The Cornell Fine Arts Library

6 05 2015

fine_arts_2

Here we go, renders of the Cornell Fine Arts Library, courtesy of the Ithaca Landmarks Preservation Council (ILPC) Agenda. Additional renders here, project narrative here. Apparently, the ILPC does get to review the addition, although looking at the agenda for the 14th, it doesn’t look like they’re making any decisions (and being just outside the Arts Quad Historic District, they may not be able to).

fine_arts_3

Quoting the front page of the narrative, “rather than acting as a physical symbol, it radiates activity and occupation”. The university wanted the new superstructure, which they’re calling a “lantern”, to be as visible as possible from campus entry points, and it is claimed that the addition will bring “distinction and excellence to the campus”.

fine_arts_4

The building will have two entrances, one public and one for AAP only. The interior will consist of four levels of mezzanine shelving for the Fine Arts Library’s collection, as well as interspersed work/study spaces. Floor-to-ceiling space will range from 48 feet on the north side of the reading room to 7.5 feet in some sections of the library stacks. Long, unobstructed hallways will run the length of Rand Hall. The large variation is meant to convey both grand spaces and “private engagement” with the books. The lantern will have a catwalk as well as working spaces.

fine_arts_5

The design replaces Rand’s multi-pane daylight-factory windows with single panes, removes the east stairwell, and is purposely designed to overhang above Rand, acting as a sort of canopy for rain and sunlight protection.

fine_arts_1

As previously covered, the architect is a Cornell alum, Vienna-based Wolfgang Tschapeller M.A. ’87. More of Tschapeller’s very avant-garde designs can be found at his website here. The project is being funded in part by a multi-million dollar donation from Cornell alumna, architect and UC-Berkeley professor Mui Ho ’62 B. Arch ’66. No construction time frame or total cost have been given at this time.

I’ll call a spade a spade. Rand Hall is getting an ugly hat. One that the rest of campus will be subjected to looking at for years to come.

 

 





News Tidbits 5/2/15: Oh, The Anticipation

2 05 2015

1. Lansing village is trying to find a happy medium in its zoning. Specifically, commercial zoning. The village is looking to rezone a group of properties along Triphammer Road near the mall from Commercial Low Traffic to Commercial Medium Traffic, a new kind of zone for the village. According to an article in the Lansing Star, the zone would include “low traffic food and beverage establishments [that] might include sit-down restaurants with or without a bar where food is consumed on premises, which may include carry-out or similar service such as [a] bakery or café,” as well as senior living facilities and certain stores under 10,000 square feet in size.

Most of this has to do with two parcels specifically – a vacant strip of land on Oakcrest Road is slated for a dozen units of senior housing that was a stipulation of the BJ’s approval. The senior homes are part of the BJ’s Planned Development Area and not explicitly affected, but are rezoned on technicality. A vacant parcel on the corner of Triphammer and Hickory Hollow Roads next to Ciao Italian Restaurant has received a lot of attention from outside developers, for hotels, liquor stores and general retail, but the current commercial low traffic zoning allows for none of those (CLT reads as limited to office buildings and isolated small shops). The zoning is under review and any changes would only be enacted after a public hearing at a later date.

 

cinema_drive_1

2. Here’s a pleasant surprise: drawings for a project on Cinema Drive in Lansing. My guess is that this is the project planned by the Thaler family, aka “CU Suites”. The CU Suites proposal described a 3-story, 43,000 sq ft building; the one shown here is 4 stories. The CU Suites proposal is also likely to break ground soon, just as this project is planning. I’m not 100% certain the two are the same thing, but if this were another project on that short street, I’d be very surprised.

Strangely, the source of these drawings is the Cornerstone Library proposal. The selected building partner, Taylor General Contractors of Rochester, was using it as an example of work underway.

harolds_square_taylor

3. Then there’s another project Taylor General Contractors is involved in – Harold’s Square. Taylor has done some work for Harold’s Square developer David Lubin in the recent past, so this makes sense. Will it actually start in Fall 2015? Good question, but there’s been no word on if Lubin has closed on financing for his 11-story downtown project.

fine_arts_1

4. No sketch plans have been uploaded to the city’s website just yet, but initial renderings for the new Fine Arts Library in Rand Hall were presented at the Planning Board’s meeting last Tuesday, according to the Cornell Daily Sun. According to AAP Prof. Jon Ochshorn’s blog, Cornell’s been trying to keep the design plans of this project under tight control, which is fairly unusual for a school that often promotes new projects well in advance (Klarman, Gannett, Gates).

So far, the only public release has been an image of an interior staircase, a soaring, unsettling feature that can be found throughout the works of the project architect, Vienna-based Wolfgang Tschapeller ’87.

University architect Gilbert Delgado did his part to sell the project. From the Sun: “[We’re] resetting the clock on this very important building,” he said. “This is the presence that we’re looking for: noble, early 20th century industrial building that’s been repurposed to our higher use which will exhibit one of the world’s greatest book collections.”

Speaking for only myself, I have concerns with how this is being managed. Cornell had planned to demolish Rand in the early 2000s to make way for Milstein Hall (which went through three starchitects before shovels hit the ground), but alumni blowback caused them to renege on that plan. It’s clear that there’s a certain sort of attachment that AAP alums have towards their structural workhorse. My worry, with the lack of details so far, is that Cornell is stymieing the flow of information for ignoble purposes. Students and alumni won’t be able to object and petition against plans they don’t see and hear about until the figurative last second. Plus, AAP hasn’t had good luck with budgets for new buildings – Milstein’s cost more than doubled from $25 million to $55 million during its incubation, while it shrank in size. In a time of fiscal stress for the university, a dramatic, structurally complicated new library may not be prudent. I’m not against this project explicitly, but I do have reservations.

Regardless of my armchair criticism, when renders do finally show up, you’ll see copies hosted here soon after.

Cayuga-Meadows-Shot

5. According to the town of Ithaca’s 2014 Planning Board report, Conifer has secured funding for “Cayuga Meadows“, its approved 68-unit (sometimes given as 62, unsure which is accurate) affordable senior housing building planned for West Hill. With finances in order, the 3-story, 19,520 sq ft building, sited just south of the Overlook at West Hill apartment complex, will likely start construction this year. Per Ithaca Builds, approvals were granted in late 2013 after a years-long planning process that had Cornell involved early on.

Some other projects still gestating include an 18-lot single family subdivision off of Park Lane in Eastern Heights, and Cornell clarifying plans for a large mixed-use project at or near East Hill Plaza.

 

 





News Tidbits 4/25/15: Long Week, Long Reads

25 04 2015

Grab the popcorn and sodas, folks, this will be a long one.

inhs_pride_design_comparo_v1_v3_1

1. Let’s start with some new and updated renders for the evolving 210 Hancock Street development that INHS has planned for the Northside neighborhood.

In each image, the top half is the old version, the bottom half the newest version. The lead image, an aerial rendering, shows that the houses haven’t changed much, though at the city and neighborhood’s insistence, Lake Street has now been closed off to all vehicular traffic in the refined proposal. The biggest structural changes have been in the apartment buildings – the color scheme of materials has been changed up quite a bit, and the partitions between the buildings have been re-worked to try and make the buildings appear less connected (one of the complaints raised was that they were too much like a wall; for this same reason, the buildings are slightly offset from each other, so no continuous face is presented towards the street).

inhs_pride_design_comparo_v1_v3_2

inhs_pride_design_comparo_v1_v3_5

Looking closer at the individual apartment buildings themselves, the designs have been pretty thoroughly reworked. Different window layouts, different window sizes, different colors – about the only thing that’s been kept the same is the overall massing of each building. The plan calls for 53 1 and 2-bedroom apartments and about 65,000 square feet of space, of which 7,500 square feet will be covered parking. The included commercial space has been expanded from 8,200 sq ft in the initial proposal, to about 10,000 sq ft now. More renders of the newest iteration can be found here.

inhs_pride_design_v3_7

No real changes yet in the for-sale houses that will be included in the project, apart from a palette change (previous render here – the new one is less bright, with darker earth tones). These are designed to blend in with the surrounding homes, and fall in INHS’s typical 2-3 bedroom, 1,100-1,400 sq ft range. The houses are townhomes in rows of 2-4 units, All sporting one or two-story porches. These will be built in a phase separate from the apartments. Certain affordable housing grants are geared towards owner-occupied units specifically, so the Neighborhood Pride lot will be split up into two parcels, one with the apartment rentals, one for the homeowners.

Questions and comments can be directed to the City Planning Office at dgrunder@cityofithaca.org.

2. Up in Lansing village, it looks like a proposed mixed-use project may finally be moving forward after years of incubation. “CU Suites”, a 3-story, 43,000 square foot project proposed by the Thaler family for a vacant lot on Cinema Drive, is asking the village to waive sewer connection fees. Presumably, this is about getting their finances in order before moving into the construction phase; there has been no news if funding has been secured yet. Something to keep an eye on this summer, certainly.

The Cinema Drive site was previously approved for a project of those parameters in fall 2012, consisting of two commercial spaces and a 39-unit apartment building, but that plan has not been carried out. The CU Suites proposal went before the village for “alterations and possible clarification” last December. No updated renders on the village website, but a site plan of the previously approved plan can be found here.

20150405_141933

3. Here’s some more details on the “not feasible as presented” Flatiron project. Readers might recall the 12-unit affordable housing proposal at 910 West State Street was given low priority for HUD Entitlement Grant funding.

From the presentation notes recently posted online:

“The project application is not fully developed, but probably represents more of an effort to start a conversation about the project. There is a great need for affordable housing in the community. The project was conceived to address the high cost associated with typical renovations to properties which make them unaffordable. The project would be located in an oddly-shaped trapezoidal building which [Ishka Alpern] would like to renovate to match its prior condition. It would be a very nice, unique addition to Inlet Island. Inlet Island has historically been a location for affordable housing and it is important to maintain that, before too many unaffordable projects are built there. Unfortunately, it is difficult to build affordable housing units without some form of funding assistance.”

In the Q&A the committee had with developer Ishka Alpern, no time table was given, and Alpern said he was open to waiting a year to refine it. It was also noted that once a commercial lease on the property expires in four years, an even larger project could be proposed, though it could be limited by the poor soils. While it appears renovating is the most feasible approach, the city was not impressed with the cost of investment per beneficiary – larger projects like 210 Hancock mentioned above have economies of scale going for them, costing less to build per unit. Smaller projects like the Flatiron need proportionately more assistance, making them less attractive for grant money. The city’s looking for the greatest good for the greatest number, in a sense.

In other news from the Ithaca Urban Renewal Agency (IURA), a private developer, Viridius Property LLC, is buying five duplexes with 10 units of affordable housing from non-profit Community Housing of Ithaca with the intent of keeping them low-to-moderate income, but retrofitting the buildings to run on renewable energy sources. Viridius, a company run by computer scientist and tech CEO Stuart Staniford and his wife, was established in early 2014, and has been on a buying spree as of late. They own $1.7 million in rental real estate assets now, these duplexes will raise it $2.7 million, and the goal expressed in a letter to the IURA is $5 million.

Quoting the letter sent to the IURA:

“Viridius is oriented to the “triple-bottom-line.” Although as a privately owned business
we will look to return on investment, we also seek to improve the environment and society. We
are particularly focused on contributing to the solution to climate change by converting the
existing building stock to be appropriate for continued use in the twenty-first century. At each of our properties, Viridius is removing the propane, natural gas, coal, or oil heating systems and replacing these with systems based on renewables. The specifics depends on the particular
building; to date, we have used pellet boilers and air source heat pumps. Viridius is also
developing our first solar panels at one of our buildings, and elsewhere acquires commercial
renewable power for electricity. Also, at our own residence we have deployed geothermal heat
pumps for heating and cooling and have all our electrical needs taken care of by solar panels on site. Viridius is certified as a living wage employer by the Tompkins County Worker’s Center
and has five full time staff at present in addition to the owners.

So it’s eco-friendly and/or affordable housing. Most residents will welcome the new fish into the local pond, even if all the property being acquired is a bit eye-raising.

Lastly from the IURA, the Carpenter Business Park on the north side is on the market for $2.85 million. Four vacant parcels on Third Street and Carpenter Park Road on the north side of the city recently sold for $2.216 million from “Templar LLC” based in Ithaca to “Ithaca Lender LLC” out of New Jersey, in what may have been a foreclosure sale. The address on file is associated with a company called “Kennedy Funding Financial LLC”, which is described as “one of the largest direct private lenders in the country, specializing in bridge loans for commercial property and land acquisition, development, workouts, bankruptcies, and foreclosures.” A google search turns up a legal notice between the two entities a few months ago.

gannett5

4. Construction is gearing up for the Gannett Health Center’s addition on Cornell’s Central Campus. Work on the project officially launched March 30th, according to the Cornell Daily Sun. Expect site clearing, excavation, and pile driving as we move through the spring and into the summer. The project will be broken into phases – Phase I focuses on new construction, Phase II on renovation of the current building, and Phase III concludes the project with reconstruction of the Ho Plaza entrance. About 75% of the material removed from the old building is expected to be recycled.

The architect of record is local architecture/Cornell alumni-filled firm Chiang O’Brien. There will be two additions, the four-story, 55,000 square-foot building featured above, and an additional 18,600 square foot addition that replaces the northeast side of the current building. The project also includes a new entrance and substantial renovations to the original 1950s structure (22,400 square feet of the existing 35,000), as well as landscaping, site amenities, and utilities improvements. The projected cost is $55 million, and the target completion date is October 2017.

The Gannett Health Center expansion has been a long time coming. Initial plans in the late 2000s called for a completely new building on site. HOLT Architects prepared a plan for a 119,000 square foot building, and an all-new building was also included in Cornell’s 2008 Master Plan. But once the Great Recession waged its battle on Cornell’s finances, the Gannett redevelopment was scaled back to its current form. According to a statement given by Gannett Director Dr. Janet Corson-Rikert to the Sun, the earlier plan had a budget of $133 million; the new addition and renovations are expected to cost $55 million.

The project is expected to create about 175 construction jobs and 40 permanent jobs (additional doctors, counselors and support personnel) when completed.

5.  According to next week’s Board of Public Works agenda, the approved 327 Eddy apartment project has been pretty heavily modified.

Here’s the old design:
327_eddy_rev2_1

Here’s what the developer is planning to build:

327_eddy_rev3_1

I must have missed something? All the sources I’ve seen have referred to this as a six-story building, not five. The side windows were added late in the approvals process, I think. Anyway, the project is going to the BPW because the developer wants to project the top centerpiece window as a bay window rather than having it set back from the front facade. This would push two feet (2′ x 12′ isoceles triangle) into the city’s right-of-way over Eddy Street,  and the board is recommending to the council that the mayor authorize (he says she should he should, sheesh) the intrusion for an appraised value of $3,073.84, based on an appraisal value from Pomeroy Appraisal Associates in Syracuse.

The decrease in size also comes with a decrease in units and rooms – from 28 units and 64 beds to 22 units and 53 beds. This is a double-edged sword – some might cheer the loss of size or like that the roofline is continuous with its northern neighbor, but it will be harder to stem the tide of single-family home conversion to student apartments if Collegetown’s core isn’t as capable of absorbing Cornell’s student population growth.

The included email in the agenda says the planning board recommended an overhang bay window. Personally, I feel it would make the building look clunky. But that’s just me.

maguire_fiat_1

6. Here’s another project being served up to the Planning Board this Spring. Additions and renovations to a car dealership down in southwest Ithaca’s suburbia. Site Plan Review and drawings here. The dealership is Maguire Fiat Chrysler. Plans call for combining two show lots into continuous lot and adding 20 spaces, adding a 1,165 square foot showroom addition, and new landscaping and signage, including a second freestanding sign for Fiat that requires a sign variance (the max allowed by zoning is one freestanding sign). Documents indicate all the work will cost about $360k and run from September to December of 2015.

Observant readers might remember that Maguires proposed a delaership/headquarters compound in Ithaca town late last year; but due to irreconcilable differences regarding standard zoning vs. Planned Development zone, the plan was tabled.

100_1474

7. Woof. Almost to the end. The Ithaca Planning and Development Board is going to have their hands full at next Tuesday’s meeting. Agenda here. Here’s a rundown of what’s in store:

– A minor subdivision to create a new home lot at 201-203 Pearl Street.

A. Approving the adjustment to the Carey Building design discussed earlier this week

B. Enhancements to the pocket park next to the Lake Street bridge (landscaping, paving)

C. Declaration of Lead Agency and discussion on INHS’s 210 Hancock project

D. Declaration of Lead agency, Public Hearing and Determination of Environmental Significance for the proposed Texas Roadhouse on Meadow Street

E. Declaration of Lead agency for the Tompkins Financial HQ – hopefully, we’ll get some detailed renders at the meeting

F. “State Street Triangle Project (Trebloc Building site)” – This will be huge. I cannot stress by excitement enough at seeing the Trebloc Building demolished – I have not hidden my dislike of it, and in nearly seven years of writing this blog, it’s the only building I’ve ever called an “architectural turd“.  Located at 301 East State Street, the Trebloc Building was built in 1974 during the age of Urban Renewal, and was originally supposed to be two floors. The city has been quietly desiring redevelopment of the prominent corner for years, and the site was upzoned from 60 to 120 feet in late spring 2013.

According to some praise-worthy sleuthing by David Hill at the Ithaca Journal, the developer is Robert Colbert in cooperation with Austin Texas-based Campus Advantage, a large-scale developer of student apartments. plans call for a 120-foot building on site, with first floor retail and student-oriented apartments above.

This will be a tremendous project by Ithaca standards. The developer clearly states on its website that it’s only interested in working with sites that will provide at least 100 units of housing. Assuming the Trebloc Building’s footprint of 13,569 sq ft, one story retail followed by eleven floors of apartments yields almost 150,000 square feet of residential space. Figure a loss of 15% for utlities and circulation space, and an average size of about 980 square feet for an average residential apartment unit, and one gets 130 units and an unknown number of beds that could conceivably add a couple hundred students to downtown Ithaca’s population, not to mention millions of dollars of taxable real estate.

There’s a lot that will need to looked at – utility loads, parking, vehicle circulation, aesthetic impacts, and numerous other attributes. But the city’s holding the door open about as wide as it can for this site, and it’ll be an exciting process.

G. “Sketch Plan: Cornell Fine Arts Library – Rand Hall Addition”

Written about previously, it looks like the city will get its first chance to review the project. But someone with a insider’s look has some pretty harsh comments for the plan to renovate Rand hall.

Cornell Architecture professor Jonathan Ochshorn wrote in to tell readers here about the plans for the Fine Arts Library. I’m including a link to his blog post on the project here.

To try and sum up Prof. Ochshorn’s post would do him an injustice, but suffice it to say, the library plans will only keep the brick shell of Rand – the windows will be replaced, and a large “hat” will be placed on the roof. One that bears strong scrutiny from the Planning Board, since there could be significant visual aesthetic impacts on the Arts Quad Historic District.

I’m gonna tie up this post here and sit on the other items until next week. More weeks like this and I’ll need an intern.





News Tidbits 4/18/15: Where Will Ithaca Grow From Here

18 04 2015

20150207_152026

1. Leading off this week’s news round-up, here’s a thorough piece by the Ithaca Journal’s David Hill looking at the boom in local construction. Many developers had good things to say about the city’s even hand on the market, but then there’s this gem from Jason Fane:

The new Collegetown zoning isn’t universally praised in all aspects. Major Collegetown and downtown landlord and developer Jason Fane welcomed the removal of parking-space minimums from much of the neighborhood. But he said the rezoning added other rules that run up costs, such as requirements for high ceilings and adding “further retail space to a market that already has too much retail space.”

Hmm. Too much retail space, or a notoriously poor landlord to retail tenants?

From the IJ article, we also learned that Jason Fane’s 12-story 330 College project has been mothballed, Travis Hyde’s Ithaca Gun redevelopment will be called “Falls Park”, and Frost Travis himself isn’t optimistic about condos in Ithaca:

No owner-occupied units are in the plans for the gun-factory site. It’s a challenging site, Travis said. “I have not found a way to support condominiums in Ithaca yet,” Travis said. “But I’m not going to stop trying.”

Mayor Myrick expresses optimism that some of the more far-flung outer Collegetown housing might revert back to family housing, but with Cornell’s rapidly growing student population, don’t count on it.

2. Following up my January post, it looks like Cornell’s AAP school is releasing the first rendering of the new Fine Arts Library. At a glance, it looks like the form of Rand Hall will be kept the same as it is now, although there’s no real indication at this point what the exterior will look like after the new library is built.

The architect is a Cornell alum, Vienna-based Wolfgang Tschapeller M.A. ’87. Herr Tschapeller has made some pretty wild looking staircases before (definitely not for the faint-of-heart), so this avant-garde design seems well within his normal repertoire.

100_1872

One concern I have is that Rand’s windows are reduced to single panes in the rendering. It may be an intention of the design or it might be because the windows aren’t the focus of the render, but I always thought one of the charms of Rand Hall was the many-paned windows are a characteristic of the early 20th “daylight factory” industrial style that Rand (built 1911) is representative of. I am surprised that Rand Hall is not a part of the Arts Quad Historic District as designated by the city, but at this point I wish it was.

12-29-2011 016

3. On a brighter note for historic structures, some work is finally getting done on the forlorn house at 102 East Court Street, just north of downtown Ithaca. Unfortunately, it’s not because the owner suddenly had a change of heart about the decaying 187-year old house, which sits in the DeWitt Park Historic District. It’s because the city finally had enough of this crap and fined the owner, Ithaca lawyer Aaron Pichel, $5,000 last month, with threats to fine him another $15,000 if he didn’t bring the house up to code within six months.

I first wrote about this house in April 2012. Quoting that entry:

“Historically, the house is the “Judd House“. The house was built in 1828 – the same year Ezra Cornell had arrived in the budding town of Ithaca, which has hardly twenty years old. An estimate establishes the house as having about 3,100 sq ft, 4 bedrooms and 1.5 bathrooms. Furthermore, the assessed value of the house is $190,000, although given its condition the land it sits on is probably worth more then the physical plant itself.

A casual online search reveals a photo from Cornell’s A.D. White Collection, which shows the house in a much better state of affairs in what the vehicle to the left suggests is the 1920s. Furthering searching indicates the house was most likely designed by Ira Tillotson, the same architect for the Clinton House, which is a contemporary to this home. The once-stately residence was built for Capt. Charles Humphrey, a veteran of the War of 1812, on what was then the corner of Cayuga and Mill Streets. The house and a long-removed barn were constructed for a cost of $2,105.56, which places the cost of construction likely somewhere in the upper six digits to $1 million-plus today. The name Judd House comes from long-time owners of the house in the 1900s, who apparently took great pains to keep the house in good shape. Sadly, that is not the case today.”

Plans filed with the Ithaca Landmarks Preservation Council (ILPC) by local company McPherson Builders indicate plans to restore the front porch to an “acceptable condition”, with new roofing and rafters, cornice reconstruction, replacement of the semicircle window above the porch columns, porch column stabilization and repaint, and restoration the northwest chimney to its original configuration (full length with capping, as seen with the other two chimneys in the above photo).

Yes, please and thank you. It’s a shame it had to come to this to get the needed repairs addressed, but at least the historic home won’t be at risk of destruction. The plans underwent review at the ILPC’s April 14th meeting.

4. Touching real quick on this week’s Chapter House disaster – it’s hard to say what will happen with the site moving forward. It and 406 Stewart Avenue were contributing members to the East Hill Historic District. Probably the best solution at this point would be a sympathetic new build, like the one happening with 202 Eddy Street a few blocks away. But there’s no guarantee that will occur.

Notably, the two buildings exchanged hands only a couple weeks ago. On April 2nd, two sales for $615k and $835k were recorded for two tax parcels consisting of the Chapter House and the apartment buildings on either side (the tax parcel for the Chapter House building is combined with 406 Stewart, the apartment building that burned down). An LLC in suburban Orlando sold them to an LLC in suburban Philadelphia. I doubt there’s anything nefarious here, but the new owner is probably feeling a bit shell-shocked at the moment.

friends_hall_1

5. Nothing big going on at Ithaca College, but there will be a small project to keep an eye on this summer: a small addition to house an elevator between Textor Hall and Friends Hall. Being a small project without significant impacts, the town is prepared to waive certain requirements for preliminary and site plan approval – this should be a pretty quick approvals process.The planning board will review the project next Tuesday the 21st. Comments on the project can be made here.

 





News Tidbits 2/7/15: It Snows In Ithaca, But Verizon Makes It Rain In NYC

7 02 2015

1. As relayed by several outlets, Cornell just received a very generous $50 million donation from telecommuncations giant Verizon. I might make more news about this, but this donation is strictly for the shiny new tech campus down in New York City. The “Verizon Executive Education Center”, in the left of the above render, will be part of the first phase of the campus, set to open in 2017. This goes along with a 6-story, 236,000 sq ft building design by Weiss/Manfredi, and a 4-story, 188,600 sq ft building by Morphosis Architects, both of which are already underway. The skyscraper on the right of the render is a 26-story, 500-room dormitory for students and staff designed by Handel Architects; while not yet underway, it is also slated for a 2017 opening. A design for the tall building on the far left has not been released.

I’d like to see a breakdown of what proportion each campus received from Cornell’s $546.1 million in donations.

2. Looks like some Sun writers decided to do some digging regarding the potential Fine Arts library relocation and expansion. There’s not a whole lot more to add since the Ithaca Voice article; just that the timeline and final design haven’t been set, although the renovation is a “key academic priority”. Students of the AAP school also have mixed opinions about the growth of the library and the possible loss of studio space. But don’t fret dear readers, if a render comes out, it and any pertinent info will be shared here.

424_dryden_rd_1

3. A subdivision filed with the city of Ithaca indicates plans for a new two-family, 6-bedroom home at the intersection of Oak Avenue and Oneida Place. The house would be built on land that currently serves as a rear parking lot for 424 Dryden Road. Application here, drawings here. The site falls into the CR-2 Zone of the Collegetown Form District, meaning 2-3 floors, and pitched roofs and porches are required. The architect is Daniel Hirtler of Ithaca, and the developers are William and Angie Chen, also of Ithaca. While not particularly notable, it’s an example of how the form-based zoning applied to Collegetown helps maintain the character of the less-dense outer neighborhood, while still allowing for new construction.

canopy_hampton_rev4_1

4. As with virtually every other sizable project in downtown Ithaca, the canopy Hotel by Hilton is filing an application requesting a tax abatement through the CIITAP program, making it the sixth applicant since the revised program was put into affect in 2013. Application here, and the notice of  public meeting, set for 5 PM February 9th at City Hall, is here. A refresher/review of CIITAP can be found here.

The applicant, “Ithaca Downtown Associates LLC”, a.k.a. the Patel Family of the Baywood Hotels Inc., notes that the 7-story, 123-room hotel project has an estimate cost of $20.15 million. Although the value of the tax abatement is not recorded in the city’s application (it will be written out, when reviewed by the county IDA), it looks like they’re seeking the standard 7-year abatement, which will save them something in the ballpark of a couple million dollars over those 7 years.

As with the previous Marriott and Hotel Ithaca applications, the applicant will only pay one-third to one-half of its projected employees a living wage, which is probably going to earn them the scorn and opposition of the Tompkins County Worker’s Center. But the city and Downtown Ithaca Alliance have been supporters of the project. Neighboring businesses seem to be have mixed opinions about the project, with some seeing a potential business source, and others mourning the loss of a convenient parking lot.

The 74,475 sq ft project is expecting to start construction during the spring, with completion in Spring 2016. Local firm Whitham Planning and Design is the architect.

For those already planning a stay, expect room rates of $160+/night, according to the Journal.

inhs_pride_alleydesign_v2

5. It’s PSA time again – INHS is planning meeting #4 for its proposed Neighborhood Pride redevelopment at 4:30 PM Wednesday the 11th, inside the vacant Neighborhood Pride grocery store. The one and only final design concept, shaped by community feedback, will be presented at this meeting. Keep an eye on the Voice for an article (and maybe a rerun here) next Thursday or Friday.

lake_st_bridge

6. Looking at the city’s project memo going out to its departments, it doesn’t look like a whole lot needs to be reviewed this month. Cornell’s Upson hall renovation, the 6-unit building at 707 E. Seneca, and the 4 for-sale townhomes INHS wants to build at 402 S. Cayuga Street are ready for final approval this month. The 3-building, 6-unit project for 804 E. State (112 Blair) still needs to be reviewed by the zoning board, and will be completing environmental review (SEQR determination of significance).

The only new projects of note are the new house at 424 Dryden, and renovations to the Lake Street Bridge. The bridge project consists of rebuilding the current deteriorated bridge with a new deck and refurbished abutments (base supports), as well as scour reinforcements (to protect from creek erosion), a bumpout for viewing Ithaca Falls, some cute light-posts, and a bridge span that isn’t so degraded that it’s liable to collapse into the creek. That project has a $1,000,000 price tag, and is expected to run from June to November of this year.

For those that use this bridge, start prepping for a detour route – the bridge will be closed during construction, to both vehicles and pedestrians. The city estimates the detour will be an extra 1.7 miles for cars, and 0.7 miles for bikes and walkers.





A New Home For Cornell’s Fine Arts Library

27 01 2015

100_1870

News of this project comes from the city Planning Department’s annual report, rather than Cornell. There was a time when Cornell used to do a reasonably good job sharing brief summary PDFs of its capital projects, but that ended a couple of years ago.

The project is just a single line, line item B. 17 on the 2015 Work Plan: “Rand Hall Reconstruction”. Those words themselves didn’t pull up anything in google, but a couple related searches pulled up this archived July 2014 email from a Cornell employee announcing the announcement article the chosen architect for Cornell’s new Fine Arts library.

From the AAP website, the Fine Arts Library seems to be more of a renovation than a new construction, moving the FAL from neighboring Sibley Hall and into the top two floors of Rand Hall. The new library is planned for a Fall 2016 opening. The architect is a Cornell alum, Vienna-based Wolfgang Tschapeller M.A. ’87, and the press release credits a $6 million dollar gift from architect and UC-Berkeley professor Mui Ho ’62 B. Arch ’66. From the July 2013 gift annoucement, it sounds like the exterior of Rand will be preserved while the interior is substantially revamped for the new library. There was a great pushback from alumni the first time Cornell tried to demolish Rand Hall, when early versions of Milstein called for the ca. 1911 building’s demolition. Rand Hall sits just outside the Arts Quad Historic District, so any exterior changes would not be subject to review by the very stringent Ithaca Landmarks Preservation Council (ILPC).

If I’m to end this the news article-friendly way, I’d just say “we’ll see what happens with this project moving forward”. But I’m going to do this the blog way, so strictly subjective editorial here on – I can only hope the exterior is preserved. I’m too much of a philistine to appreciate architecture like this:

tschapeler_1tschapeler_2

tschapeler_3

Apart from some close calls with lighthouses and fire towers I’ve visited, I’ve never experienced nausea-inducing staircases before, but there’s a first time for everything.

There’s plenty more on the architect’s website for those who are interested. But they all follow the same, very abstract architectural theme. A fine Arts Library tends to be more avant-garde than most buildings, but this is really pushing the envelope. Cornell, I don’t care if the inside looks like a goddamned funhouse, do the rest of campus a huge favor and leave the exterior alone. Students already deal with Bradfield and Uris Halls, please do not make things worse.

100_1872