105 Dearborn Place Construction Update, 2/2019

26 02 2019

When you’re building a $4.2 million, 12-bedroom/16-person mansion for wealthy seniors, the material choices tend to be somewhat more upscale. At 105 Dearborn Place, over the typical Tyvek are a yellow waterproof barrier and traditional cedar shingles. These will be painted at a later time. The CMU block walls of the partially-exposed basement level will be layered over with cultured stone.

With the house fully-framed, the structural details are starting to show; along with banks of windows and shed dormers, and there are no less than five porches on the second level, four recessed and a more traditional open porch at the rear of the 10,930 SF building. Some of the architectural details will show up later (roof brackets, railings and balconies), and the porte-cochere has yet to be assembled.

A truck on site and crew in full plastic suits suggested that spray foam insulation was underway inside, so the utilities rough-ins (electrical, plumbing, HVAC) are probably in place, but drywall, cabinetry/fixtures, and flooring are not. The insulation is being applied by Hybrid Insulation Systems of Ithaca.

There don’t appear to be any promotional advertisements for the new building yet, but keep an eye out as it moves closer to completion later this year. Owner Elizabeth Classen has been quite busy in the past year, signing on as a partner in Travis Hyde Properties’ Library Place project on the 300 Block of North Cayuga Street.

More information on 105 Dearborn Place can be found here.

 


Actions

Information

Leave a comment