Cayuga Heights Wants A Real Community Center

16 05 2013

 

 

 

5-1-2012 184

So the folks in Cayuga Heights are getting in on the development game. In this case, local developers are interesting in taking one of the few mixed-use areas of the wealthy bedroom community, and densifying it.

chmap

The focus of this proposal is the Community Corners area, the small, mostly commercial parcel next to the awkward intersections of Triphammer, Hanshaw and East Upland Roads. According to the Ithaca Journal, Most of the new construction would be focused on the grassy parcel at lower left, while some of the buildings already exist would be expanded upon with additional floors, such as the Island Fitness in the lower left of the commercial patch. The two parcels, although owned by separate groups (The Ciaschi Family, the same ones for whom the corner of College and Dryden is named, own Community Corners; the grassy parcel by Mark Mecenas). Notably, this building only finished renovation last year; the bank in the lead image and the two-story office building at Triphammer and Upland are only about three years old.

chproposal1

Incorporated into the proposal – more lower-level retail and office space, and about 100 units of housing, up to four floors in height. this would require a zoning variance, as the maximum height for Cayuga Heights is about 30 feet. The design thrown out there is from (Larry) Fabbroni Associates, who tend to be called on much more to discuss the civil engineering aspects of development projects rather than actual designs. I prefer to think of the above designs as more of a scheme than anything concrete.

chproposal3

Oh look, they even threw the vaguely hipster-like musician in there! How quaint!

chproposal2

Mecenas notes in the IJ article that build-out for this project would likely take a few years, and that’s after the village approves the zoning changes. But, a pedestrian-friendly mid-rise core to Cayuga Heights would definitely make it feel more like its own community rather than a wealthy branch of the Ithaca tree.

 

 





130 East Clinton Street – Proof Ithaca Has Room To Grow

15 05 2013

Rounding out the trifecta of major developments from which I’ve learned where to obtain renderings and elevations, thanks to the guys at Ithaca Builds. 130 East Clinton (click for PDF) is the latest project of local residential overlord Jason Fane, consisting of a 3-building, 36 unit project built into the hillside right next to the IPD Headquarters.

130eclinton1

The design of the buildings come from the regionally prolific Sharma Architects, the same firm responsible for the large majority of the midrises that occupy Collegetown. Nothing particularly exciting about these structures, some minor variations in the third floor exterior facade, and some sort of structure between each 12-unit building. The project will add 36 bedrooms and 12 studios to the growing downtown core.

130eastclinton2

Construction is slated to start this fall and run through to mid-2014.

 





The Purity Project Design

14 05 2013

So, I know I’m playing “catch-up” here, but the guys at Ithaca Builds have shown me a potential source for renderings – the specialized google search of city documents. Lo and behold, elevations for the Purity Project. From John Snyder Architects, it’s boxy and glassy and rather restrained as modern designs go.

purity_design_1

purity_design_2

The design would have a 5-story structure that tops out at 64 feet – more than enough to make it a visual focal point for the surrounding neighborhood.

purity_design_3

The rendering from Ithaca  Builds suggest the building will use brickwork for some of the lines of the facade. Also, personal opinion, the curved-wall two-bedroom units facing the inlet and West Hill would arguably be some of the coolest apartments in Ithaca. Construction is anticipated for commencement in September, going through to summer 2014.

 

 





Thurston Avenue’s Fitting Addition

13 05 2013

thurston ave 1

So, the folks at Ithaca Builds brought my attention to PDFs containing site plans, floor plans and elevations for the Thurston Avenue apartment project, slated for the wooded parcel at the northeast corner of Thurston Avenue and Highland Avenue. The design here has to contextually sensitive, since it lies within the Cornell Heights Historic District. So, boxy and glassy won’t cut it with this parcel. So, the architects in employ put their creative powers to work…and two restyles later

Design for Building 1

thurston ave 3

 

Design of Buildings 2 and 3

thurston ave 2

The latest design proposed by HOLT Architects shows four buildings with three styles – Building 1 (northernmost) and Buildings 2 and 3 (against Highland to its east) are fairly similar, though 2 and 3 are set into the hillside a little, and the design reflects that. Building 4 has massing more like a large house than an apartment building. Oddly enough, the PDF lacks elevations for Building 4. Assuming the floorplans in the PDF are similar on each floor in each building, this would produce 20 units, with 56 bedrooms (54 3-bedroom, 2 1-bedroom). Parking spaces were reduced from the originally proposed 40 to 27.

Does it fit within the context of the neighborhood? The designs demonstrate hipped roofs, porches, architectural elements similar to the surroundings, and material samples and colors shown seem appropriate…so, check. Also, for what incredibly little it’s worth, I think it’s a very good design for the parcel, so much I wish they would tear down the ca. 1966 Rabco complex next door (although, I do wonder if the Tudor-esque “exposed beams” are a bit overboard). But, the real test will come when these begin construction, which with approvals in hand, should start around November, with a summer 2014 completion.





The Storybook Cottages

26 04 2013

4-8-2013 155

Several months ago, my best friend landed his dream job in Ithaca. Within the day, he was looking for places to live. I being his roommate, and trying to be as discreet as possible given my borderline-unhealthy interest in Ithaca real estate, was more than happy to listen in and offer advice.

4-8-2013 162

One of the places he checked out was The Boiceville Cottages (I’ve always assumed this is pronounced like “Boy-ss”, like the Boyce Thompson Institute on Cornell’s campus).  As multi-unit housing goes, they’re quite unusual. In general, housing is set up in single-unit cottages, clustered in groups of three. More recently, a few three-unit buildings, and a church-like meeting house have been erected. Perhaps the most obvious details are the colors. It’s like someone looked at a bright cheery children’s storybook and went to town.  Apparently, such tales were at least part of the inpsiration for their appearance, with the intricate eaves and vivid paint-jobs.

4-8-2013 157

The project is a little out of the way, about a mile south of the Caroline town hall and Route 79. So it took me a little while to swing out for a visit, and see them firsthand (my friend settled in Eastern Heights. Boo). This development further caught my attention because of the expansion underway. The Boiceville Cottages development was first initiated in 1996, and from what I can tell, it took about ten years to build the first 24 units.  Around 2007, a second phase was initiated, with 36 units. As of last year, this phase is complete (so, they definitely picked up the pace on construction…). Recently, they were granted approval for the construction of 75 more units, doubling the size of the complex.

4-8-2013 163

When I finally made it out that way a few weeks ago, I was going around taking photos, when an older gentleman in a pickup stopped and asked if I could be helped. Generally, I’m extremely cautious when I go on photo tours – on previous occasions, both Ithaca and elsewhere, I’ve been threatened with the law and with violence, so I regard every interaction where I have a camera in my hands with extreme prudence.

4-8-2013 159

The gentleman turned out to be the builder/developer, Bruno Schickel. About a month earlier, I had asked if there were any renderings or site plans online (the answer at the time was “only what’s on the website”; the link above is a site plan from a town review of the project). So I wasn’t a complete stranger. We chatted politely for a couple minutes, I told him how I thought he had a unique and creative development. He invited me to check out a display unit (which due to a long to-do list, I politely declined). All in all, I’m glad I did not get chased off the property, and my thanks to Mr. Schickel for  tolerating this random guy taking photos of his property.

4-8-2013 158





Spring 2013 Construction Update (The Last Photos)

18 04 2013

I’ll admit, took a little longer than expected. But being a first-time first author on a just-submitted scientific paper for peer review…well, that took precedence. Now that I’ve finally crossed that off my professional bucket list, I can put up the last few photos. I have variations of project photos, and Ithaca photos in general, which will show up as other entries are written in due course.

4-8-2013 344

Hello new and not-completely-sad looking Clinton Street bridge. The lightposts and balustrade are nice touches. Personally, I wish the steel was something other than Grandma’s fridge green.

4-8-2013 3464-8-2013 342

I was not completely sure where local uber-capitalist Jason Fane was planning his new 3-building, 36-unit project. But I figured this hilly area next to the City View property and the IPD was a likely guess.





The Revised Harold’s Square

12 04 2013

Two things. One, noting that it is not Harold Square, but Harold’s Square. Well noted.

Two, as shown by the Ithaca Times, the proposed design has been revised. And in the opinion of one armchair architecture critic, it has gone from meh to hideous.

haroldsrevised2 haroldsrevised1

For reference, the old renderings. Now, I thought the original design for the Commons side was fairly okay. The revised proposal…it looks grim, the “modern” steel sections are like tumors growing out of a rather cold and dour facade. The exposed truss on the tower portion is gone, but now there are narrow misaligned slit windows. Reminiscent of Cascadilla Hall. Or a prison. Or most closely, the rather awful 499 South Warren Street in Syracuse.

Don’t get me wrong, I like what the project provides – mixed-use, high-density, downtown-friendly. But unless the materials are mind-blowing, I fear this thing is going to age terribly.





Ithaca Construction Photos, Spring 2013 (Non-Downtown Pt. 2, Downtown Pt. 1)

12 04 2013

4-8-2013 257

Facade work is just beginning on the new 106-room Fairfield Inn down in big box land. The project experienced a bit of a hiccup back in January when two construction workers were injured at the site, falling four stories through collapsing scaffolding above an elevator shaft. Occupancy is slated for mid-fall 2013.

4-8-2013 248 4-8-2013 249

Site prep is under way for the new 18,000 sq ft Planned Parenthood building on the 600 block of West Seneca Street. It would be unfair to label this a demolition. If anything, it looks like a careful deconstruction is underway for the run-down homes currently on the property, salvaging what can be reused before the rest of the structure is torn down. A maneuver like that deserves a big thumbs up. The project will begin construction during the summer, with completion around late summer 2014.

4-8-2013 256

Why? Because it’s Ithaca.

4-8-2013 327 4-8-2013 326 4-8-2013 324

5 of the 6 floors have been built for Breckinridge Place; rather curiously, only a couple bits of masonry and steel are up to where the sixth floor will be poured. The 50-unit project should be completed and ready for rentals by this fall.

4-8-2013 330

This photo will very quickly become outdated. Firstly because of the Commons reconstruction, which I’ll cover at another time. Secondly, the Harold’s Square project. The 10-story, 140-building will refurbish the Sage Block and the Miller Buildings (the orange brick structure left of center), while the three buildings at center will be demolished. The mixed-use project will have retail on the bottom, office space on the first few floors, and apartments on the upper six floors (estimates range from 36 to 70). Although the project still needs some zoning variances, if all goes well, construction could start by the end of the year, with completion around mid-2015.

EDIT: Oh look, new renderings. Now the building has gone from “meh” to embracing the prison motif, with slit windows in the tower and a dour face towards the Commons. This is not going to age well…

4-8-2013 343

Another soon to be outdated image. The “Lofts at Cayuga Green” will add 39 units on four 15′ floors. In a recent interview, the director of planning and development expressed concern whether the project would start this year, but given that funding is in place and the developer’s tax credits will expire otherwise, my guess is now or never.

4-8-2013 338 4-8-2013 339

Now, another project that is underway. Seneca Way will add 38 apartments and ground-floor office space. The five-story building is expected to be opened in Spring 2014. Meanwhile, the Argos Inn next door should finally be open for this business.

4-8-2013 335 4-8-2013 347 4-8-2013 349

Hotel work, approved and set to begin. At top, the site for the new Marriott. With tax abatement approved, construction will start by summer, with an 18-month buildout for the 10-story, 159-room hotel. The Holiday Inn will also begin its reconstruction this year, tearing down the low-rise portions for a 9-story tower and a convention center (and a net increase of 13 rooms). The low-rise portions are slated to close in November, and while renovation of the older tower will be done by May 2014, the new tower and convention facility will probably require another year before they are completed.

All other photos will be uploaded in the final entry.





Ithaca Construction Photos, Spring 2013 (Non-Downtown)

11 04 2013

So, for the record – driving around town trying to get pictures of all the projects outside downtown was a royal pain in the arse. Not that I don’t like to have lots on my itinerary, but more than once, my aching feet and my gas tank were making me regret the jaunt about town. A couple sites I passed without taking photos; these were projects not yet underway, such as the Thurston Avenue project, the Stone Quarry Apartments, and CU Townhomes project on Harwick Drive. I will generally not take project photos when I’m catching up with old friends; it’s a respect thing, and I also like to pretend that I’m a normal human being.

4-8-2013 160

I’ll be doing a much longer post about this eventually, but the first new homes are underway for the Boiceville Cottages‘s 75-unit expansion out in Caroline. Currently, the site has about sixty units, 16 clusters of cottages and 4 3-unit buildings. The project will add 23 more clusters and two more 3-unit buildings. Also, I realize Caroline is a bit of a stretch, but it’s only a mile detour from 79, so carpe diem.

4-8-2013 352

Another place that will be getting a much larger write-up eventually. This is Ecovillage’s newest neighborhood under construction. The TREE project will add 40 units, in addition to the two previous neighborhoods of 30 apiece.

4-8-2013 206

The site of Cascadilla Landing.  Site Prep is supposed to be begin shortly on the 150+ unit project.

4-8-2013 242

A rather unusual project, the Heritage Park Townhomes on Lincoln Street. I suppose these are supposed to be single family rentals, but I think it’s more like 3 units each. A bit ungainly and fussy, even though the detailing is appreciated.

4-8-2013 243 4-8-2013 244

The Aurora Street pocket neighborhood, by Cosentini Construction. 4 units, and a clever example of urban infill near the corner of Aurora and Marshall Street. The idea seems to have hit a market, as the builders are planning a second, similar development off of Lake Street.

4-8-2013 245 4-8-2013 251 4-8-2013 254 4-8-2013 255

So, this threw me for a loop. The project is Magnolia House, a 14-unit shelter/home for homeless women, under the auspices of the non-profit Tompkins Community Action. At 3/4 stories, it is one of the most visible buildings in the immediate area, with the corten steel copper plating certainly doing its part. The copper is unusual, an interesting use of materials. The windows….hate. Hate, hate, hate hodgepodges.

4-8-2013 252

Although one day, the shelter may be overshadowed by a 5 or 6-story building with Purity on the ground floor. The project is still in the planning/approvals process, with about 20-24 units.

4-8-2013 250 4-8-2013 246 4-8-2013 247

The 24-unit Iacovelli project on Seneca is near completion, with facade installation and some interior work being all that is left.

…and wordpress has told me I’ve hit the limit on photos. Planned Parenthood and the Fairfield Inn will be included in the next entry.





Collegetown Construction Photos, Spring 2013

9 04 2013

4-8-2013 198 4-8-2013 199

The last time I rolled through around Thanksgiving, the Vine Street Cottages projects had two homes complete and a third underway. 4.5 months later, and the third home is complete, but the project has shown no further development. 3 homes of 29 is not a particularly auspicious sign, especially when all of the for sale signs nearby had no “sold” stickers slapped on. They’re nice homes, but it’s not easy justifying paying $300k+ when older homes of similar design are going for 100k less five minutes away.

4-8-2013 173 4-8-2013 171 4-8-2013 170 4-8-2013 168 4-8-2013 166

I still cannot get over how massive the Collegetown Terrace project is. It just dominates the terminating views along the State Street corridor. The work underway at the moment is for Phase II, set to be complete this summer. Phase III will not be as visible, as those buildings will be built closer to the gorge. One thing I did realize in taking photos was that it was extremely difficult to cross East State Street, a sentiment shared by a couple of residents who were cursing loudly while trying to cross the busy road. Thankfully, improvements to the road will be made to make it more pedestrian-friendly, including reworking the traffic lanes/island and adding crosswalks. The entire project will be complete in Summer 2014.

4-8-2013 190

Which by that time, I would not be surprised to see Novarr-Mackesey initiate plans for the former Palms property and its neighbors, all of which are owned by the development company.

4-8-2013 183

107 Cook looks to be complete.

4-8-2013 184

Maybe someday? Hopefully.

4-8-2013 177

604 East Buffalo Street. Not long ago, it was home to the Crossroads Life Center, a Christian Fellowship organization. Crossroads sold the property in December 2012, anticipating a move to a newly-constructed property that appears to be in substantial need of donations in order to actually happen. Meanwhile, WVBR bought the building for its new studio, moving out of its current digs near East Hill Plaza. In the same vein, the station is in the middle of a capital campaign to renovate the structure for their needs, to the tune of $935,000. The naming rights have been bought in full by left-wing gadfly Keith Olbermann’ 79, whose donation was partly in honor of deceased classmate Glenn Corneliess.  Hence, Olbermann-Corneliess Studios. the station expects to move in by the end of fall 2013.

4-8-2013 196

Apparently, Pontiac 1000s still exist in the Northeast. Growing up in a family with multiple mechanics, I knew as a child that owning this car, or more commonly its Chevette sibling, pretty much meant you gave up on life. Bravo to the person who’s kept one going this long, well after repairs would be worth more than the car itself.