It’s safe to declare this project as done. A site visit on Friday had some landscapers on site, and a small crew powerwashing the construction dust off the vertical lap siding. The final product is true to the renderings (that’s less common than one might think), the biggest difference I can see is that the pavilion used unpainted wood and corner brackets in the renders, and it’s painted without brackets here. Since the website for the apartments uses renderings in place of its “photos” page, let me be the one to supply the first photos of the finished product.
All things considered, the design is fine, and by being in a less settled part of Dryden right next to Cornell, it draws less attention from Varna residents who might otherwise not be fans if it were closer, and it’s right next to its primary place of “employment”, making for a minimal commute and lower vehicular traffic presence. In addition, with 108 bedrooms, that’s about 108 fewer students and student family members competing on the rest of the local market (these are geared a little more towards graduate/professional students, and some of those come to Cornell with spouses or children in tow).
The developer, Maifly Development of suburban Pittsburgh, did explore purchasing neighboring lots for a second development, but there are no indications that this has been pursued further. Maifly is in growth mode and purchased the under-construction project from the original developer, Modern Living Rentals, in a $2.075 million deal in September 2018.
For the sake of noting it since the emails come in regularly, the Trinitas plan down the road is in a holding pattern while they complete a study of infrastructure needs and impacts as part of the State Environmental Quality Review (SEQR). Other than that, I’m not aware of any other projects undergoing or close to undergoing site plan review in the Varna/366 Corridor.
Granger Construction of East Syracuse led the buildout, STREAM and John Snyder Architects designed the townhouse strings, GMB Consulting Services did the LEED score analysis, T.G. Miller P.C. handled land surveying and Marathon Engineering tackled the civil engineering work – Marathon’s Adam Fishel shepherded the project through the town boards. M&T Bank provided the $8.6 million construction loan.
Before:
After: