents of $375-$1250/month depending on unit size and resident income. While affordable housing is generally welcome and sorely needed, Stone Quarry had a number of complaints due to size, location and lingering environmental concerns.

The build-out is being handled by LeCesse Construction, a nationwide contractor with an office in suburban Rochester. The design is by local firms HOLT Architects and Trowbridge Wolf Michaels Landscape Architects.

20150405_140249 20150405_140330 20150405_140634 20150405_140638 20150405_140701

inhs_stone_quarry_rev_4 inhs_stone_quarry_rev_3





Belle Sherman Cottages Construction Update, 4/2015

12 04 2015

Over at the Belle Sherman Cottages off of Mitchell Street, work is underway on the first set of five townhomes, lots 25-29. The CMU block wall foundations have been assembled and look ready for the Simplex modular pieces to be brought onto the site and fitted. The houses are built using four modules, but the size of the townhouse lots suggests these might have only two modules per unit. The townhouse units sold out fairly quickly, just a few weeks. Sales are underway for the second set of townhomes (lots 20-24), which are expected to be built this year as well.

Elsewhere on the site, the “Classic Bungalow” on lot 12 has been assembled and is undergoing lap siding installation (“Mountain Cedar” color, with a lighter “Savannah Wicker” tan color planned for the dormer). The porch is being assembled and exterior trim is being installed. If you’re interested in learning more about the construction process, there’s a little more info in my previous post here, and on Ithaca Builds here and here. Once completed, there will only be two unbuilt home lots, the already-sold “Autumn Yellowfarmhouse planned for lot 11, and the unsold and un-marketed lot 9.

20150405_123303

20150405_123319 20150405_123326 20150405_123401 20150405_123430 20150405_123512 20150405_123540 20150405_123610 20150405_123621

belle_sherman_townhouses_2

belle_sherman_cottages_102714





News Tidbits 4/11/15: Not Feasible As Presented

11 04 2015

dpi_libe_0414_end

1. If my inbox has been any clue over this past week, there are some folks who are pretty unhappy with the results of the county’s Request for Proposals (RFP) for the Old Library site. One more applicant has dropped out of the process – DPI chose not to respond to the RFP. DPI had proposed 76 condos and 8 apartments for the site, a move that was cheered by some residents who spoke passionately about the new for purchasable housing in the city. That leaves three contenders of the original six:

-The Syracuse-based Franklin Properties project, now called the West Court Lofts and Wellness Collective, would renovate the existing building and include 22 residential condominium units (down from 32 units in the RFEI), medical offices, a café, and community room.

-The Rochester-based Cornerstone Group project, known as the Dewitt Senior Apartments, would build 63 residential units of senior housing (down from 70-80 units in the RFEI), and include community space for nutrition education by Cooperative Extension.

-The Ithaca-based Travis-Hyde Properties project would build 60 residential senior-focused units (up from 48 units in the RFEI), and would include space for Lifelong, professional office, and a community room.

There have been no renderings published as of yet, but there will be a stand-alone post when they show up on the county’s website. The three proposals will be judged against each other over the course of the next couple months. A quick glance at the judgement criteria can be found in the Old Library meeting notes here.

The next meeting of the Old Library committee is scheduled for Thursday, April 30th at 9 AM. 5 PM Meetings will be set up during May for developer presentations to the public. Comments on the proposal can be emailed to Ed Marx, the County Planning Commissioner, at emarx@tompkins-co.org with the subject title “Old Library Property”.

2. Local credit union CFCU (Cornell-Fingerlakes Credit Union) is making some moves by buying a retail commercial strip with an eye towards redevelopment. The property, 501-507 S. Meadow Street, sold for $1,555,550 on March 30th, well above its assessed value of $950,000. According to a statement taken by the Ithaca Journal, “the current intention is to ultimately use the site for credit union-related purposes”.

The one-story, 9,203 sq ft strip buildings date from 1980 and 1990 and previously housed a Thai restaurant and offices for Lama Real Estate, the business of previous owner Robert Lama. The site is currently zoned the suburb-friendly SW-2, but like much of big box land, it has been targeted for urban mixed-use in the city’s Comprehensive Plan. CFCU is currently headquartered in about 30,000 sq ft of office space in two 1990s office buildings at 1030 and 1050 Craft Road in Lansing.

In short, nothing immediate going on here, but definitely a property worth keeping an eye on.

texas_roadhouse__v2_1

3. The proposal for a Texas Roadhouse on in Southwest Ithaca is getting a couple minor revisions. According to a cover letter from the restaurant chain, plantings have been revised to break up the expanse of blank walls, handicap ramps are now present in the new elevations, and signage has been tweaked. All in all, not a big change from the previously-shown drawings. It doesn’t look like this one will have too many issues moving forward.

canopy_hampton_rev4_1

4. At the city’s Planning and Economic Development Committee (PEDC) meeting on the 8th, the city voted to approve the sale of land at 320-324 E. State Street to Lighthouse Hotels LLC for construction of the new Hilton Canopy Hotel. Also up for discussion was the removal of 30′ setbacks on all sides of the special MH-1 zoning at the Nate’s Floral Estates mobile home park on the west side of the city. With the 30′ rear yard setbacks already in place and vegetative buffers installed by the big boxes to the south, it was felt by the city economic developer planner that the additional setback was redundant. The removal would facilitate setbacks reduced to 10′ on one side and 5′ on the other side, if I’m reading this right. According to the notes, the mobile home park has a waiting list of tenants. The proposal looks like it will allow a few more units in the park, though it looks pretty tightly packed as-is.

flatiron_1

5. According to the Ithaca Urban Renewal Agency (IURA) notes from the April 2nd meeting agenda, the board was not impressed with the Flatiron proposal. On page 6, it gives the project low pritority, with the description “not feasible as presented“. On the other hand, the INHS Hancock Street project was well received and given high priority.

402_s_cayuga_st_rev2_1

6. Looking at the March Planning and Development Board meeting minutes, 402 S. Cayuga Street has been approved, pending BZA approval of the variance (which was granted this week, if I have my notes right). The 4-unit, 9-bedroom project may be small, but it’s thoughtful infill and will help bring some affordable owner-occupied housing back into the city.

Approvals were also granted for the city project to replace the Lake Street this summer and fall, and refurbish the pocket park to its southeast. 210 Hancock was discussed without any voting, and sketch plans were presented for the TFC HQ downtown, and the 215 West Spencer Street apartment project, which have been written about previously. The board also discussed added additional questions to the CEQR (the city’s version of the SEQR used in project impact analysis), and the revised paperwork will be reviewed at a later meeting.

Oh, and on a more personal note, this totally made my day:

D. 2014 Planning Board Annual Report

[Senior city planner Lisa] Nicholas briefly walked through the annual report, observing it was a very busy year with a considerable number of additional housing units built. [Board member Garrick] Blalock asked if the annual report is publicized. Nicholas replied, no. Blalock replied it should at least be sent to the “Ithacating in Cornell Heights” and “IthacaBuilds” web sites. Nicholas agreed to do so.
I’ll be excited to have a copy. This would make scouting locations where construction photo updates are required a lot easier.

7. Wrapping this up with one final news piece, it looks like Dunkin’ Donuts is moving into the old Johnny O’s space at 406 College Avenue in Collegetown. So there will be one corporate coffee shop next to another corporate coffee shop and sharing a wall with a trendy fro-yo place. There’s probably a sociology thesis to be had in studying the changing retail scene of Collegetown.





707 East Seneca Street Construction Update 4/2015

10 04 2015

Another infill project is underway in the East Hill Historic District between Downtown and Collegetown. 707 East Seneca, like 202 Eddy Street and 140 College Avenue, had to go through the Ithaca Landmarks Preservation Council for approval, along with getting approval from the planning board and zoning board for an area variance (the lot was too small). After informational and voting meetings by different boards throughout the fall and winter, all the approvals have been granted.

The ILPC-approved design is made to be compatible with the historic homes from the late 1800s and early 1900s that surround the building. 707 East Seneca was originally the playground area for the now-closed East Hill School, and the lot was given to the city in 1982. The property fell into disuse, and the playground into disrepair.  The city voted to put the lot up for sale through the Ithaca Urban Renewal Agency (IURA) last summer, and the lot was sold for $130,000 on December 22nd (the market asking price was $175,000, and the assessed value of the land is $100,000, so the final price looks pretty reasonable).

The apartment building planned is a 3-story, 6-unit, 18-bedroom structure with 4 garage parking units in a basement built into the hillside, and five surface parking spaces. According to documents filed with the city, target completion is July of 2015. Note for the included renders, the black-and-white image with the small basement windows is the final design, but the colors are the same as the lead rendering.

Without getting a good look at the back of the now fenced-off property, it looks like the site has been cleared and excavation is underway for the retaining walls and foundation. Being a sloped site, retaining walls will be built on the west edge of the property (right side of the photos) and for tree wells, and the east portion will use a sloped bank built using fill material. Offhand, I think I remember seeing that the building itself will be assembled from modular pieces, craned into place on the foundation over a day or two, not unlike the method used at the Belle Sherman Cottages.

The design of the building is by Schickel Architecture of Ithaca, and the developer is Ithacan Todd Fox.

20150405_131545 20150405_131553 20150405_131611

707_E_Seneca_2

707_E_Seneca_rev1_1





140 College Avenue Construction Update 4/2015

9 04 2015

Just up the street from 114 Catherine and a couple blocks from 202 Eddy is 140 College Avenue, also known as the John Snaith House. Since last fall, work has been underway on a 3,800 sq ft, 12-bedroom addition to the 1874 structure.

John Snaith was an English builder, stone cutter and architect who came to Ithaca in 1869 to do work on Ezra Cornell’s Llenroc mansion (under construction at the time) and other buildings for the nascent university. Snaith lived in Ithaca for over a decade. He built the original Ithaca High School (destroyed by fire in 1912) and did work on the Sage Mansion, where he was fired by the ever-impatient Henry Sage.

After Snaith moved to Albany, the house was used as a boarding house, a B&B in the 1980s, and a private single-family home. The house was rented out to a landlady and her boarders when it was partially destroyed by fire in 1894. Snaith rebuilt the home shortly before his passing in 1896, but redesigned the top floor with mansard trusses and added dormer windows. Today, it’s student-oriented housing.

The addition is a sympathetic design approved by the Ithaca Landmarks Preservation Council (the house was designated a historic structure in 2011), separated from the original house by a glass “hyphen” connector. In the photos below, lap siding has been installed on the street-facing east wall, and uncovered plywood and house wrap can be seen in the rear. The slight variation in the mansard roof tiles are a nice touch. Windows have been installed, and I’d venture a guess that interior framing is complete and rough-in (plumbing, electrical) is underway in the addition.

The project is designed by local architect Jason Demarest and developed by Po Family Realty, a smaller Collegetown landlord.

None of the larger projects in Collegetown are underway just yet, but that will likely change when their current tenants’ leases are done June 1st. The following year or so should be very hectic in the neighborhood, with 307 College (96 beds), 327 Eddy (64 beds) and 205 Dryden (40 beds) all expected to start this summer, and Collegetown Terrace expected to start construction of its 300+ bed phase III this year. A quick check of the neighborhood showed that construction has not yet started on two other small projects, the 6-bedroom duplex planned behind 424 Dryden and the 18-bed 3-building project at 804 E. State Street.

20150405_124856 20150405_124921 20150405_124939 20150405_124953 20150405_124841

140College_2





114 Catherine Street Construction Update 4/2015

8 04 2015

Work has commenced on the foundation for the new 3-unit, 17 bedroom apartment building at 114 Catherine Street in Collegetown. Plans were approved by the city of Ithaca late last year, and with the worst of winter over (though snow in early April definitely makes one second guess that), construction has been able to proceed on the new building.

The parking lot that once fronted the street is gone. Wooden forms are in place for holding the concrete once it is poured, and rebar criss-crosses the space between the forms. Rebar is used to strengthen and reinforce concrete, the concrete bonds with the steel bars as it hardens. It looks like the east wall of the foundation has already been poured. A blue waterproof membrane can be seen on the concrete in the last photo.

The architect is a Collegetown favorite, local architectural firm Jagat Sharma. The building is being developed by Nick Lambrou of Lambrou Real Estate. Plans call for a 3-story, 4,180 sq ft structure with a 5-bedroom apartment on the first floor and a 6-bedroom apartment on the second floor and on the third floor. If construction stays to schedule, the building should be completed by August in time for the fall semester.

20150405_130821 20150405_130835 20150405_130845 20150405_130853

114_catherine_rev4_1





202 Eddy Street Construction Update 4/2015

7 04 2015

20150405_125117 20150405_125151 20150405_125203

After being destroyed by a fire last March, reconstruction is underway at the site of 202 Eddy Street in Collegetown. Following the disaster, developer Nick Lambrou vowed to rebuild on the site. Being a part of the East Hill Historic District, any new structure needed to be approved by the Ithaca Landmarks Preservation Council. After thorough review, the ILPC approved plans for a new 12-bedroom apartment building that completely replaces the fire-damaged building.

The new structure is a faithful interpretation of the original building, though it’s not an exact copy. An entrance door was repositioned, exterior emergency stairs will be internalized, and a chimney will not be rebuilt, but otherwise, its a close approximation of the original 19th century home. The architect is Ithaca-based Jagat Sharma, who has previous experience from the reconstruction of Sigma Pi’s house when it burnt down in 1995.

In these photos from last Sunday, the concrete foundation has been poured, and the first two floors are framed with plywood and covered in Tyvek house wrap to keep out moisture. Rough framing is underway on the top floor and cupola, and the mansard roof trusses are complete but the roof itself is still in progress. Rough openings in the walls indicate future window locations, although some spots are not as obvious since they’re covered by the house wrap.

Plans call for the new building to be completed and ready for occupancy by August, in time for the fall 2015 semester.

202_eddy





Apartments Planned for 215-221 W. Spencer Street

6 04 2015

I owe a big thanks to Charles Pyott with the city of Ithaca for getting a copy of the sketch plans for 215 West Spencer. I had initially thought nothing was presented at the March Planning Board meeting, but the March PDB meeting minutes said otherwise. I made an inquiry, and he was able to obtain a copy of the sketch plan from the applicant. So a big kudos to you Charles.

A copy has been uploaded to the City of Ithaca website here.

***

215-221_spencer_v1_2

At its March meeting, the city planning board reviewed a sketch plan for a proposed apartment building at 215-221 West Spencer Street, just south of Six Mile Creek and a few blocks from downtown Ithaca.

The steeply-sloped 0.47 acre parcel has been vacant for several years, and currently sees use as an informal 12-space parking lot. The lot is in a R-3a residential zone that allows for a 40′ structure with 35% lot coverage.

Previously, a dilapidated apartment building stood on the site. The building and land were purchased by the city for $530,000 in 2003, and sometime after the building was demolished, the land was turned over to the Ithaca Urban Renewal Agency in 2013.

The property was originally marketed for affordable housing projects only, but received no purchase bids. Once the affordable stipulation was removed, the parcel was marketed once again, and found a buyer – local developer Edward Cope, the owner of local rental agency PPM Homes, bought the parcel for $110,000 on March 6th.

215-221_spencer_v1_1

In the sketch plan presented by local architect Noah Demarest of STREAM Collaborative, four apartment buildings are presented in a terraced hillside layout, all connecting to a staircase that bisects the north and south buildings. The upper buildings have three floors of windows on the west side, and one floor on the east side. The lower buildings have three floors of windows on the west side, and two floors on the east side.

215-221_spencer_v1_3

According to the Planning Board minutes, each building consists of a ground floor unit and “two side-by-side townhomes above it” – it’s not clear if that means two units per floor, or two units total on the upper floors. It could be 20 units or 12 units, pending clarification. The 12 parking spaces on the Cayuga Street side of the property would be maintained and paved.

215-221_spencer_v1_4

215-221_spencer_v1_5

In the sketch plan document, two versions are presented – the aerial renderings show a different design than the site elevations. It’s not clear which is the current iteration, though the site sections show much greater detail (I suspect they are the more accurate of the two).

 

215-221_spencer_v1_6

Expect some revisions moving forward – planning board members expressed a desire for a more prominent connection between Spencer and Cayuga Streets (a “grand formal stairway”) and reworking the Spencer Street facade to make it more visually interesting.