Poet’s Landing Phase II Construction Update, 11/2017

26 11 2017

For this blog’s practical purposes, Poet’s Landing Phase II is complete. At least one of the six eight-unit buildings is occupied, but perhaps only one – a woman arrived while the photos were being taken and was moving chairs out of her car. To ward off the emails pointing out its an Audi – its a 15-year old Audi, and as my buy-American family of mechanics happily relay, older Audis depreciate like stones in a pond thanks to shoddy electrical systems and high repair costs.

Even the youngest buildings in the second phase have been completed from the outside, and appear to be undergoing finish work in the interior. The last of the sidewalks are being poured and much of the lawn has grown in. With the fire-damaged building in phase one, the rebuilt units are missing some of their trim boards and architectural details (railings/column covers), but are likely to be finished before the end of the year. The inquiry page for rentals is here.

The affordable housing is much welcomed given the county’s housing woes, although a location closer to the urban core would be preferable given proximity to jobs and services. At least the site is walkable to the village. Kudos to Conifer Realty and LeChase Construction. The ceremonial opening is November 29th.


Actions

Information

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s




%d bloggers like this: