Breckinridge Place and its 50 units move closer to completion. In his last update, Jason over at Ithaca Builds noted the removal of bricks for what he surmised to be the architectural shades, although in the renderings they were located only two-thirds up the windows, rather than at the top. These photos seem to support that. The building is slated to open in early 2014, and at least from the outside, it looks like only minor work remains.
Across downtown, Seneca Way is putting the finishing touches on its eastern facade as it inches toward its opening date this month (haven’t heard specifics, so I’m assuming a soft opening). Apart from a few details like installation of garage doors on the ground level, signage and some ground work, this building is nearly complete as well. Seneca Way brings 38 apartments and 8,600 sq ft of office space to downtown Ithaca.






