Here’s the semi weekly digest for your mid-summer doldrums…
1. Yet another round of Carey Building design tweaks. Updated renders and more here. At least now the renders include the proposed Hampton Inn to its north, which shows just how dense this corner will be (not unlike its historical precedent, when the massive Strand Theatre occupied much of the block). Better yet, that blank wall on the west face has windows and will be home to a “art wall” for a mural. The roof and facade have been tweaked since the last update, and I think it’s fair to say that this is a substantial improvement over the initial proposal.
2. I had the updated PDF of the 323 Taughannock Boulevard proposal stored away for the next news update, but Jason at IB wrote an in-depth article about the development in the meanwhile, which is much better than a blurb on this blog. Most notably this time around is the inclusion of color renders, which is just as much a hodgepodge of influences as the design itself. The 20-unit, 23,000 sq ft, $3.5 million waterfront development would be under construction in the first half of 2015, if approved. Replacing a run-down waterfront bar, it has the potential to pioneer development of Ithaca’s waterfront, where controversial zoning was passed in 2011 to allow for larger projects such as this.
3. Now for something different. The project on Troy Road in the town of Ithaca is trapped in the red tape. At last check, the developers, the perhaps disingenuously-named Rural Preservation Housing Associates, were trying to figure out where to go, as they’re having difficulties gathering enough support from the town board for a Planned Development Zone. This PDZ is required because the project proposes 166 units; the max under cluster zoning, which doesn’t require a Town Board-approved PDZ, is either 153 or 154. According to a recent town Planning Committee meeting, the alternative to the 154 or so clustered units is up to 104 units of even more sprawling single-family housing (52 lots with two units each), which is within zoning and could be rented out if they have trouble selling. The developers have been considering community meetings to quell public dissent and to learn what would get the PDZ apartment development passed. For the record, they’ve said they are open to prohibiting undergrads from renting and occupying units, which is possible since students are not a protected class under the law.
TL;DR – it’s a mess. I’ll add that in with the Biggs parcel issue, and the (weakening) opposition to INHS’s Greenways in East Ithaca, that the town has achieved the trifecta of development battles on all of its hills.
There was an interesting housing study that I came across for the Troy Road parcel, created by some Cornell City and Regional Planning (CRP) students for a course. The first phase as designed by the students would have 14 affordable (owners making 80% of county median income) housing units with 11 1180 sq ft. 2-bedroom and 3, 1355 sq ft. 3-bedroom homes, utilizing state tax credits to keep sale costs between $140k and 155k. Their proposal would have require changing the current zone from low density to medium density, which would have made such a project a non-starter.
4. Meanwhile in Lansing, they’re weighing in on 102 townhomes. If Ithaca were an island, anti-development could be great. But since other towns are building housing and adding residents that will travel through the town to get to the employment centers in the city, then the residents of the town of Ithaca had better figure out a more effective strategy to managing growth other than knee-jerk no’s.
5. Some members of Ithaca’s West Hill community listserve is engaged in a thought exercise – seceding from the town and making their own village to specifically oppose any development proposed in their community. This isn’t without precedent; the village of Lansing was founded in 1974 due to fears stirred up by the construction of Pyramid Mall. West Hill, in turn, fears housing, especially low-income housing, due to the negative influence from low-income, high crime apartment complexes such as West Village. The “Minority Report” that they gave to the town planners was described as “a polemic of the proposed [Comprehensive] Plan as a whole, and offers few comments on any specific goals and recommendations“, and the town spent six pages excoriating the bombastic report. It’s another TL;DR for most, but the gist of the West Hill Minority Report is that the town encourages sprawl and ghettos and should only allow very small areas for development, even deconstructing some currently-built areas due to an increasingly unsustainable environment. I understand their angry reaction due to the high crime in southwest Ithaca, but all this is the administrative equivalent of over-correcting a car in a skid.
6. And then there were 5 – Since INHS is focusing on the Neighborhood Pride site, the non-profit is withdrawing from old library competition. Looks like John Schroeder can add DeWitt House to his entries in his “Unbuilt Ithaca” book draft. But don’t worry, they’ve already starting working towards redevelopment of the old grocery store, by issuing a request for qualifications (RFQ) for those interested and capable of designing their new infill project.
7. At a glance, this call for bids on this parcel of city land at Five Mile Drive would seem to be wide open…except a local green housing developer has been targeting this plot for quite a while. It’s a bit like advertising a job when you already have someone lined up for the position. Oddly enough, I have yet to hear opposition this one; maybe it’s too far south for West Hill to care.
8. Lansing village is getting a mosque, according to the Star. The project, to be built at 112 Graham Road by the Al-Huda Islamic Center of the Finger Lakes, will result in a 4,828 sq ft mosque, with a small minaret if money provides.
I’m anxious for the zoning board to approve the Carey Building appeal. I really like the new renders, and can’t wait to see the real thing.
I was glad to see most of the public comments made regarding the Library Site were in favor of condos. I hope that means DPI has a good shot at getting the nod for developing the site.
BC, I was wondering if the Zoning Board had made a decision yet on the Carey Building appeal. Any Word?
[…] the PDC meeting on the 26th. Stone Quarry and the Marriott are up for revised final approval. The Carey Building addition, 205 Dryden (Dryden South) and 307 College (Collegetown Crossing) are under consideration for final […]
[…] thing that’s the same is the footprint. Part of these changes are likely the result of the Carey Building addition planned next door – the blank wall shown below faces the Carey’s rear […]
[…] only thing that’s the same is the footprint. Part of these changes are likely the result of the Carey Building addition planned next door – the blank wall shown below faces the Carey’s rear […]
[…] 2. Looks like the land sale for the Amabel project is in the works after falling a little behind schedule. 617 Five Mile Drive is tentatively selling for the minimum price (the tax assessed value of $16,875), after New Earth Living’s initial bid for $10,000 was rejected. City gets money, land gets sold off and added to tax rolls, and down the line it gets used for housing. Win-win. I win as well, for a correct if easy prediction. […]
[…] in Lansing was purchased for $64,900 on January 29th. The special permit for a religious building was approved by the village back in August of last year. The cost of construction is expected to be in the range of $600,000, […]