News Tidbits 7/7/2018

7 07 2018

1. The infill project at 209 Hudson has been revised and reduced in size. The new plan from the Stavropoulos family of developers calls for just one new duplex at this time, on the existing lawn and swimming pool of the extra-large lot. The rear duplex was eliminated in the revised plan. A small zoning variance is still required for the subdivision (side yard deficiency), but it’s less likely to catch the ire of BZA members this time around because more mature trees are preserved in this reduced-size iteration. Modest bay window projections, fiber cement panels and wood trim will help create a higher quality product.

The duplex would be a quick build since it’s modular, but it’s not going to be ready in time for fall semester – spring (January) would be feasible, if the individual units are assembled before the snow flies. The Planning Board will make their recommendation this month, and the BZA will have their vote in early August, with potential final approval in late August. Quick note, as this has fallen under the threshold for the Ithaca project map (3 units or more), it has been removed.

Also due for review this month are final approvals for 128 West Falls Street (above) and a 3,200 SF endcap addition at South Meadow Square, and approval of a subdivision at 508-512 Edgewood Place.

2. Recently, Visum Development posted photos on their Facebook/Instagram taken during setup for an interview with Park Productions, and Ithaca College student media group. Normally, that’s not something to write about, but this caught my attention:

327 West Seneca is the new all-affordable project they introduced at last month’s planning board meeting. As for the others, I don’t have much of a clue. Ithaca does not have a Main Street, so that’s likely another community. 409 State may refer to an older building at 409 West State or 409 East State, but 409 East State is Travis Hyde’s Gateway Center property (and who at last check had no plans to sell).

As for the others, it looks like the first number was erased. Also of note, there is no East Cayuga, it’s just North and South. So I dunno quite what to make of it – hints of projects with some red herrings, it seems. Worth a look, but it’s not much to work with just yet.

3. Time for a little more speculation. A vacant lot east of 404 Wood Street in the city of Ithaca’s Southside neighborhood sold for $70,000 on June 26th. The buyers were a husband-and-wife pair who also happen to work for Taitem Engineering, a prominent local consulting engineering firm with specialties in structural engineering and associated branches in the context of green/sustainable building operation. The pair previously did a LEED Platinum, net-zero energy home in Ulysses two years ago. The likely guess here is that they’ll be building their next net-zero energy residence on this lot.

As previously noted when the property went up for sale in January 2016 (it was later subdivided from 404 Wood, which was sold a while ago), “(p)laying with some numbers a little bit, there are a couple of options if a buyer wanted to build something. The first and probably easier option would be to subdivide the lot and build on the vacant corner parcel. That would give, per R-3b zoning regulations of 40% lot coverage and 4 floors, about 1400 SF per floor. That gives 5600 SF, and if one assumes 15% off for circulation/utilities and 850 SF per unit, you get a 5 or 6 unit building at theoretical maximum.”

TL;DR – if they want to do a small infill net-zero apartment building, they can. If they want to do a sizable single-family residence, they can do that as well. We’ll just have to wait and see what happens.

4. On the policy side, the Ithaca Common Council voted Wednesday night to move forward with a CIITAP stipulation stating projects pursuing the tax abatement must have a mandatory affordable housing component of 20%, available to those making 75% Area Median Income, affected all residential projects with ten units or more.The extension of CIITAP applicable properties along the Waterfront was also approved.

The policy comes forth after considerable debate over the right percentage and right income to apply. It’s the Goldilocks principle – too little and you don’t add an appreciable amount of affordable housing and may even decrease the amount once redevelopment occurs in lower-income blocks, too much and developers just won’t build (the Portland problem), and those who stick around will renovate existing buildings instead, meaning less supply overall, fewer existing lower-income units and accelerated gentrification. Among things discussed Wednesday night, a proposal to modify the mandatory size requirement of affordable units from a minimum of 80% the square-footage of the market-rate to 100% failed 5-4 (needed six), the % of affordable units went from 10% to 25% (the 25% was the First Ward’s George McGonigal, who has a history of being opposed to new market-rate and affordable housing, and did not get a second to open discussion).

It’s too early to say if this is too much or not enough – the City Harbor folks were in attendance for the discussion (they were at the meeting for a different topic), but didn’t raise concerns to 20%, so it seems likely their project is able to continue. The county IDA is the grantee of abatements with the city in an advisory role only, so they’ll have the final say on the application of the new law.

5. Tompkins Cortland Community College’s Childcare Center has the funds it needs to move forward. The project, first proposed in February 2016, calls for an 8,000 SF, $4 million building, plus a $1.5 million endowment for operating costs. State funds support much of the cost, as well as a $2 million donation from Ithaca CEO and major TC3 donor Arthur Kuckes, for whom the center will be named.

According to Jamie Swinnerton over at Tompkins Weekly, the project includes six classrooms with two infant rooms, three playgrounds, and be, in part, staffed by students studying to be teachers and childcare providers. 12 jobs will be created, and since it’s for faculty, students and staff, those jobs are expected to be full-time and all year-round. The building is expected to be partially opened by the start of the Spring semester, and fully occupied by the Fall 2019 semester.

Design-wise, the latest design in Tompkins Weekly shows smaller windows and the loss of some hipped roof bumpouts at the rear of the building (older version here). Value engineering noted, but the goal of helping students with children stay in school, and get the degrees they want to build their professional foundations on outweighs any shade thrown at the design changes.

6. Also finally moving forward – Lansing Meadows. There was an 11th-hour holdup for the 20-unit senior housing project when the village expressed discomfort with accepting future ownership of Lansing Meadows Drive, feeling the turns were too sharp and posed a liability. Developer Eric Goetzmann relented and agreed to maintain the road as a private road, and the village board approved the project 3-2; there are still a lot of sore feelings about the often-delayed and arguably underwhelming final proposal. Goetzmann has until July 31st to obtain permits to begin construction, or else the county IDA will recommence seeking clawback reparations from abated taxes, most of which went toward the BJ’s that was built in 2011-12.

7. Let’s slay some inbox rumors. East Hill Village is not cancelled. Nor is Trinitas’ Dryden Townhomes project. I checked with the project teams – both are still active projects. However, East Hill Village is waiting on the town of Ithaca to finish updating its zoning to a more form-based code, and the project will not move forward until that happens.

8. For fun: here’s a Google Docs spreadsheet on how the Ithaca metropolitan area lines up with other metros on new home construction permits since 1980. Key takeways – Ithaca/Tompkins County was in the top 10% of metros in 2017 for multi-family housing permits per capita (30th of 381), but it lags quite a bit in the construction of single-family homes, so its overall rank is only the 64th percentile (137th of 381). Even then, it’s still one of the fastest growing housing markets per capita in the Northeastern United States. 2016 and 2017 have been strong years, while 2015 and earlier were generally well below the national average.

The multi-family number per capita is arguably skewed higher than a typical year thanks to large projects like 441-unit/872-bed Maplewood, but the message seems to be that the community is seeing real results from its push for housing. However, with a lack of single-family being built, Ithaca and Tompkins County need to figure out ways to compensate for what single-family provides (i.e. home ownership). It’s not necessarily “we should build more single-family homes” although that is part of the answer. It’s also encouraging suitable single-home substitutes (condos) in desirable areas while maintaining a strong, steady flow of new units as the local economy continues to grow.

 





News Tidbits 1/21/18: Twice in One Weekend

21 01 2018

1. It appears that 107 South Albany Street has had its exterior design heavily altered, even as the building is just starting framing. The old design’s flat roof and unusual stair column feature have been toned down to a pitched (gable) roof of about the same height and dimensions. According to ads on Zillow, the 1-bedroom units, which will be ready for occupancy by August 1st, will go for about $1,395/month. For the price comes a fully furnished unit with indoor bike storage, high-end appliances, tiled bath, custom cabinets and high-speed internet. Water and snow removal are included in rent, electric is not. Fairly certain Daniel Hirtler is still the architect for Stavros Stavropoulo’s latest residential project.

To be frank, I don’t know how much an exterior design can change without having to go back to the planning board – offhand, I think they can do pretty much whatever changes they like, so long as they don’t violate zoning laws or change the habitable square footage.

2. Ithaca architecture firm HOLT Architects totally revamped their website. Among the snazzy new updates was a video.

Now, there are an embarrassing number of HOLT projects I can think off the top of my head, but while watching the 1’22” film, there was one project I did not recognize at all. Above, we see two 4 or 5 story residential buildings along a waterfront – the perspective renders behind the gentlemen’s shoulder are likely all part of the same design set, and the white vehicles in the concept site plan are parked boats. It also appears TWMLA is involved as the landscape architect.

Blowing up the image gives the name “Lembeck Landing”. At first, I thought it said Lambrou Landing, and had reached out to see if it was part of City Harbor; the response was that this appears to be another project. I tried to analyze the streets, it doesn’t look like an Ithaca map, and one street may be named “Porter”. Probably not Ithaca, but someone’s getting some nice waterfront housing. Watch the video for brief shots showing the inside of CFCU’s new HQ and some selected material finishes.

Update: It’s Watkins Glen. An undeveloped parcel near its Porter Street. Thanks to Keith Eisenman for solving the mystery.

3. Let’s just touch on the waterfront real quick. City Harbor is going to be a very substantial project. The first sketch plan involved two large apartment buildings and medical space for Guthrie Clinic; Guthrie would lease its recently purchased warehouse at 770 Cascadilla Street to Greenstar for a bigger, grander co-op; and a third location that will be presented at this month’s planning board meeting. The apartment buildings will be 4 or 5 floors and had ground-level parking with large amounts of surface parking for Guthrie, something that planning board was not a fan of. The other Cascadilla industrial building, 750 Cascadilla, may come down for more parking.

On the one hand, underground parking is out of the question due to the high water table, and above ground parking structures have to contend with soil issues as well, likely leading to deep foundations and increased costs. But an asphalt sea on the city’s shores is not something that will get the board’s approval.

Still, we are potentially talking hundreds of units, as well as a substantial amount of commercial space (and perhaps jobs) with the Guthrie component and the Greenstar expansion. It may very well be that this and the Green Street Garage plan will be the big development stories for the year.

4. Cornell will not the idea of that glass “hat” die; they’re calling it a “suggestion of a future roof pavilion”. The city’s ILPC probably isn’t comfortable with that suggestion being so close to the historically-designated Arts Quad. Anyway, renovations are underway on Rand Hall into the Mui Ho Fine Arts Library. The $21.6 million project, about half of which is funded by donations, will be ready for students and staff in August 2019.

5. It sounds like the city has had just about enough with the state’s aerial apparatus fire code changes that halted much of Collegetown’s approved development projects. They’re prepared to take steps to eliminate parking on Linden because the new state law says Linden is too narrow as-is to have construction taller than 30 feet. This seems to be in addition to the power line issue. For 210 Linden, whose developer (Visum Dev. Group) specifically applied for some kind of relief, it would just be in front of the building; Todd Fox had already started work when the building codes department were notified and started enforcing the new code, which is not a good scenario.

Ithaca would prefer the state grant a broad variance (the new code has apparently been an issue across the state), and normally removing parking wouldn’t “fix” the underlying problem, but since New York State did not notify municipalities they were changing the law, they’re attempting to compromise on something that they normally would not. It might also explain why activity in Collegetown has been quiet these past few months outside of the inner core, where the streets are wider and the power lines are underground. The city is looking into how to make development work with the fire code if the state refuses to budge on code modifications. To be fair, there is tens of millions in development and its associated tax revenue that the city was expecting and that the state, in the midst of a budget crisis, is (literally?) hosing them on.

Whatever the city decided at its BPW meeting last week, it seems to have made Visum happy. They’ve started marketing 210 Linden’s units again. It’s saying there are 10 4-bedroom units, and 1 1-bedroom unit, while my notes say 9 4-bedroom units. Maybe the basement was reconfigured? Not sure.

Update: According to a Visum Rep, 210 Linden is 9 4-bedroom units and has added a basement 1-bedroom unit. So now it’s 10 units, 37 bedrooms.

 

6. Around the county, not a whole lot else on municipal agendas at the moment; one of the reasons for no update last week. Dryden town’s planning board will be looking at plans for a new warehouse next to 51 Hall Road, as well as a 5-lot subdivision at 1540 Ellis Hollow Road for Tiny Timbers, the Dryden-based modular home builder. Tiny Timbers uses the warehouse at 51 Hall Road, so it wouldn’t be a shock if the new one is purpose-built for Tiny Timber’s growing business. The town of Ithaca planning board cancelled their last meeting.

The city is fairly quiet. The planning board agenda for next week is short and mostly contains smaller submissions – the pair of infill duplexes proposed at 209 Hudson are on the agenda, with some slight design tweaks (the eyebrow windows are an interesting touch on the rear building). To the developer’s (Stavros Stavropoulo’s) credit, the units are design to accommodate families rather than students – the giveaway are the separate dining room areas, vs the eat-in kitchens one typically sees with student rentals. Senior planner Lisa Nicholas also gave written kudos for the quality exterior material choices (Hardie Board fiber cement panels, aesthetic wood timbering, stone retaining walls).

A fly in the ointment, per reader email: none of the bedrooms are legal for 2-person occupancy. They are 115 SF each; the state fire code says double occupancy must be at least 120 SF. So that would be an issue if one considers couples’ bedrooms.

The board is expected to declare itself lead agency, host a public hearing, and begin review of the SEQR forms needed before a negative declaration for adverse impacts can be declared. The 4-bedroom addition for Sophia House (111 the Knoll, Cornell Heights) is up for final approval. The proposed playground at Stewart Park is also up for discussion, with the board once again expected to declare itself lead agency, host a public hearing, and begin review of the SEQR forms.BPW is not comfortable accepted the $1.7 million playgrounds, gardens and splash pad unless Friends of Stewart Park creates a $75,000 annual maintenance fund. Lastly, City Harbor will be up for a second round sketch plan, informal discussion to obtain feedback for any future formal submission to consider.

The Nines project (311 College Avenue) is not on the board’s agenda this month. Things are up in the air, as the ILPC has chosen to pursue historic designation, even as there is an active project submission. A little awkward, certainly.

On the 30th, the Planning Board will convene for a special meeting to finalize the form-based code for the Planned Unit Development to be deployed for the Chain Works District.

According to notes from the city Planning Dept, the city approved $130 million in development in 2017. There were 29 projects with 568 housing units, 107 of which are designated affordable for lower & middle income (LMI) households. Also approved was 28,600 SF of new retail & office space. These were from a summary sheet from the planning department, and the detailed write-up will come next month.

7. On a closing note, preliminary estimates suggests that Tompkins County added an average of 1300 jobs over the 2017 calendar year, bringing the average annual job count to 65,300. The gain is just over 2.0%, comfortably above the national average of about 1.5%, but nothing that screams ‘boomtown’. Since 2007, the annual average has increased by 7,700 jobs, +13.8%. The numbers suggest that the gains are slightly better in the fall and spring (7500 – 7700 jobs) than for the summer and winter (7000 jobs), indicating that academic year seasonal jobs are growing slightly faster than the overall market.