News Tidbits 7/15/17: Ess Ess, Dee Dee

15 07 2017

1. Hamilton Square. There’s a lot to say here.

First, the neutral segment. The website is up, www.southstreetproject.org. Plenty of renders (definitely not cookie-cutter), site plans, housing prices, everything one needs for a fair assessment. The units are no more than 2 floors, mostly townhouse format. 47 affordable rentals units, 11 affordable for-sale units, and 15 market-rate for-sale units for a total of 73 on a 19 acre site. That’s less than 4 units per acre (0.26 acres/unit, comparable to the older 0.25-0.5 acre lots on Pennsylvania and South Streets), and fits zoning. The units are interspersed throughout the property. Parking ratio is 2 spaces per units, units are a mix of 1-3 bedrooms. There will be aging-in-place and energy efficient home options for sale, as well as in the rentals. The project will host a playground and nursery/daycare facility geared towards low and moderate-income households. Much of this comes from the result of constructive community feedback.

But what started off on a polite note is getting really ugly, really quickly. It is not a good sign when my editor calls me and tells me that, as a person of color, she felt uncomfortable at the latest meeting.

Given the transparency of this process, which still hasn’t even been submitted for formal planning board review, I find comments about this being “hidden” or rushed through to be a stretch. The project hasn’t submitted anything for formal review yet. Nothing but a sketch plan has been done, and multiple community meetings, and 30-minute small group listening sessions. It really does not get much more personal than that.

One of the questions that was raised was that people are unable there are many more affordable rentals than for-sale units. There are two reasons why that is. For one, funding for purchasable units is more difficult to get. The government is more likely to disburse a grant if it knows there are buyers waiting in the wings. That’s why the buildout for the for-sale units is 2-8 years. For two, for low and moderate-income households often don’t have much money saved for a big expense such as down-payment, and far more are capable of renting versus buying.

There are valid concerns that need to be addressed. For example, traffic. A study is being conducted with a third party. The typical thing I hear, affordable housing, or any project really, is that “they’ll lie, they’re in XYZ’s pocket”. If no one trusts you to do your job properly, no municipal board will sign off on accepting your study, and you’re finished as a firm. Likewise with stormwater analysis and civil engineering. School system capacity is checked with the district, which basically just sends a letter saying “yes, we have room” or “no, we don’t have room”. The study is being conducted and will be made public long before any approvals are granted, people can weigh in after reading it to say whether it’s comprehensive and adequate, and feel free to say something and explain why it may not be. That’s the purpose of SEQR, to determine impacts and mitigate unavoidable impacts.

On a related note, a board’s job is to review the objective components of a project. It is not appropriate, or legal, to decide on a subjective trait like whether the people who will live there fit the “Trumansburg way of life” or that the project is “too Ithacan”. Who decides what those things are? Because too quickly, it degenerates into a look or an image, and a train of thought that should never be a part of any development conversation. Because it’s subjective, those terms meant something quite different in 1997, and something quite different in 1977.

Also, there seems to be this idea that poor people in urban neighborhoods will be forced out here, and they will be a burden on TrumansburgThere are plenty of people who live and work in Trumansburg who need affordable options in a rapidly-appreciating real estate market. The one bedrooms will be rented to individuals making $22k-$48k. That could be a store manager, a barista, a school teacher or a retiree. Tenants are screened, visited at their current home and interviewed before being offered a unit. Qualified affordable home buyers will mostly be in the $42k-$64k range (80-120% AMI). Think nurses, office workers, tradespeople (following INHS’s sales deeds, I actually see a lot of ICSD teachers). The market rate units will offer whatever the market allows price-wise; new townhouse-style housing in Trumansburg would likely fetch $250k+, so think upper-middle income.

It would be nonsensical to make people in Ithaca move into housing in Trumansburg that they don’t want and would drive up their costs; however, those who want to live there, whether because they admire Trumansburg, work there, or both, will seek the opportunities it provides.

For a county that seems keenly aware of its housing issues, there tends to be an uncomfortable amount of pushback against affordable housing, whether it be Fall Creek, South Hill, Lansing or Trumansburg. Does that qualify as being “too Ithacan”?

2. Taking a look at the county’s records this week, it looks like 210 Linden Avenue’s construction loan has been filed. Elmira Savings Bank is lending Visum Development (Todd Fox and associates) $3.15 million, with $2,358,783 towards the hard costs (materials/labor) of replacing the existing 12-bedroom student apartment house with a 9-unit, 36-bedroom apartment building. Elmira Savings Bank is one of the biggest single-family construction loan lenders in Tompkins, but they have only been the lender for a few multi-family projects. The only other multi-million project in the past few years was the 18-unit Rabco Apartments at 312 Thurston Avenue in Cornell Heights – a project that, along with the cancelled 1 Ridgewood, so incensed deep-pocketed permanent residents nearby that they petitioned and succeeded in getting the city to downgrade the zoning.

Also filed this week was a $415,000 construction loan from Tompkins Trust to the owner of Hancock Plaza on the 300 Block of Third Street in Ithaca’s Northside neighborhood. The 19,584 SF shopping plaza, built in 1985, is assessed at $1.485 million and has been under its current ownership since 2002. Most might know it for the DMV, but it also hosts Istanbul restaurant, a bookkeeping service, and a gas station and convenience store that opened in renovated space in 2015. There’s no indication in the loan as to what kind of work will be performed, about $363,000 has been set aside for hard costs like materials and labor, and the work is required to be finished by March 2018.

3. Also filed in both sales and construction loans this week was paperwork for 306 North Cayuga Street, right next to DeWitt Park on the edge of Ithaca’s downtown. Also known as the C. R. Williams House, the 8,798 SF, ca. 1898 property was assessed at $900,000 and on the market for $1.4 million last year. The sale price was $1.3 million.

I was privy to an email chain that engaged an out-of-state condo developer to look at the property, but that person was not the buyer.  The LLC traces back to Travis Hyde Properties, just a few blocks away.

According to Frost Travis of THP, the plan is to renovate the live/work space to allow for more space for THP, which is outgrowing its North Tioga Street location, and four apartment units. Exterior changes will only be cosmetic, but any substantial changes will be subject to ILPC approval, as the property sits in the DeWitt Park Historic District. Elmira Savings Bank is lending $1.24 million for the renovation, of which $1,204,752 is going towards the actual construction (so apparently, this was a big week for ESB). The project is expected to be complete by next summer, according to the loan filing.

4. For the aspiring homebuilder or developer – new to the market this week, a run-down though salvageable 1830 home at 1975 Dryden Road just east of Dryden village, and 101 acres of developable vacant land currently rented out for agricultural use. The sale price is $795,000. The county GIS lists the property at 112.4 acres, but without a map in the listing, it’s hard to tell if there’s a typo or if there might be a subdivision somewhere. The assessment is for $531,900, $401,300 of which is the land. It appears the property has been in the ownership of the same family since 1968. The property is listed as a rural agricultural district, which is geared towards ag uses, but permits office, one-family and two-family homes as-of-right; multi-family and box retail require special use permits. Zoning is one unit per two acres, but in the case of a conservation subdivision that preserves open/natural space, it’s one unit per acre – either way, only about 50 units allowed here. Technically, a PUD (aka DIY zoning) is also an option, but would need adequate justification. Kinda hoping it doesn’t become conventional suburban sprawl, but will reserve judgement for when this sells.

 

5. Ithaca is once again competing for $10 million in state funds as part of the regional Downtown Redevelopment Initiative. The funds are intended to spark investment in urban cores and improve infrastructure for communities throughout the state, ten cities selected each year, one in each region. Readers may recall Elmira won last year. This year, Ithaca is competing against two of its Southern Tier peers – Watkins Glen, with which it competing with last year as well, and Endicott, a struggling satellite city over by Binghamton, that is entering the competition for the first time. Reports suggest the Ithaca submission is largely the same as last year’s. Winners will be announced in the fall.

 

 

 





News Tidbits 7/8/17: Watching the Fireworks

8 07 2017

1. A pair of major downtown projects are starting to get a move on site-prep and demolition. The Trebloc Building has been torn down to make way for the 187,000 SF, $32.9 million City Centre project.

Photo from C. Hadley Smith Collection

For a bit of historical perspective, the Trebloc Building was a sort of monument to municipal desperation. Up until 1967, the site housed several 2-5 story buildings from the late 1800s and early 1900s. Then along came urban renewal. The city had made plans to demolish the buildings and sell the lot to a bank tenant, who would build a new office and help revitalize the city’s run-down downtown. But after demolishing the building, the potential bank tenant never followed through on its original intent, and the city spend years trying to sell the lot, which was used for makeshift parking in the interim. Finally, they found a buyer in the Colbert Family doing business as the Trebloc Development Company. The Trebloc Building was originally planned to have two floors, but financial troubles had reduced it to one before it finally opened for business in 1974.

One could argue that nothing quite represented the nadir of Ithaca’s downtown quite like the struggling, unloved and unlovely Trebloc Building did. There are some buildings worth fighting for, and even some mediocre ones that come down with a bittersweet sentiment. This was neither.

Perhaps unhappily for downtown businesses, City Centre will be under construction for quite some time; adjusting the estimate given to the IDA, late 2019 or even early 2020 is possible.

Meanwhile, just a couple blocks west, Harold’s Square is also gearing up for demolition of 123-135 East State Street. Unlike the Trebloc teardown, Developer David Lubin will be deconstructing the existing structures, so that their components can be re-used (the process will be managed by Finger Lake Re-Use). I’ve always been kinda partial to the green tile on the former Race Office Supply, so hopefully that goes to a good home. 137-139 East State will be renovated as part of the Harold’s Square project. Harold’s Square, a 180,000 SF building with a hard construction cost of $32.6 million, is expected to take about 18 months, opening in Q1 2019. Dunno why City Centre’s construction schedule is a year longer, although with the underground garage, the project is a little larger (211,200 SF), and more structurally complex. It could also just be a very generous estimate.

2. Tompkins County will be hosting a meeting at the Museum of the Earth on July 19th at 7:30 PM to discuss plans for the Biggs Parcel on the town of Ithaca’s portion of West Hill. As covered previously, the 25.5 acre parcel, which has something of a long news history, has been for sale since last summer, but without any firm offers, the county ended its realtor contract and has been trying to figure out with to do with the property. Although there are some streams and wetlands, there are some development possibilities; neighbors have been pushing for it to be a county-owned natural preserve, but the county wants an option that will pay taxes, whether that be a multi-family development, private estate or otherwise.

While the county did not identify this parcel as a high environmental protection priority, they are busy working with Finger Lakes Land Trust to protect a 125-acre property in Caroline, and there are ongoing discussions regarding a 324-acre property in Dryden.

3. As with nearly every sizable project in Tompkins County, the Inn at Taughannock expansion is being met with some resistance from neighbors. As relayed by the Times’ Jamie Swinnerton, arguments cited include traffic, view sheds, size, neighborhood character (which seems a bit weird, given there’s not much of a neighborhood nearby), and most frequently, noise, which the town could help resolve by asking for an acoustical counsultant’s report like what Ben Rosenblum submitted in Ithaca for his cancelled proposal for a jazz bar at 418 East State Street. The addition, which calls for a new restaurant, event space and five guest rooms, would create about 25 jobs if built and opened as planned. The often-joked but actually rarely-seen email calling me a “thoughtless corporatist” arrived in the inbox after the first write-up, which indicates this fireworks show may not be over for a little while.

4. In a bit of a weird hang-up, the Heritage Center project attempted to give itself a formal name, but the name was shot down by the County Legislature. The proposed moniker of “Tompkins Center for History and Culture” was defeated in a 7 yes -3 no vote (8 yes votes required) because a few of the legislators felt there hadn’t been enough time to gauge community reaction. Personally, I thought “Tompkins County Heritage Center” was fine, but to each their own.

5. Thankfully, the county’s endorsement of the Housing Strategy was unanimous. This is but a baby step in solving the county’s housing woes, but it’s an important step. The county now has a sort of guiding document to help address issues in adding and improving the local housing stock.

There are a few key things that the county will need to adhere to when moving forward. First is working with communities to identify suitable areas for development, and making updates to infrastructure and zoning to guide developers towards those properties instead of far-flung, natural areas where acquisition costs are low and there are fewer neighbors to contend with. Second is bridging the affordability gap – some of this can be done by encouraging new housing at market-rate, but the county will need to be constructively engaging and reliable when helping affordable housing plans apply for grants or exploring tax incentives to help make their proposals feasible.

The third, and arguably the most controversial point here, is standing firm in the face of opposition. Many Tompkins residents are averse to new housing (or really, new anything) near them. For example, consider the Tiny Timbers plan recently announced for Lansing Town Center. The plan checks a lot of boxes – at $175-$225k, it’s fairly affordable owner-occupied new housing, with a smaller ecological footprint than many detached single-family homes. Yet, in the Voice comments, it was dumped on as both a glorified trailer park and unaffordable at the same time, and the neighbor who tried and failed to buy the property from the town to prevent development was trying to scare people from small house living (which at 1000-1500 SF, these aren’t really “tiny” houses anyway). The county should listen for the sake of good government, but after weighing the argument, unless a project is truly a detriment to a community’s quality of life, the county and local boards will need a firm backbone in withstanding criticism. It also helps if people who like a project give their two cents in an email or meeting.

So, good first step, but there’s a lot of work ahead. Fingers crossed.