News Tidbits 6/10/2018

11 06 2018

1. For those of you looking out for something interesting next week, here’s your notice. In the village of Lansing Monday night, a sketch plan is set to be shown involving a cluster home development on the remaining phases of the Millcroft property, about 40 acres off of Millcroft Lane and Craft Road. According to the agenda, the proposal comes from Ithaca-based landlord/developer Beer Properties in partnership with Hunt Engineers.

The back story here is that the Millcroft subdivision was approved in the mid 2000s as a three-phase, 31-lot development for high-end ($500k+ homes). As it turns out, the market for that, absent lake views and on relatively small lots, isn’t so great. The Great Recession didn’t help either. The first phase of 14 lots is mostly built out, and the second phase was approved and shows up on town maps, but no construction has taken place. The village has been aware of a project in the works since at least February.

Unfortunately, I can’t seem to find the property listing for the land, which was on Zillow for quite a while – I recall a figure around $850-$950k. The property falls in the village’s medium density residential zone, Cluster zoning means the lots themselves are smaller to preserve natural space. However, the maximum number of units is the same as maximum allowed by regular zoning – 40 acres in sewered Lansing village MDR means up to 87 units, if I’m doing the math right. Not sure if single-family, townhome or otherwise, so keep an eye out for a follow-up.

2. For sale, 15.31 acres off of Wellsley Drive in the village of Dryden. Sewered, watered, and originally planned for 36 homes but never approved. Price of the land $149,900.

Here’s maybe the more interesting part – this borders Maple Ridge. Maple Ridge’s first phase is built out, and the developer, Paul Simonet, would like to build the roads and lay out phase two (and eventually phase three). However, the village’s issue is that there’s only one entry and exit into the development – something they’ve been hesitant to sign off on because of possible safety/access issues.

Now, this may have already been resolved – the village of Dryden has only updated their website twice since February, with legal paperwork for keeping fowl – but if not, there’s the option of buying the Wellsley Drive property and routing a road through there. Maybe $150k plus the extra road work isn’t in Simonet’s price range, but it’s at least an option.

3. The village of Trumansburg commissioned an independent study from Camoin Associates (the same folks who did the Airport Business Park study) looking at the financial impacts of 46 South (formerly Hamilton Square) on the village. I’ve been told this wasn’t public yet, but it’s on the village’s planning board webpage, so I dunno about that.

Quick refresher: 73 units. 56 affordable, 17 market-rate. 6 affordable rental townhomes, 40 apartments, 10 affordable for-sale townhomes, and 17 market-rate units, single-family and townhome style. 140 residents at full buildout in 2023, assuming one per bedroom.

Here’s the TL;DR on the finances. The net income to the village itself is -$23,757/year when fully built out. The unfortunate truth of residential development is that, frankly, people have needs. They use roads, they call police and fire, they use municipal power lines and water pipes and sewer mains. It is not offset by the village’s share of property taxes, here in this mixed-income example, or in the vast majority of cases. This is a reason to advocate housing density, because the impacts on, say, building new roads or infrastructure is often less per unit.

On the flip side, the school district, which makes up a greater share of the property taxes, sees a net increase of $97,669/year when fully built. Tax revenue more than offsets the expenditure of approximately 33 new students. Not everyone living in has a child, but everyone pays school taxes. This money not only helps the district, the incoming students help ameliorate concerns that declining enrollment may soon lead to consolidation with a neighboring district.

Economic impacts can be broken down into three components – the construction jobs, long-term operation/maintenance, and growth induced by the new residents, who will not just live locally, they will also shop, dine and spend money in the village. There will be an estimated $18.17 million spent on construction, $1.45 million will be spent within the County, creating 20 construction job-years in total (note there are multiple guys on site once, the project is expected to be fully complete within five years), and nearly $695,000 in total earnings. Operation/maintenance in perpetuity creates the equivalent of two jobs, creating $60,732 in earnings and $229,782 in sales. The households will spend nearly $1.7 million yearly within the County, which will support 20 total jobs with over $676,500 in earnings per year. In other words, $2 million spent in the county, 22 jobs and $737,500 in net new earnings from having those 140 more residents in the village.

By the way, if one was inclined to read 289 pages of public comments about 46 South, that can be found here. The project will be discussed at the village board’s meeting Monday evening.

4. Let me note this before I forget again – Park Grove’s Bomax Drive Apartments have started construction. The first two strings of 10-unit, three-bedroom townhomes are expected to be completed by Spring 2019. I’ll make a site visit soon for a longer write-up.

5. Meanwhile, the Triphammer Row townhomes are on pause until the road situation gets worked out. The village won’t sign off on using M&T Bank’s parking lot as an entry route, and the Sevanna Park condos don’t want to allow access to the 15 units through their private road. As a result, the village is seeking to have the road turned over to them, in part to encourage this for-sale plan, and in part because will ownership of the entry road to Sevanna Park will allow them to install better curb cuts and traffic control.

6. Here’s a for-sale property with some small-scale redevelopment potential, this one in the city of Ithaca. A dilapidated house is for sale at 815-17 North Aurora Street in Fall Creek. thanks to unsympathetic additions, the historic value is marginal. A buyer could restore it, or if interested, since it’s a double-lot, they could split the lot in two and do a two-family home on each property. Given other recent projects in the area such as 202 and 204 Queen Street and 128 West Falls Street, it appears to be an opportunity to do some modest densification keeping with Fall Creek’s fabric without upsetting the community too much in the process. The property is for sale for $269,000.

7 Let’s tie this up with something intriguing. Next week, the city’s Planning and Economic Development Committee is being asked to support a grant application by the Downtown Ithaca Alliance to the New York Main Street (NYMS) grant program. They are seeking $322,500 from the state to leverage work on four downtown projects – a commercial project in the Clinton House, a commercial project in the Boardman House, a “commercial and housing project” at 108 West State Street (the Ithaca Agency Building), and a 12-unit development by Visum Development in the West State Street Corridor. Any rehabbed housing units will be required to be 90% area median income for at least five years, but I dunno if either housing plan has existing units, I think the Ithaca Agency Building was all office space. STREAM Collaborative just moved into the second floor, so they would know best.

Quick postscript here – there’s nothing but an outline according to the DIA’s Gary Ferguson, so no Voice writeups for a while yet.





News Tidbits 2/26/2018: One, Two, Many Tweaks

26 02 2018

1. Let’s start off with some bad news. Than Lansing Star is reporting that developer Eric Goetzmann is in serious trouble. The village of Lansing Planning Board rejected his latest request for the Lansing Meadows senior housing component, which was to build twelve units on a fraction of the lot, and leave the rest vacant. Frankly, they liked the units, but the vacant and potentially saleable lot was too much for them to overlook. To be honest, they and the village Board of Trustees have been fairly accommodating to his other requests, but this seems to be the last straw, and they let him know it.

They will consider the latest revision, but only as a major revision, not as the minor change Goetzmann had hoped for. That means it will take months to go through the procedural review and vote. Meanwhile, the IDA has initiated legal action because Goetzmann failed to hold up his end of the deal they agreed to when he received his abatement back in 2011.

Some projects are successes. Some break even, some don’t turn out as well as hoped. But as Lansing Meadows goes, this is neigh close to a disaster.

2. On a more positive note, Lansing will be considering, coincidentally, another 12-unit townhouse project. Called “Triphammer Row”, the market-rate units are planned for the vacant rear portion of a Cornell-owned parcel at 2248 North Triphammer. This blog reported on the parcel in a news roundup back in July 2016, when it went up for sale:

“Hitting the market this week is a potential opportunity for the deep-pocketed investor/developer. The property is 2248 North Triphammer Road in the village of Lansing. The sale consists of two parcels totaling 3.42 acres – a 1.53 acre parcel with a 2,728 SF M&T Bank branch built in 1992 and holding a long-term triple-net (NNN) lease; the other, an undeveloped 1.89 acre parcel to the rear that the listing notes could be developed out into 13 housing units. The price for the pair is $2,125,000.”

The plan calls for roughly 1,350 SF units with ground-floor garages. They’re intended to be marketed towards seniors looking to downsize, and young families. The developer is Robert Poprawski, who runs a small hotel group (Snooze Hotels) in metro Fort Lauderdale, Florida. Poprawski is a 2005 Cornell graduate, so there’s the likely local connection.

The planning board is supportive, but the big issue will be the driveway – they would prefer the townhomes share Sevanna Park’s driveway. That’s tricky because Sevanna Park’s road is privately owned. Not impossible to make a deal, and it would likely have the village’s benediction, but it’ll take a little while to see if a deal can be made between Sevanna Park’s HOA and Poprawski (all things considered, given that a much larger retail/office building and parking lot could be built on the combined lots, 12 more homeowners doesn’t sound like a bad option).

The village is also reporting there are development plans for the balance of the Millcroft property (the 32-acre remainder of the parcel, once intended for luxury single-family homes, has been for sale for a while), and vacant 4.56-acre 9 Dart Drive. The Ramada Inn (correction: the new extended-stay hotel proposed behind the Ramada) and Target are the only businesses interested in buying their properties from the mall’s owner, and Bon-Ton’s on deathwatch. The town’s code and planning officer notes that if it weren’t for Namdar Realty buying the mall, it would have failed, which would have forced the remaining tenants out and turned the mall into a vacant husk, to say nothing of the property tax implications.

3. Let’s shift over to Dryden. It’s been rumored for a little while that 1061 Dryden, aka the “Evergreen Townhouses”, would be trying to shift towards a smaller footprint – here’s the plan. The approved proposal calls for 36 3-bedroom units, six strings of six units. The reduced size plan still has six strings of six units, but the middle four have been reduced to two-bedroom units. The total occupancy goes from 108 to 84, and the footprints have shrunk as bit. Old render at top, new renders at middle, new site plan at bottom with new footprints in red. HOLT Architects’ design is generally the same, though I have an armchair critique with the rear flanks of the strings – a window opening would do a lot for aesthetics, if the floor plans permit.

(You can check the town’s website for docs, but some webpages have been hacked and replaced with a phishing scam, so use caution).

According to Dryden town planner Ray Burger, the developer, Lansing businessman Gary Sloan, would like to start construction this summer. That would put these units on track for an opening in time for the 2019-2020 academic year (in other words, about 12-14 month constriction timeline).

4. Another project moving forward – 118 College Avenue in Collegetown. This is a Visum proposal to replace a five-bedroom house with a 5-unit, 28-bedroom apartment building. The project was approved by the city early last year. According to the advertisements on Zillow, rents are expected to be $1,200/person, plus utilities.

I asked Visum’s Patrick Braga to confirm, and he replied that building permits would be approved “any day now”, so they’re probably looking at an August 2018 opening. With regards to a follow-up inquiry about its near-identical twin planned for 126 College Avenue, Braga replied they he does not “have any information on the status” for that project.

5. The new Greenstar West End store. Maybe coming soon. According to the news release, if the membership approves the move, the new store would be open at 750 Cascadilla Street by November 2019. The expansion would more than double their floor space, and add sixty living-wage jobs. Membership will vote on the plan next month.

The above render is courtesy of STREAM Collaborative – even without their logo, their software relies on the same pack of white Priuses, Volvos, and Touraegs to fill parking spaces (my family of mechanics would be proud I use vehicle models as a telltale attribute). The design is attractive for a big box – it has shed roofs and exposed wood trusses that give it a warmer, less industrial appearance. For the record, STREAM also did 118 College Avenue in the previous tidbit.

6. Honda of Ithaca has been sold to the Maguires for $3.5 million. The sale was recorded with the county clerk on the 20th. The acquisition means that Maguire represents just about every major vehicle make in the Ithaca area. It also drew some impassioned responses regarding customer service experiences, which given Maguire’s very visible presence, is not to be unexpected.

According to county records, the 27,558 SF dealership was built in 1985 as Cutting Motors Buick-Pontiac-GMC, and sold for $1.8 million in 2009. It was renovated and expanded in 2012; the portion closest to Elmira Road is the expansion space.

7. The Lambrou family’s latest project is coming along. Being built at 123 Eddy is a contextually-sensitive two-family home at 123 Eddy Street. While modular, the home was designed to have features respectful to its location in the East Hill Historic District – this includes a double-decker porch, roof brackets, shake siding and decorative columns and railings. The new three-bedroom units should be ready in time for the 2018-19 academic year.

8. Quick note – building permits for both the Amici House residential and head start/daycare buildings have been filed and granted by the city. The Harriet Giannellis Childcare Center’s hard costs are estimated at $1,267,479, while the 23-unit residential portion’s hard costs are estimated at $3,627,333. Welliver will be the general contractor.

9. Looks like a pretty quite planning board agenda for this month. A pair of new projects, but they’re small ones. Let’s have a look:

I. Agenda Review 6:00

II. Privilege of the Floor 6:05

III.A. Stewart Park Inclusive Playground 6:15

B. College Townhouses – Modified Site Plan approval 6:35

C. Proposed U-Haul Self-Storage Project – Sketch Plan 7:10

Although vague, this is like for the former Salvation Army property at 339 Elmira Road. U-Haul purchased the lot in January 2016 from the development group that planned and cancelled a hotel for the property. As noted on the Voice recently, there’s been a building boom in self-storage facilities lately.

The most plausible guess for this corporate-owned property is that this will likely take after the chain’s default design for self-storage facilities, with maybe some modest aesthetic differences. Not especially pretty, but the city would probably prefer that over a parking lot for U-Haul trucks.

D. Proposed duplex and parking – 207 and 209 First Street 7:30

207 and 209 are a pair of run-down rental two-family homes in Ithaca’s Northside. After the previous owner passed away, they were sold to local businessman David Barken in June 2017. Barken previously caused a stir in Fall Creek when he bought, renovated and sold a Utica Street home for a much higher price (he said on the list-serve it wasn’t intended to be a flip, it was intended for a family member who decided to live elsewhere). Barken purchased the home for $160,000 in September 2016, and it sold for $399,500 in June 2017. He also rents out a couple other units in Fall Creek.

EDIT 3/8: Rather than a tear-down and replacement, the scope of the project appears to be that the homes would be renovated, and a new duplex would be built towards the rear of the lots. Per email after the meeting from David Barken:

“While in its beginning phases and still taking shape, I have no intention to tear down the existing homes. Instead, I plan to steadily improve these properties, working on both the exteriors and interiors as the planning phases for any future project moves forward.

Rather than de-densification, my aim is to add more fair market rate, non-student housing to the downtown market and add to urban density in our city’s core. I am designing the site for a total of 6 apartments, with an emphasis toward communal interaction, landscaping, and urban gardening. I envision a pocket community for renters, complete with the 4 renovated units in the front of the lot and an additional duplex placed in the rear of the parcel.”

IV. Old/New Business 8:00

A. Chainworks FGEIS

B. Planning Board Report Regarding the Proposed Local Historic Landmark Designation of 311 College Avenue – The Number Nine Fire Station

6. Reports 8:20

7. Approval of Minutes (1/23 and 1/30) 8:40

8. Adjournment